低电压穿越

2010-10-08 3页 doc 69KB 20阅读

用户头像

is_938381

暂无简介

举报
低电压穿越3 3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code •2001年之前: ​ 德国电网上的风电机组在电网故障时都会切除。 •2001年: ​ 简单的Fault ride through的要求,实现故障后有功支持。 ​ AGO 1 (Advanced Grid Option 1) ​ Vestas解决方案:在定子回路接入电阻,150~200ms,无功功率不控制 •Before 2001, wind turbine may trip during grid disturb...
低电压穿越
3 3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code •2001年之前: ​ 德国电网上的风电机组在电网故障时都会切除。 •2001年: ​ 简单的Fault ride through的要求,实现故障后有功支持。 ​ AGO 1 (Advanced Grid Option 1) ​ Vestas解决:在定子回路接入电阻,150~200ms,无功功率不控制 •Before 2001, wind turbine may trip during grid disturbances. •At 2001: ​ Simple Fault ride through for post-fault active power output. ​ AGO 1 (Advanced Grid Option 1) 3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code􀁺 •2003年之后: ​ E.on提出更高要求,Voltage tolerance curve 要求无功电流贡献以控制电压。 ​ AGO 2 (Advanced Grid Option 2) ​ 风电场本身有无功支撑能力,利于恢复,能够支撑电压。 •After 2003􀂾 ​ More requirements were asked by E.on. Reactive current is required to contribute for voltage control􀂾 ​ AGO 2􀂾 ​ Wind farm reactive power capability is required to suppurt the voltage restore. 3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code 德国LVRT能力规定(高短路电流) LVRT requirement for High short-circuit current 3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code 德国LVRT能力规定(低短路电流) LVRT requirement for low short-circuit current 3.3 德国低电压穿越要求E.onrequirement in Germany Grid Code •有功输出在故障切除后立即恢复并且每秒钟至少增加额定功率的20%。阴影区域中,有功功率每秒钟可以增加额定功率的5%。 •􀁺Active power output must resume immediately following fault clearing and be increased with a gradient of at least 20% of the rated power per second. Within the shaded area the active power increase can take place at 5% of the rated power per second. 3.3 德国低电压穿越要求 E.on requirement in Germany Grid Code 网络故障时,机组必须能够提供电压支持。如果电压降落幅度大于机端电压均方根值的10%,机组必须切换至支持电压。无功功率的提供必须保证电压每降落1%的同时无功电流增加2% With a disturbed network the generating units must support the voltage. If a voltage drop of more than 10% of the root mean square (r.m.s.) of the generator terminal voltage occurs the generation unit must be switched over to voltage support. The support of the network voltage must be provided within 20 ms after fault identification by providing reactive power at the generator terminals with a factor of 2% of the rated current per percent of the voltage drop. Switching back from voltage control to normal operation is possible after 3 seconds.
/
本文档为【低电压穿越】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索