为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

Lol S4新版小鱼人技能介绍及加点

2017-09-02 12页 doc 186KB 69阅读

用户头像

is_079973

暂无简介

举报
Lol S4新版小鱼人技能介绍及加点Lol S4新版小鱼人技能介绍及加点 技能介绍: (Q)淘气打击 讲解: 前期耗魔量不高而且位移速度很快,逃跑追击都行,优点是可以把与敌人的距离拉开或拉近。 使用同时可触发攻击特效,武器以及自身技能都可以,比如搭配或,可以直接触发被动效果,不需要使用普攻来触发。而自身技能,如果在Q之前先按一次W,就等于使用一次Q,就附带了一次W的附加伤害和被动伤害。另外Q本身的普通攻击效果也可以出发类似等装备。 使用诀窍:逃跑时,可以先躲进草丛,接著等敌人和你的距离最近的时候按Q冲出去,就可以冲出最远的距离,以便跑路。 (...
Lol S4新版小鱼人技能介绍及加点
Lol S4新版小鱼人技能介绍及加点 技能介绍: (Q)淘气打击 讲解: 前期耗魔量不高而且位移速度很快,逃跑追击都行,优点是可以把与敌人的距离拉开或拉近。 使用同时可触发攻击特效,武器以及自身技能都可以,比如搭配或,可以直接触发被动效果,不需要使用普攻来触发。而自身技能,如果在Q之前先按一次W,就等于使用一次Q,就附带了一次W的附加伤害和被动伤害。另外Q本身的普通攻击效果也可以出发类似等装备。 使用诀窍:逃跑时,可以先躲进草丛,接著等敌人和你的距离最近的时候按Q冲出去,就可以冲出最远的距离,以便跑路。 (W)海石三叉戟 讲解: 线上对拼的时候,敌方英雄生命值越低,小鱼人对其伤害越高,而且还可以减少目标50%治疗效果,这会让一些靠回血撑线英雄很恼火()。如果敌人很肉,或者抗性比较高,我就会优先点满这技能()。 (E)古灵,精怪 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 讲解: 小鱼人的精华技能,可以穿墙,可以躲伤害(包括普攻和魔法伤害)。使用E的时机非常非常的重要,少了E的小鱼人非常的弱。轻易用掉E技能很容易被针对,弄不好还有可能被反杀。 我这裡要讲解一下古灵和精怪的区别及使用时机: E1=古灵(按一下E) E2=精怪(按两下E) E1或E2的位移距离都比远。 E1有缓速效果,所以如果敌人在施放范围内想逃走用E1缓速,E1的攻击范围也比E2广泛,清兵的话使用E1。 E2并不是像E1一样0.75秒后才落地,所以你如果要秒杀掉敌人建议用E2。E的伤害只有一次,E1是你在哪里E起来,然后原地掉落,E2则是在第二段E的时候在你指定的位置掉落。E1后使用有伤害效果,而E2后使用则没有。 使用技巧:翻过墙在迅速E回来,E2可以用来探测墙另一面敌人。 E1对比E2: *位移距离:E2>E1 *缓速:E1 *秒杀:E2 *攻击范围:E1>E2 *穿墙:E2>E1(E2成功率比较高) (R)巨鲨强袭 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order LOL大神集中营www.09784.com 讲解: 这技能除了攻击力高以外,最有用处的是可以缓速和击飞(中断技能),小鱼人在追人的时候只能用或来拉近距离,但如果你用了拉近距离以后,对方就很有可能把你反杀,所以说黏住敌人有了缓速以后你有办法先Q或E敌人到来进行连技。 某些情况下你不一定要瞄准敌人,你可以预判敌人的走位,被鱼黏住或是被攻击都会有1.5秒减速。 使用技巧:如果直接丢鱼对方有闪现的话可能会直接闪走,从看不见的地方丢鱼会有意外的效果,或是丢在草丛裡让敌人走过去 使用技巧:预判很重要,草丛阴人也很重要。 鱼只有中心能黏住敌人,但是鯊鱼出来的时候如果还没离开范围就会被攻击并且减速。当敌人使用地图传送的的技能时,可以把鱼丢到敌人身上可以让鱼连同人一起传到该点位置(,,传送) 鯊鱼的击飞可以把隐形的打现身,如果打中隐形的敌人(雷恩加尔,老鼠)则鱼黏著的期间敌人会现行,当1.5秒后鯊鱼出现后,隐形的敌人则会恢复隐形。 使用技巧:和敌人保持距离,迷惑对方,然后甩个大过去给他减速,然后突过去秒他。当然这是建立在你能秒他的情况下。 (被动)灵巧海族 讲解: 无视碰撞是我非常喜欢的一个被动,如果要接近敌人的话可以直接穿过兵不会有卡兵问题(这技能其实有个Bug,如果用了E1有时候会有单位碰撞) 减少普攻伤害让小鱼人清兵受到的骚扰减少,搭配多兰之盾对线遇到或之类的骚扰型英雄时,可以刷钱刷得舒服点。 技能加点与连招: 如果对手非常的坦和血厚,主副有点再加。主W是因为血量from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 百分比伤害对坦克类英雄效果非常有用。 如果正常情况下请用这套,主副有点再加。这套点法可以让瞬间伤害达到最高,对抗中路脆皮法师来说杀伤力爆高。 点燃闪现是我最常用的组合 我以前都是用点燃光盾,光盾有时候可以用血量骗到对手 不过闪现能做的事情太多了,杀后排有闪现真的简单很多 疾跑我试过,我认為只有在玩攻速流的小鱼人用比较合适。 或者带点燃传送,上下Gank,让对手三路都崩掉。 或是说你的对手是很会上下gank的英雄() 如果你要带传送建议你先对小鱼人有一定的了解再说。 正常 硬拼!对面不死也要回家! 认怂的时候就带着套。 带线,gank,追人。 对自己的操作无比自信,觉得不需要闪现的,可以带着套取gank。 技能连招: 一种是先丢。这种攻击方式会让对手意想不到,适合拿来开战或秒对手。 1.让对反应不及,对手如果或跑走用WQ追上。 2.走进攻击范围WQ对手,他如果或是想用技能,马上用E躲掉然后踩在他头上。 3.另一种则是先WQ近距离放大或是等敌人闪开时放大在等在机会E 这种情况通常是打EZ,VN,格雷夫斯这种角色会飞来飞去的角色会用到 你也可以搭配,WQ进去。 对线有一种连招可以让你安全的一套杀完马上回家,就算对面打野来也没用, from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order LOL大神集中营www.09784.com 消耗敌人一波,看准时机R开大E跳到对手后面WQ回来。 在开打时绝对要算好蓝耗,千万不要qw到一半没魔用E,前期换血QWE大概需要190的蓝。 整套QWER大概需要285的蓝耗。最保险的量是400左右。当小鱼人9级后E的CD很短,如果有400蓝,杀完人后还有一次E回来的机会。如果是塔杀可以用这最后一下闪塔攻击或是躲敌方的支援。 本文来源:www.09784.com from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
/
本文档为【Lol S4新版小鱼人技能介绍及加点】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索