为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

疯狂的简笔画 大人小孩都可以学

2017-10-06 37页 doc 718KB 23阅读

用户头像

is_477730

暂无简介

举报
疯狂的简笔画 大人小孩都可以学疯狂的简笔画 大人小孩都可以学 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the s...
疯狂的简笔画 大人小孩都可以学
疯狂的简笔画 大人小孩都可以学 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm)
/
本文档为【疯狂的简笔画 大人小孩都可以学】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索