英文会议纪要模板英文会议纪要模板 页眉:自己填写 Project: Geotechnical Investigation at Ibity Holcim Cement Plant Meeting Date: 13/06/2012 Meeting Time: 15:00 Recorder: Tony Location: Antananarivo, Madagascar Present: Michele Franchi Geo-eco Consult Toky Holcim Representative Hua Kefu ----...
英文会议纪要模板
英文模板 页眉:自己填写 Project: Geotechnical Investigation at Ibity Holcim Cement Plant Meeting Date: 13/06/2012 Meeting Time: 15:00 Recorder: Tony Location: Antananarivo, Madagascar Present: Michele Franchi Geo-eco Consult Toky Holcim Representative Hua Kefu -------- Cement ------ -------- Cement Pang Guoqiang --------- Cement This meeting reaches agreement on the following issues: I. Geotechnical investigation contractor and Holcim have discussed the old payment terms and formed a new payment term in the contract. Both sides agreed that the new payment terms which should be prescribed in geotechnical investigation contract to replace the old term. II. Geotechnical investigation contractor pointed out that article 6.2 on contract agreement which is not acceptable according to Madagascar law. Contractor required that penalty value lower to 0.3% of the total contract price per day.Huaxin agreed this comment and modify this value to 0.3%.It will be prescribe in the geotechnical investigation contract. III. As for contractor’s timing of work, Huaxin cement think that it’s too long and can not accept that total work timing. So contractor’s complete work timing is pending. IV. Due to the EPC contact negotiation between Holcim and Huaxin is suspended, Huaxin can not sign the geotechnical investigation contract right now. However, both sides (--- & ------) agreed the geotechnical investigation contract contents. This contract will be affected on the date signed. 页眉:自己填写 V. Contractor agreed to perform three continuous core drilling for knowing soil layer classification on site. A detailed boreholes layout with different types of tests mark out should be instantly returned to Huaxin after finish the first three continuous core drilling. VI. For site topography surveying, Huaxin required that six control points are needed for that topography survey. Contractor agreed this suggestion. VII. Contractor agreed to supply a site seismic report. VIII. Huaxin required that contactor should reduce the amount of PLT (plate load test) to an appropriate number based on actual site situation. Previously PLT amount is 30 which are too much. Contractor agreed this comment. IX.Annex: Contract
/
本文档为【英文会议纪要模板】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索