ÍùÁ?µãµãÍ???Ïí×ÊÔ???ÁË?â?ü?àÇëµÇÂ?www.WL566.com
Ò???Ä? Ç×
ÄãµÄÀáË?ÊÇÎÒµÄÓÇÉË ÄãµÄÐ?ÈÝÊÇÎÒµÄ??Î? ÄãµÄÌÛ??ÊÇ×îÎÂÅ?µÄÑÔÓï
ÈÃÎÒ?áÇ? ÄãµÄÊÖ?Û ÊÇ×î?óµÄº??Û ÈÃÎÒÈö?? ÎÒÊÇÄã?ª??ϵÄ?ÒÇ?
ÄãÊÇÎÒÐÄÖÐÓÀÔ?µÄÒÀÁµ Ä?Ç×?ª?ªÄãÊÇÎÒÉúÃüµÄ?ÒÏç
?þ??ÓÀºãµÄÂèÂè
µ?µÚÒ??ÎÕö?ª?õÉúµÄË?íø ×îÏÈ??µ?µÄÊÇÈËÄ?µÄÎÞ?ÈÊ??à ?È??µÄíûÊÓºÍÐÀÏ?µÄÀáÁ??ª?ª
ÑÛ??Ò?Õ???Õ???×ÐÏ?µÄ??×ÅÄã ÄãëüëÊÎÞÖªµÄÐÄ??ÄܵØÂÉ?? È?ÎÞ???íÊöÇ×ÇéÖ?Ò?ÕóËÄÖ?ÂÒÎè
??µÃÄã?ª?ªÈÌ??×??óÉùÌä?Þ ?,?ý?àÉÙ?öÈÕÈÕÒ?Ò?µÄ??Óý ÖÕÓÚ×øÖ?×ÓÄãÐ?Ð?µÄÉíÇû
ÔÚµ?ÕûÁËÇéÉ̺ÍÖÇÉÌÖ?ºó ?ö??µÈ?ý????Ö?º??öÁËÉúÃüÖÐ ×îÕä??µÄµÚÒ?Éù?ª?ªÂèÂè
ÕâÊÇ×î?ÐÈ˵ÄÔ,Ê?ÔÌÐî ÎÞÂÛÊÀ?çÉÏÁ?ÔÏ×Å?àÉÙÖÖÓïÑÔ Ö?ÓÐÕâÒ?Éùºôº??ø?ÔµÄÏàÍ?
Ã?ÓÐÊ?Ã?ÀÖÒô??Ã?ÓÐÊ?Ã?Ê??è ÄÜ?ÈÕâÒ?Éù?ü??ÈË
ÌÕÈóÖ? Ä???Ê??è
ÎÒ×ßÁË??ÂèÂè ÎÒ×ßµÄÊ?ºò àßÒ??ôÀáË?
Ã?ÓÐ?ØÍ? Ã?ÓÐ?Ò?ØÍ? ÎÒÖªµÀÄÇ???,ÒâµÄ?ØÊ×
?áÈÃÄãµÄ???,ÒâµÄÑÛÉñ ÐÁËáµÄÐ?ÈÝ??ÎÒÍìÁô ÎÒÖªµÀ ÄãÁ?ÉÏÒ????Ò×ÅÎ?Ð?
?ÉÄãµÄÐÄÔÚÁ?Àá????ÂèÂè ?ùÐÄÀïÃ??× ÄãÖ?˵ÁË?ä?ºÈ??É??º?×Ó ?ë×Ó?éÊ???ÂèÂèµÈÄã
ÎÒ×ßÁË??ÂèÂè ÎÒ×ßµÄÊ?ºò àßÒ??ôÀáË?
Ã?ÓÐ?Ò?ØÍ? µ?ÎÒת?ýÃÅÇ?µÄÄÇÆ??ãÁÖ
Äã?????ûÎÒÁË µ??ãÁÖÄÇʪʪµÄÀáÓê?ÓÐÄÀïÁ??ö Äã?????ûÎÒÁË Ö?ÊÇ????ÂèÂè
ÎÒÔÙ??ÄÜÒÖÖÆ??ÔÙÄÑÖ?×?ÈçÏßµÄÀáË? ÎÒ?ØÍ?ÁË??ÂèÂè ÎÒ?Å?Ò?ØÍ?
ÎÒ??ÊÇ?ØÁËÍ? ???ÜÀáÑÛ?????û?ÆÍÁ µ?ÊÇÎÒÖªµÀ
ÂèÂè??Äã??ÔÚ?öÃÅÕÅÍûÄãµÄ?ù×Ó
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
?Ã?õÄ????Ô??ØÍ? ?àÉÙ?ÎÃÎÖÐ?Þ×Å??º?×Å ÂèÂè??ÎÒÒª?Ø?Ò ?àÉÙ?ÎÃÎÖÐ???û??ÂèÂè
ÄãÓÃÄãÎÂÅ?µÄÊÖÇáÇáµØ ??Ãþ×ÅÎÒ?ÞÆüµÄÉË?Ú Å???ÂèÂè
ÎÒÖªµÀ??ÄãÒ?Ö?ÔÚÎÒÉíºó
?ø×Å?ÄÀøµÄÄ??â º?×ÅÏ?ÒíµÄÑÛÉñ ?Ò×ŵÈ?ýµÄÐ?ÈÝ?,?, ÎÒÖªµÀÁË??ÂèÂè
ÄãÒ?Ö?Õ?ÔÚÎÒÉíºó Ã?µ?ÎçÒ?ÃÎ?Ø ×ÜÓÐÒ??öÉùÒô?ºÈ??É??º?×Ó ?ë×Ó?éÊ???ÂèÂèµÈÄã
ÊÇѪÓëÂöµÄÏàÍ?ÏàÈÚ ÊÇ?ùÅ?µÄ??Ä?Ç×µÄÍ?
[Ê??è]Ä???
Ä???ÊÇ?ßÉ? Èç?˺ñÖØ Ä???ÊÇ?óº? Èç?ËÅìÅÈ Ä???ÊÇÐ?Ϫ Èç?Ëä?ä???Ï?
Ä???ÊÇÃÀ?Æ Èç?ËÔ??ÂÔ??? Ä???ÊÇ???ó??ÉîµÄÊé ×ÖÀïÐÐ?ä??Í?Â?×Å??
Ä??? ÓÌÈç?ºÌìµÄ?ç ËýÇáÇá???ý ?óµØ?Å?áÒ?Æ?ÂÌÉ? Ä??? ÊÇÌìÉϵÄÔÆ
×ÜÈÃÁÒÈÕ ÏÈ?ÓËýµÄÉíÇý???ý ?ø?óµØºô?ç??Óê?µÏéºÍ Ä??? ÊÇÓêºóµÄÏ?
×ÜÈÃÇåÏ??ýµÄ?óµØ ??ÆúµÄÌÉÔÚ??Àï ?ÑÆß?ÊÈËÉúÃÎÆ×Ð?ÔÚ?ß?ßµÄÌì?Ê
Ä???/ÇåÁ??ÓÊ?
?ËÎÄÏ×?øÄÇÐ?ÔÚÍâÎñ??µÄÄêÇáÂèÂè
Ä???ÊÇ?õÉýµÄ??êØ ?øÉÏÁËÔÆ?ÊÒªÔ?ÐÐ ÄêÇáµÄÂèÂè ??ן?Ë?µÄ?ù×Ó
ÉîÇéÒ?ÎÇËûµÄÐ??î Ò?ÐÐÑÛÀá ÔÚÈçÐÓµØÑÛ?ôÀï?òת Ä???ÊÇÒ?ÍíµÄÔÂ?â ×ÜÔÚ×îÐèÒªµÄÊ?ºò ?ÓÇ?ÀïÖ?ÍâÒ?Òª?Ö?öµç?? ÈÃ?ùÌýµ?ÄÇÔÚ
ÄïÌ?ÀïµÄÉùÒô ÄÇÊÇ??Ïê??Äþ??ÒôÀÖ Ä???ÊÇÊý×ŵÄÈÕ×Ó ÇÐÇеÄÅÎÍû
ÔÚÁ?Ë?ÏßÀïÊý×ÅÎÞÒÔÊý?ƵÄÎï?þ ÐÄÀïÏë×Å?Å?þ?öÔÂ?óµÄÄã
Ëý??ÊݵÄÉíÓ? ?ø?ÔÉÏ×î?îµÄ?Ë ??ÉÏ×î?ãÒ˵ÄÒ ÄãÃÀÀöµÄÂèÂè
Ò?ҪΪÄã?ÄÉÏ ÄãÏ???µÄÒÂÉÑ ?É??µÄÍæ?ß ??×ÅÄã?ßÐË ÔÙÀÛÔÙÐÁ?àÒ?ÊÇÌð
Ä??? ÊÇ?ßÉ????óº???Ñ?µØ???ÝÔ, ÊÇÊ?µÄ?ªÕ ÊÇ?ð?âµÄî??? ÊÇÊ?Õâ?öÊÀ?çÉúÉú??Ï?µÄÁ?Á?
ÊÇ?ÅÏïÀïµÄÐ?Õ? ÊÇÏ?ÓêµÄÇïË? ÊÇ?ÌÌÃÀïµÄÖÓ ÊÇË?Ë?Ö?Ô? ÊÇ??ÉñÖ??? ÊÇ???à???í?ã??ÎÞ
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
Ë?µÄ×ÔÈ?Ö??ù
Ä? Ç×
ÂèÂè×ÜÊÇÄÇÃ??ÈÏé?ÉÇ×?? ËýµÄÑÛÉñÏñÔÂ?âÒ?ÑùÈáºÍÃÀÀö?? ð??à?øÓÖÒ?Ô?µÄÈ?ÔÚÎÒµÄÐÄÉÏ??
ÈÃÈË?Ð?õ×ÜÊÇÄÇÃ?ÎÂÐÄ??
Ä???ÊÇÄÇÃ????ó????ÏñÒ?ÂÖÌ?ÑôÒ?Ö?ÕÕÔÚ?ùÅ?µÄÉíÉÏ??ÉËÐÄ??Ê?Òâ??ÂäÄ?µÄÊ?ºò??
ÏëÆðÂèÂèÐÄÀï?Í?õµÃÅ?Å?µÄºÜÌ?ʵ??ÒòΪÄúÓÀÔ?ÊÇ?ùÅ?ÎÂÜ?µÄ?ÛÍå??
ËêÔÂÔÚÄ?Ç×µÄ?îÍ?ÁôÏÂÁË?×É????È??µÄË?íøÒ???ÂúÁËÏ?ÎÆ??Ôø?,ÄêÇáÃÀÀöµÄÂèÂèÀÏÁË??
ÔÙÒ???ÊÇÄÇ?öÈ?ÍÑ???ÉÁ?µÄÅ?ÈËÁË??Çé?ÐÒ??????àÈõÆðÀ???
ÂèÂè?äµÃºÜÒÀÁµÅ??ù??Ã?Ò??ÎÀë?ðËý??ÊÇÄÇÑùÒÀÒÀ??Éá??
Ñø?óµÄÅ??ùÈçÐ?ÄñÒ??ã?ÉÔ???ÎÒÃÇÕñ?á?ø?É??ÏèÀ?Ìì??
ÁôÏÂ?µ?ÄêÀϵÄÄ?Ç×?À×ÔâêÍû??Ë?Äî??ÈÕÈÕÆÚÅÎ×ÅÎÒÃǵÄ?éÀ???
ÄÇÒ?ÖÖÇéË???Ò?ÍòÁ??ð×ÓÒ???ÄÜ?íÊ?ÎÒµÄ?Ð????
?øÎÒÊÖÖеÄ?ÊÓÖÔõÄÜÇãËßµÃÁË??Òò?ËÎÒ??ÐÄËù×?µÄÊ?ƪ??
ÒâÒåÈ?ÎÞ??
Ó×Ð?µÄÉúÃü ÔÚÄ?Ç×ÌåÄÚµ?Éú ÑøË?Ä?Ò?ÉùÆÆÁÑ ÍÑÀëÄ?Ìå À?µ?ÈËÊÀ
?ùÊ? Ä?Ç×µÄ?ÙÀͺÍ???? Ö?ÓÐ?ÉΪÈË??Ê??ÅÌå?áµ? ÄêÓ×Ê?
Ä?Ç×µÄ?Ì?å ÒÀÏ??É?û ÇàÉÙÄêÊ? Àë?ªÄ?Ç× µ??ÇÀï?Á?ßÖÐ
Ä?Ç×Ã??ÎÀ???ÍûÊ? ???øÉÏÇ×ÊÖ×öµÄ?Ë ?ÉÄêÊ? ÀëÄ?Ç×?üÔ?ÁË
µ?ÁËÇ?ÀïÖ?ÍâµÄ??Ôº Ã??ÎÄ?Ç×?òÀ?µÄµç?? ?ß?ÙÖÐ?ÐÔÓ×ÅÎÂÅ?
?ùÐÐÇ?ÀïÄ?µ?ÈÅ ÊÇ×îºÃµÄÚ?ÊÍ Å??ûµÄ???ÎÌ??Ò Ä?Ç×ÔÚÖò?âÏÂ?ì??×ÅÒÂ?þ
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
ÎÒÕæÕýÁìÎòÁË "?ÈÄ?ÊÖÖÐÏß ÓÎ×ÓÉíÉÏÒÂ"µÄÄÚº, ?É?Òºó
Ã??Î?ø×ÅÎ???µÄÀñ?ð ??ÍûÄ?Ç× Ä?Ç×Á?×ÅÀá
??Ô?ÒâÊÕÏ ?ËÊ? ÎÒµÄÑÛÒ?ʪÈóÁË Ä???Èçº? ÊÇ×îºÃµÄÚ?ÊÍ
Ú??èÄ?Ç×µÄ?ñÑÔ??Ë×ÓïÀà?º Ä???ÊÇÒ?ÖÖ?Þ?óµÄ?ðÑæ???ª?ªÂÞÂü.ÂÞÀ???????
Ä?Ç×µÄ??ÊÇÓÀÔ????á?Ý?ßµÄ???ª?ª?Ô?ìÂå?ò??ËÕ??
Ä???ÊÇÅ?ÈËÐÄÖÐÊÇ?òµ???×ÔÈ????áË???ÓÀ??Ë??ßµÄ??Î????ÍÏñÊÇÉúÃüµÄÒ??óÒªËØ???ª?ª
?Í?ûÔú?Ë??????
Å?ÈË?ÌÈ?ÊÇ?àÈõµÄ??µ?Ä?Ç×ÊÇ?áÇ?µÄ???ª?ªÓê?û??????
ÂèÂè??ÄúÊÇÄ?Ç×??Öª?ººÍÅóÓѵÄÍêÃÀ?áºÏ???ª?ªÌ??ê?û??Ó??È??
Ä??????ö?öÊÇÖ?Ä?Ç×?Ôº?×ÓµÄ????Ò??üº?º?×Ó?ÔÄ?Ç×µÄ?????ª?ªÄÂÄá?ûÄÉËØ?ò???ÆÍþ
ÌØ??
Ä?Ç×??ÊÇÎ?Ò?ÄÜÊ?ËÀÉñÇü?þµÄÁ?Á?--?ß?û?ù
ÊÀ?çÉϵÄÒ?ÇÐ?âÈÙºÍ???Á????À?×ÔÄ?Ç×???ª?ª?ß?û?ù
ÊÀ?çÉÏÓÐÒ?ÖÖ×îÃÀÀöµÄÉùÒô??ÄÇ?ãÊÇÄ?Ç׵ĺô?????ª?ªµ???
??Ö????? ×?Õß?º?ùÐÄ
ÎÒ?Ó???ÏÍýÆúÒ?ÕÅÖ??? ×ÜÊÇÁô×Å?ª?ªÁô×Å µþ?ÉÒ?Ö?Ö?ºÜÐ?µÄ???ù??
?ÓÖÛÉÏÅ×ÏÂÔÚº?Àï??ÓеÄ??Ìì?ç?µ?íµ?ÖÛÖеÄ??Àï??ÓеÄ??º?ÀË?òʪ??Õ?ÔÚ??Í?ÉÏ??
ÎÒÈÔÊÇ???ÒÐĵÄÃ?Ììµþ×Å?? ×ÜÏ?ÍûÓÐÒ?Ö?ÄÜÁ?µ?ÎÒÒªËüµ?µÄµØ??È???
Ä?Ç×??ÌÈÈôÄãÃÎÖÐ???ûÒ?Ö?ºÜÐ?µÄ?×???ù?? ??Òª?ªÑÈËüÎÞ?ËÈëÃÎ??
ÕâÊÇÄãÖÁ??µÄÅ??ùº?×ÅÀáµþµÄ?? ÍòË?Ç?É???ÇóËüÔØ×ÅËýµÄ?? ºÍ?????éÈ???
ÓÀºãµÄÂèÂè
µ?µÚÒ??ÎÕö?ª?õÉúµÄË?íø ×îÏÈ??µ?µÄÊÇÈËÄ?µÄÎÞ?ÈÊ??à
?È??µÄíûÊÓºÍÐÀÏ?µÄÀáÁ??ª?ª
ÑÛ??Ò?Õ???Õ???×ÐÏ?µÄ??×ÅÄã ÄãëüëÊÎÞÖªµÄÐÄ??ÄܵØÂÉ??
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
È?ÎÞ???íÊöÇ×ÇéÖ?Ò?ÕóËÄÖ?ÂÒÎè ??µÃÄã?ª?ªÈÌ??×??óÉùÌä?Þ
?,?ý?àÉÙ?öÈÕÈÕÒ?Ò?µÄ??Óý ÖÕÓÚ×øÖ?×ÓÄãÐ?Ð?µÄÉíÇû
ÔÚµ?ÕûÁËÇéÉ̺ÍÖÇÉÌÖ?ºó ?ö??µÈ?ý????Ö?º??öÁËÉúÃüÖÐ
×îÕä??µÄµÚÒ?Éù?ª?ªÂèÂè ÕâÊÇ×î?ÐÈ˵ÄÔ,Ê?ÔÌÐî
ÎÞÂÛÊÀ?çÉÏÁ?ÔÏ×Å?àÉÙÖÖÓïÑÔ Ö?ÓÐÕâÒ?Éùºôº??ø?ÔµÄÏàÍ?
Ã?ÓÐÊ?Ã?ÀÖÒô??Ã?ÓÐÊ?Ã?Ê??è ÄÜ?ÈÕâÒ?Éù?ü??ÈË
ÓÎ×ÓÒ?
ȺÉ???Ô?ËÍ×ßÏ?Ñô ?àÇéµÄË?ÊÖ??Ô?Ô?º??? Ï?ÍûÔÚÕÙ????
ÍâÃæµÄÊÀ?çÊÇÎÒµÄÌìÌÃ?? ×ÔÓɵÄÐÄÔÚ?ÉÏè??Ä?Ç×ÄãÇ??ÒÎÒÂð??
Ä?Ç×????µÄÍû×ÅÎÒ?? Ä?Ç×ÄãÏ?ÍûÎÒµÄÈËÉú?ü???ÊÂð??
Ä?Ç×ÐÀÎ?µÄ??×ÅÎÒ?? Ìý?ð?µÆøÉù??µÑÉù?,?, ?ô×Å?????ô?ôÎÕ×ÅÒ?Ë?ÊÖ??
Ä?Ç×µÄ??
ÎÒÃÇÒ???Ä?Ç×. ?ëÊÇ?ÓÀà ?ëÊÇ?Ô?Í
È?ºÍÄ?Ç×??ÎÒÃÇ??Ò?Ñù ÄÇÊÇ?º?ç×ß?ýµÄµØ??
ÎÒÃÇ??µÄÊÇϪÁ?
Ä?Ç×??µÄÊǺ?Ñó ÎÒÃǵÄ?ìÀÖ
ÊÇÄ?Ç×Á?ÉϵÄÎ?Ð?
Ü?Ü??ÝÉϵÄÂ?Öé ÎÒÃǵÄÍ??à
ÓÖÔ?ÓÐÁÁ ÊÇÄ?Ç×ÑÛÀïÉîÉîµÄÓÇÉË
ÄÇÊÇÌ?Ñô?øÓèµÄ?âÃ? ÎÒÃÇ?ÉÄÜ×ߵúÜÔ?ºÜÔ?
È?×ÜÒ?×ß???öÄ?Ç×ÐÄÁéµÄ?ã??
ËÄÔµÄÈÕ×Ó
É? ?É ÒÂ
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
Ø?ÔØç?ÅÛ?ìÉÐ?æ??Áì?óËäÆÆÈ?ÓàΠÖØ?ì??ÈÌÇáÒÆ?ð??ÉÏÓÐ?ÈÄ??ÉÏߺÛ??
×?Õß?º(Çå)ÖÜÊÙ?ýÄ?Ç×????
ÌìÉϵÄ?çÓêÀ?ÁË?? Äñ?ù?ãµ?ËûµÄ??Àï??
ÐÄÖеÄ?çÓêÀ?ÁË?? ÎÒÖ??ãµ?ÄãµÄ??Àï??
ÄúµÄÎ??ó Äý?áÁËÎÒµÄѪÈâ ÄúµÄÎ??ó ËÜÔìÁËÎÒµÄÁé?ê
ÄúµÄÒ?Éú ÊÇÒ??Î??µÄº?ÐÐ ÄúÓÃÓÅÃÀµÄÄêÂÖ
?à?ÉÒ??áÉ???ÓÍÄ?ÇåÏãµÄÈÕÀú ÄêÄê ÎÒ??ÔÚÄúµÄÉîÇéÀï?È?ý
ÔÚÄúµÄ?ç?òºÍÏ?Í?æÒÏ?
???þ??
ÄúÊÇÒ??Ã?óÊ? ?ºÌì ÒÐ×ÅÄú?ÃÏë ÏÄÌì ÒÐ×ÅÄú??ÈÙ
ÇïÌì ÒÐ×ÅÄú?ÉÊì . ??Ìì ÒÐ×ÅÄú?ÁË? ÄúÄÇ?ß?ó?í?ãµÄÊ??Ú ~
Ê?ËÄÒ?ÓÀ???ÄÒ? Ä?Ç× Äú?øÁËÎÒÉúÃü ÄúÊÇ??ÓýÎÒ?É??µÄÍÁµØ
??Èý??
ÔÚ??ÉËÊ? ÄúÊÇÎ??å ÔÚ?ÚÉ?Ê? ÄúÊÇÏ?Íû
ÔÚÈíÈõÊ? ÄúÊÇÁ?Á? ÔÚÄúÐ?Ð?º?ÍåÖÐ?ã?Ü?çÓê
ÄúΪÎÒ?ªÀ?ÁËÊÓÒ? ÄúÊÇÎÒÓÀÔ?µÄÖ?ÓÑ ÉúÃüµÄ??Á?
??ËÄ??
Äú??×Å??Á? ??É?µØ??ÉíÊØ?? Äú??ÇéÌ?Â?Ã?ÁÁµÄÐØ?ó
ÄúÍúÊ?µÄ??Á?Ð?ÈÝ?áÇ? Äú?ÐÌÚµÄѪҺ??Á???Ï?
??Îå??
ÈÃÎÒ?Á?þÔÚÄúµÄ??ÀÖÖÐ ÈÃÎÒÏíÊÜÔÚÄúµÄÎÂÜ?ÖÐ ÈÃÎÒÌÕ×íÔÚÄúµÄË??Û?ä ÈÃÎÒÙËÒÀÔÚÄúµÄ????Àï
??Áù??
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
ÓÆÓƵÄÔÆÀïÓе,µ,µÄÊ? µ,µ,µÄÊ?ÀïÓÐÃàÃàµÄ??
ÃàÃàµÄ??ÀïÓÐÉîÉîµÄÇé ÉîÉîµÄÇéÀïÓÐÅ?Å?µÄÒâ
??Æß??
Èç?ûÄ?Ç×ÊÇÓê ÄÇÎÒ?ÍÊÇÓêºóµÄºç
Èç?ûÄ?Ç×ÊÇÔ ÄÇÎÒ?ÍÊÇÅõÔµÄÐÇ
Ä?Ç×ÊÇÎÒÉú??µÄ?ù ÎÒÊÇÄ?Ç×ÀíÏëµÄ?û
???Ë??
ÎÒ???óÁË Ä?Ç׵ĺÚ??È?ËÆ?ãÒ?É쵀 º?˪ ÐÇÐǵãµãÉÁ×ÅÒø?â
ÎÒÉîÉîµØÎÇ×ÅÄÇÐ?ËêÔµĺÛ?? j)` ÅõÞäÎÒÒ??ÅÐÄÏ×?øÄú
???Å??
Ô???Ïã??ºñµÄÌðÃÛÝÓÈÆÄúµÄÉú?î Ô?ÎÒÒøÁå?ãµÄÐ?ÉùÓ?ÂúÄúµÄÃ??ä
Ô?ÎÒÈ???µÄ×???Èà?øÄúµÄÐÄÌï Ò?Æ?ÂÌÒ? ??º?Ëü?Ô?ùµÄÇéÒê
Ò?Ê×ËÌ?è Å?ËõÎÒ?ÔÄúµÄ???? "ÈÃÄúÐÄÖеÄ???äÊ??ªÈçÔÆ
ÈÃ?Ò???éÄú×ß?ýÓÆÓÆËêÔ È?×?Ñ?ÉúÃüµÄ?ÂÃØ È?Ì?Ë?ÊÀ?çµÄÉñÆæ
Ä?Ç×ÊÇÒ?×ù?ßÉ? ÔÌ?Ø×ÅÍòÎï ??ÓýÎÒÃÇ?É?? Ç?×?ÎÒÃǵÄÉíÐÄ
Ä?Ç×ÊÇÒ?Çú??È˵Ä?è ?ø×ÅÎÒÃÇÔÆÓÎËÄ?? ÓÃËýÄÇÓÅÃÀµÄÇúµ? ËÌÒ?×Å×æ?úµÄÀúÊ?
Ä?Ç×ÊÇÒ?ÂÆ?º?ç ?µÉú×ÅÊÀ?çÍòÎï Ó?Ó?µÄ??ÂÄ?ä ?øÀ?ÁË?ª?ªµÄÉú?ú
Ä?Ç×ÊÇË?Ë??ºÓê ×ÌÈó×Å?óµØÍòÎï ????Ä?Ç× ÎÒ??Äã??ÄãÊÇÎÒÐÄÖÐÓÀÔ?µÄÖ???
Ä?Ç×ÊÇÒ?ËÒ?ó?? ÔØ×ÅÎÒÃÇÊ?Ïò?óº??öÄ?Ç×
ÂèÂèµÄ??
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
ÎÄ/ ?ÅÄÏ
Àë?ªÂèÂèÉí?ß?ÀÁ?Éú?îÒÑ?,ÓÐÁùÄêÁË??ÕâÁùÄê???Ó?óÑ?Éú?îµ??Î?Ó??×????Ó????µ?ÄÏ
????µ????ÜÔõÑùÃ??ÎÓÐÀ?ÄÑ?òÊܵ??ìÕÛÊ??ã?áÏëÆðËý??ÏëÓëËýÁªÏµ??ÌýÌýËýÄÇÊìÏ?µÄ
ÉùÒô??Ïë?ÓËýÄÇÀïÕÒµ???Î???ÕÒµ?ÎÂÅ?ºÍÎÞ??µÄÁ?Á???
?ǵÃÎÒµÄÍ?Äê??ÊÇÔÚÂèÂèµÄ??ÐĺÇ??ÏÂ???ó??ËýΪÁËÈ?ÉíÐĵÄÕÕ?ËÎÒÃÇÐÖÃÃÈý?ö?ÅÆú
ÁË×Ô?ºµÄ??×????ºÌìµÄÓÜÇ??????ËÎçµÄôÕ×Ó??ÏÄÈÕÀïµÄÂÌ??ÌÀ????ÈÕÀïµÄ?ÊÊÂ??Ä?Ç×
ÎÞÎ???ÖÁµÄ?Ø??×ÜÊÇ?øÎÒÃÇ?øÀ?ÎÞ??µÄ?ìÀÖºÍÏ?ÔÃ?? ÂèÂèµÄÎÄ???Ì?È???ß??Ô,ÒòÖ?ÒªÊÇÓëËýµÄÍ?ÁäÈËÒ?ÑùÔâÊÜÁË??ÎÄ???ó?ïÃü??ÄÇ??ºÆ?Ù??
µ?ÂèÂè??ÊÇÍ??ýÅ?Á?ÈÏÊ?ÁËËùÓÐ???ûµÄºº×Ö??ÓÉÓÚËýËùÊܵÄ?ÌÓý?Ï??ÓÐÏÞ??ËùÒÔ?øÂè
ÂèµÄË?ÏëºÍÐÐΪ?øÀ?ÁË?ÖÏÞ??Ëý??Ï???ÎÒÓÐ×Ô?ºµÄË?Ïë??Ò?ÇÐ?ØÐë??ËýµÄ??ÅÅ?ì??Ìì
ÀäÊ?ËýÅÂÎÒÀä??ÌìÈÈÊ?ÓÖÅÂÎÒÈÈ??ÎÒ??Ê?ÈýËêÁËËýÅÂÓ?ÏìÎÒµÄÑ?Ï???ÈÃÎÒ×Ô?ºÏ?ÒÂ?þ??
×ÜÖ?ÔÚËýÐÄÖÐÎÒÊ?ÖÕÊÇÒ??ö??ÄÜ?ÀÁ?Éú?î??Ð?º???ËùÒÔËæ×ÅÎÒÄêÁäµÄÔö????ÎÒºÍÂèÂè
µÄ?ÖÆç?ÍÔ?À?Ô??ó??µ?ÁËÊ?ÎåÁùËê??ÎÒ??ºõ?ͺÜÉÙºÍËý??Á???ÈÏΪËýµÄÄÇÐ??ØÐÄÊ?ÖÕ
??ÊÇÎÞÐÝÖ?µÄßëß???Ã??Î??Ì?×ÜÊÇ?ñ?ñ??Èë??×îÖÕ×ÜÊÇÒÔÎÒµÄ?ÁÄ???ËýµÄÔðÂî?ø?æÖÕ??
×î?õÎÒ×ö?öÅÑÄæÂèÂè??µÄÊÂ??ÉúÔÚÎÒÉÏÎåÄê??µÄÊ?ºò???ǵÃÄÇÊÇÒ??öÏÂÑ?µÄ??ÌìµÄÖÐ
Îç??ÓÉÓÚÃ?ÓÐ??ËкÃ?ÎÎÄ?ø??ÀÏÊ?ÁôÁËÏÂÀ???ÀÏÊ?˵?º?????á?Í??Òª?Ø?Ò?Ô????ÓÉÓÚ
ÎÒµ?×ÓºÜÐ???Ê?ÖÕ???ÒÈ??øÀÏÊ???ËÐ??Ö?ºÃÑÛÕöÕöµÄ??×ÅÍ?Ñ?ÃÇ×ßÁËÒ??ó?ë??ÀÏÊ?Ò?
?Ø?ÒÈ??Ô??ÁË??µ?ÎÒÏÂÎç??Íêºó??Ö?Òª?ö×Å?Ç×ÓÉÏ?ÎÁË??Ä?Ç×ÔÚ??ÍâÒÑÕ?Á˺Ü?Ã??Ëý
?Ó??ÍâÏò?ÌÊÒÀïÒÑ??Á˺Ã???Î??µ?ÄÇÊ?ÐÂ??µÄ??Ìì????ÉÏÊÇÒ??ã˪??Í??ý????ÊÇÊ?Ã?
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
??????µ?µÄ??ÔÚ??µÃÒÔµÄÇé?öÏÂ??Ä?Ç×ÍÆÃÅÌ?×ÅÍ?????ÇеÄÎÊ?º??Ð?ÁúÔÚÂð???????ò?Ï
ÁËÀÏÊ?µÄ???κÍÍ?Ñ?ÃǵÄÌý?Î??È?ºóÏòÀÏÊ??òÁËÕкô???ÐÎÒ?öÀ???Ä?Ç×ÓÃËýµÄÍ??í?ü
×Å?øÎÒËÍÀ?Ò??ö?óÂøÍ?ºÍÒ?Æ?ÆûË???ËýÎÊÎÒΪÊ?Ã?ÖÐÎç???Ø?Ò???ö???ö??ÎÒÖ?ÊÇÒ??ö
??µÄ?ÐËý?ìµã?ØÈ???Ê?Ã?Ò?Ã??Ø?ð??ÎÒÃ?ÓÐÌýÍêËýµÄ??Öö?Í?ص?ÁË?ÌÊÒ???ص??ÌÊÒºó??
ÀÏÊ?µ?ÖÚÅúÆÀÁËÎÒµÄÄ?Ç×˵ËýÃ?ÀñÃ???ÏÂ?κóÍ?Ñ?ÃÇ?ÍÓÃÉÂÎ???È?Ð?ÎÒ??µ?Ê?ÎÒºÜ×Ô
????Ò?ºÜÔ?ºÞÄ?Ç×???ص??ÒÀï??Ô?ÆøÈ?????Ð??øÁËËý??µ?ÎÒ??ÀÏÊ?µÄ??ת?æ?øÄ?Ç×Ê???
Ä?Ç×µÄÁ?É????äÁË??Ê?Ã???Ã?˵??ÑÛº?×ÅÀá??ºÝºÜµÄ?òÁËÎÒÒ??ÍÕÆ????×ÅÂèÂèÉËÐĵÄ
ÑÛÀáÎÒºó?Ú??ÁË??µ?ÎÒ??Ã?ÓеÀÇ???×îºóÒ?Ö?ÒÔ?ÁÄ??æÖÕ??
µ?ÎÒ??ÉÏ?óÑ???Àë?ªÄ?Ç׺ó??×Ô?º?ªÊ??,ÀúÉú?î??????ÈË?äËöÊÂ??ÎÒÖð??µÄ??µÃÁËÂè
ÂèµÄ??ÊÇÊ?Ã???ÄÇÊÇ?ûÎÒµÄÐ?ÈÝ????×ÀÉϵÄÍÁ??Ë???Ï?Á?ÅèÖеÄÈÈË???ÎÒ?ÅÉÏ??µÄÃÞ
Ð?--
?ÍÊÇÕâÐ?ÆÕÆÕÍ?Í?µÄÐ?ÊÂ??Ò?×ö?ÍÊÇ??Ê?Äê??ÕýÊÇÕâÑùµÄÈÕ??ËöÊÂÈÃÃÀÀöµÄËý??
?öÁ˺Ü?àºÜ?à?,?,.
ÏÖÔÚ?ØÏëÆðÄÇÐ?????ʵÄÄêÔÂ??Ϊ×Ô?ºµÄÐÐΪ?ø?е??ÑÀ????ØÏëÆðÄ?Ç×Ã?Ñ??øÎÒËÍ????
?ø×Ô?º??Àí?âËý????Ôð??ËýµÄÍÁÆø??ÏÖÔÚÈç?ûÄÜ?ص?µ?Ê?ÎÒ?Ï???áÕ?ÆðÀ????ÔÄÇÎ?ÀÏ
Ê?˵?º??ÄÇÊÇÎÒµÄÂèÂè??Äú??ÄÜÕâÑù˵Ëý????ÂèÂèµÄ??Ö?ËùÒÔÄÇ?ÎÊ??ä??ÄÜÈÃÎÒ?ÓÊÜ??
ÊÇÒòΪËýµÄ×ö??ºÍ?í?ï??Ê?ÈÃÎÒÕâ?ö--
×ÔÈÏΪ?ÈÂèÂè??µÄ?àµÄɵº?×ÓÎÞ??ÂúÒâ?øÒÑ??
ÕâÁùÄêÀ?ÎÒ×î?ßÐ˵ÄÊÂÊÇ?Ø?Ò??Ëý??ÎÒÒ?Öð??Àí?âÁËËý?ÔÎÒµÄ????ÎÒÒ?Ò?Ö??ÑÀ?ÄÇ?Î
Ê??ä?ÔËýµÄÅÑÄæ??ÈÃËý?ÑÁËÐÄ??Ò?ÔøÏëÏòËý?ÔÄÇÊ?µÄ?íÏÖµ?Ç???µ?×ÜÊÇÏñ?ó?àÊýÖÐ?ú
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
ÈËÒ?Ñù??Ì??á?í?ï×Ô?º?ÐÇé??Ã??Î??µ?ËýµÄÐ?Á???ºÃÏñ?õµÃËûÒÑ??ÁËÎÒµÄÐÄ??
ÂèÂèµÄ??Ò?Ðí?ÍÊÇÄÇÑùµÄÆÕÍ???????ÏñµçÊÓÉÏËùÑݵÄÄÇÑùÌØ??µÄÈËÎïÌØ??µÄÊÂÀý??µ?
ËýÒ???ÊÇÎÂÅ?µÄ??Ëý?ÍÏñÌìÉϵÄÌ?Ñô??µØÉϵÄ?ÕÆøÎÞÊ????Ì?øÓèÎÒÃÇ??Ö?ÊÇËý?øÓèÎÒ
ÃÇÌ??à???øÊ?ÎÒÃÇ??ÄÜ??Ê??õ?ì??Ëý?ÍÏñ?ºÌìµÄÏ?ÓêÂþÂþµÄ×ÌÈó×ÅÎÒµÄÉíÐÄ??ÖµµÄÇì
ÐÒµÄÊÂ×öΪ?ù×ÓµÄÎÒÒÑ?,Àí?âËýµÄ??????Ïë?ÔËý˵?º??ÂèÂèÄãÓÀÔ?ÊÇÄÇÃ?Î??ó??ÎÒÓÀÔ?
??Äã????
(anther one)
ÓÐÒ?ÖÖ????Î??ó?øÆ?????ÈçÈóÎï?ºÓê??ËÆ??ÃæºÍ?ç??ÓÐÒ??ÝÇé??ÎÞË??ø???ó??ÃàÃà??
?Ï??ÇéÒêÉî????Õâ?ÍÊÇÄ?????ÓÀÔ???ÊÇ??Çó?Ø????ÎÞË?µÄ???ö??
ÔÚÐí?àÈË?ÇÒäµÄµîÌÃÀï??ÂèÂèÒ?Ö???ÊÇÄã×îÖÒʵµÄºó?Ü??Ã?Ò???µÄ?É??????ÔÚÂèÂè?È
??µÄÄ??âÖÐ???ó??Ã?Ò??εÄ?É??????ÔÚÂèÂèÐÀÎ?µÄÐ?ÈÝÖÐ?È?ý??
Ð?µÄÊ?ºò??Ò?????ÂèÂèÔÙ??ÎÒÒ??Î??µÄµçÓ???ÈÃ?àÉÙÈËÁ?ÏÂÁËÀáË???Ò?Ê×??ÊÀÉÏÖ?ÓÐ
ÂèÂèºÃ??µÄ?èÇú???ª?öÁË?àÉÙÈ˵ÄÐÄÉù??
Ä???ÊÇÊ×ÎÞÑÔµÄ?è??×Ü?áÔÚÄ??öÎçºó??Ä??ö?Æ?è??Ä??öºÚÒ???ÇáÇáÏìÆð??Ä???ÊÇ?ùµ,
µ,µÄ?,??×Ü?áÔÚÄ??öÄ?Éú?ÖÍ???Ä??öÄ?ÉúÐ?Õ???Ä??öÒìÏçÂõê??ÔÚÄã×îÊ?Òâ??×îÐèÒª
ÇóÖúµÄÊ?ºò??ÉÁÏÖÔÚÑÛÇ??,?,
º?×ÓÊ?ºòµÄÀáË?ÂäÂúÁËÄ?Ç×µÄÒÂ?ó?????ÎÑ?×ßÂ?µÄÊ?ºòÎÕ?ôÁËÄ?Ç×µÄË?ÊÖ??Ä?Ç×µÄÄê
ÂÖ???ÇÔØ×ÅÄãÈËÉúµÄ?ì????Ä?Ç×µÄËÄ????Ç??Ò×ÅÄãÔÚÍâµÄÀäÅ???
Ä???ÊÇÄÇ??Ê?ÖÕΪÄã?Å×ŵÄÉ?????ÓêÏ?À??ÅÍ?È???ÏÖÄ?Ç×µÄ?èÐÁ??Ä???ÊÇÄãÉíºó?á??
µÄÄ??â??ÝëÈ??ØÊ×?Å??µ?Ä?Ç×ÊØÍûµÄÉíÓ???
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
Ä?Ç×?øÁËÄãÉúÃü???øÁËÄãÉÆÁ????ü?øÁËÄãÒ??öÓÀÔ?µÄ?Ò???ص?Ä?Ç×Éí?ß??ÆðµÃÔÙÍí??
Ò??á??ÐÄΪÄã×???Ôç?Í??ÊÖ?ÅÔÙÀÁ??Ò??á?É?É??????ÕûÕûÆëÆëµÄÒÂÉÀ?ÅÔÚÕí?ß??
Ä???×îÕæ??×î????ËýµÄÒ?ÇÐ??ÔçÒÑÈÚÈëµ??ùÅ?µÄÒÂÊ?Æð?Ó??ÈÚÈëµ?ÈÕ??µÄµãµãµÎµÎ??
ÈÃÉúÃüãåÔ?×Å??µÄ?â?Ô???µ?É????Ä???×îÉî??×î?Á??ÎÞÂÛ?,Àú?àÉÙ?ç˪Ñ?Óê??ÎÞÂÛ?Ð
ÊÜ?àÉÙÎó?âÎ?Çü???Ô?ùÅ?µÄÖ????Ó???Ä?ä??
Ã?Ò??öÏ?ÇìµÄÈÕ×Ó?????áÓÐÄ?Ç×?ü?ÓÃ?µµÄÉíÓ???Ã?Ò?ÑùÆÕÍ?µÄ???Ë?????üº?×ÅÄ?Ç×
Ï?ÄåµÄÐÄË???
Ä????ò?òµ?µ???Æ?Æ????????ÓÀ?Ã?Ïë?ýÊ?Ã??Ø????È?ÈÃÉúÃüÔÚÈÊ??ÖÐÑÓÐø?????Ð??Ä?
???áÈÌ???Î??ÎÞÔ?ÎÞ?Ú??Ä?ÐÔµÄ?È???????á??Ô?ѪԵ????Ôì?öÒ??ö?öÆæ????ÓÐÎ??ñÆÆ
ÀõÄÄ?Ç׺Á??ÓÌÔ?µØ??×Ô?ºµÄÉö?è?øÁË??Äò??Ö??ù×Ó????ÓÐÒ?Î?Ä?Ç×ÊÕÑøÁËÒ??öÄÔÌ?
µÄº?×Ó?????öÊÓÈç?º?ö???øÇÒ??È?ÀíÒ?ÉúµÄ?ÏÑÔ??Ó?ÊÇÈÃÌúÊ??ªÁË????ÈõÍÄÜÈõÖǵÄ
º?×ÓÒ???ÈëÁË?ßµÈÑ????,?,
?ùÅ?µÄÄ??â×ÜÊÇÏò×Å×îÃÀµÄÔ?????Ä?Ç×µÄÄ??âÈ?×ÜÊÇÂäÔÚ?ùÅ?ÉíÉÏ???????áÍü?Ç×Ô?º??
Ä?Ç×ÒÑÏ??ßÁË?ùÅ?µÄÊèºö??ÄÇ?ÅÐÄÈ?×?Ëæ×Å?ùÅ?Æ?????????
?ùÅ?µÄÉúÈÕÏ?ºÃÈÃÄ?Ç×ÈçÊý?ÒÕä???ùÅ?µÄÒ?ƵÒ?Ð??üÊÇÄ?Ç×???ÁµÄÕä?Ø???É×?Ϊ?ùÅ???
Ë,ÓÖÄÜ˵ÇåÄ?Ç׵ĺÚ??ÔÚºÎÊ??ã?×ÁË??Ä?Ç×µÄÑü??ΪºÎÍäÏÂÁË?,?,
<Ä?Ç×?ø?öµÄ?ð??>
ÓÐ?öº?×Ó?ÔÒ??öÎÊÌâÒ?Ö?Ïë??Í???ΪÊ?Ã?ËûµÄÍ?×ÀÏë??µÚÒ???Ò?ÏÂ×Ó?Í??Á˵ÚÒ????ø
×Ô?ºÏë??µÚÒ?È??Å??Á˵Ú?þÊ?Ò?Ãû??
?Ø?ÒºóËûÎʵÀ?º??ÂèÂè??ÎÒÊÇ??ÊÇ?È?ðÈË????ÎÒ?õµÃÎÒºÍËûÒ?ÑùÌýÀÏÊ?µÄ????Ò?ÑùÈÏÕæ
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
µØ×ö×?Òµ???ÉÊÇ??ΪÊ?Ã?ÎÒ×Ü?ÈËûÂäºó????ÂèÂèÌýÁË?ù×ÓµÄ?????Ð?õµ??ù×Ó?ªÊ?ÓÐ×Ô×ð
ÐÄÁË???øÕâÖÖ×Ô×ðÐÄÕýÔÚ??Ñ?Ð?µÄÅÅÃûÉ˺?×Å??ËûÍû×Å?ù×Ó??Ã?ÓÐ?Ø?ð??ÒòΪËý??Öª
µÀÔõÑù?Ø?ð?? ÓÖÒ??Î??ÊÔºó??º?×Ó??Á˵ÚÊ?ÆßÃû???øËûµÄÍ?×À??ÊǵÚÒ?Ãû???Ø?Òºó???ù×ÓÓÖÎÊÁËÍ?
ÑùµÄÎÊÌâ??ËýÕæÏë˵??È˵ÄÖÇÁ?È?ʵÓÐÈýÁù?ŵÈ????µÚÒ?µÄÈË??ÄÔ×Ó?ÍÊÇ?ÈÒ??ãÈËÁé??
È??øÕâÑùµÄ?Ø?ð??ÄѵÀÊǺ?×ÓÕæÏëÖªµÀµÄ?ð??Âð??ËýÇìÐÒ×Ô?ºÃ?˵?ö?Ú??
Ó??ÃÔõÑù?Ø?ð?ù×ÓµÄÎÊÌâÄØ??ÓÐ???Î??ËýÕæÏëÖØ??ÄÇ???ä??ÉÏÍò?ö??Ä?ÖØ??ÁËÉÏÍò?Î
µÄ???ª?ªÄãÌ?Ì?ÍæÁË??ÄãÔÚÑ?Ï?ÉÏ??????ÇÚ?Ü??ºÍ?ðÈË?ÈÆðÀ????????,?,ÒÔ?ËÌÂÈû?ù
×Ó??È??ø??ÏñËý?ù×ÓÕâÑù?????ÏÃ???ÔÚ?àÉÏ?É??????Í??öµÄº?×Ó??Æ?Ê??îµÃ??????ÐÁ
?àÂð??ËùÒÔËýÃ?ÓÐÕâÃ?×ö??ËýÏëΪ?ù×ÓµÄÎÊÌâÕÒµ?Ò??öÍêÃÀµÄ?ð????
?ù×ÓÐ?Ñ??ÏÒµÁË??ËäÈ?Ëû?È?ýÈ??ü?Ó?Ì?à??µ?ÒÀÈ?Ã??ÏÉÏËûµÄÍ?×À?????ý??Óë?ýÈ?Ïà
?È??ËûµÄ?É??Ò?Ö?ÔÚÌá?ß??ΪÁË?Ô?ù×ÓµÄ?ø???íÊ?ÔÞÉÍ??Ëý?øËûÈ???ÁËÒ??Î?óº????Í
ÊÇÔÚÕâ?ÎÂÃÐÐÖÐ??ÕâÎ?Ä?Ç×?Ø?ðÁË?ù×ÓµÄÎÊÌâ??
ÏÖÔÚÕâÎ?×ö?ù×ÓµÄÔÚÒ????ص?ÐÄ×Ô?ºµÄÃû?ÎÁË??Ò?ÔÙÃ?ÓÐÈË×?ÎÊËûÐ?Ñ?Ê??É??ÅŵÚ??
Ãû??ÒòΪÈ?ÄêËûÒÑ?,ÒÔÈ?Ð?µÚÒ?ÃûµÄ?É????ÈëÁËÇå?ª??º??Ù?éÀ?Ê???Ä?Ð?ÇëËû?øÍ?Ñ?
???Ò??×öÒ??ö???æ??ÆäÖÐËû??ÁËÐ?Ê?ºîµÄÒ??Î?,Àú?º
??ÎÒºÍÄ?Ç××øÔÚÉ?Ì?ÉÏ??ËýÖ?×ÅÇ?Ãæ?ÔÎÒ˵??Äã??ÄÇÐ?º??ßÕùÊ?µÄÄñ?ù??µ?º?ÀË?òÀ?µÄ
Ê?ºò??Ð??ÒÈ?×ÜÄÜÑ?ËÙÆð?É??ËüÃÇÅÄ?òÁ?ÈýÏÂ?á?ò?ÍÉýÈëÁËÌì?Õ???øº?Å?×ÜÏÔµÃ?Ç??
??×?ËüÃÇ?ÓÌì?Õ?ÉÈëº?Ì?×ÜÒªºÜ??µÄÊ??ä??È??ø??ÕæÕýÄÜ?ÉÔ??óº?ºá?ý?óÑùµÄ??ÊÇËü
ÃÇ????Õâ?ö???æÊ?ºÜ?àÄ?Ç×Á?ÏÂÁËÑÛÀá??ÆäÖÐ?üÀ?Ëû×Ô?ºµÄÄ?Ç×??
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
<Ã?ÓÐÉÏËøµÄÃÅ > ÏçÏÂÐ??å×?µÄÆ?Æ?Ð?ÎÝÀï×?ÖøÒ??ÔÄ?Å?
,Ä?Ç×ÉîÅÂÔâÇÔ×ÜÊÇÒ?µ?ÍíÉÏ?ãÔÚÃÅ?ÑÉÏÁ?Ëø
ÈýµÀËø;Å??ùÔòÑá?ñÁËÏñ?ç???,?ã?ÝÔï?øÒ??É???äµÄÏç?åÉú?î,ËýÏòÍù??ÊÐ,ÏëÈ?????×Ô
?ºÍ??ýÊÕÒô?úËùÏëÏóµÄÄÇ?ö?ªÀöÊÀ?ç.Ä?ÌìÇå??,Å??ùΪÁË×?ÇóÄÇÐé?õÄÃÎÀë?ªÁËÄ?Ç×
Éí?ß.Ëý?ÃÄ?Ç×Ë??õÊ?͵͵Àë?Ò?ö×ßÁË.
??Âè,Äã?͵?×?Ã?ÎÒÕâ?öÅ??ù?É.???ÉÏ?ÕâÊÀ?ç??ÈçËýÏëÏóµÄÃÀÀö??ÈË,ËýÔÚ??Öª???õÖÐ,
×ßÏò?éÂäÖ?Í?,ÉîÏÝÎÞ??×Ô?εÄÄàÅ?ÖÐ,ÕâÊ?Ëý?ÅÁìÎòµ?×Ô?ºµÄ?ý?í.
??Âè!??
?,?ýÊ?Äêºó,ÒÑ?,???ó?ÉÈ˵ÄÅ??ùÍÏÖøÊÜÉ˵ÄÐÄÓëÀÇ??µÄÉíÇû,?ص?ÁË?ÊÏç.
Ëý?ص??ÒÊ?ÒÑÊÇÉîÒ?,Î?ÈõµÄµÆ?âÍ??ýÃÅ?ìÉøÍ??öÀ?.ËýÇáÇáÇÃÁËÇÃÃÅ,È?Í?È?ÓÐÖÖ??Ïé
µÄÔ??Ð.Å??ùÅ??ªÃÅÊ??ÑËýÏÅÁËÒ?Ìø.??ºÃÆæ?Ö,Ä?Ç×Ö?Ç??ÓÀ???ÔøÍü?Ç?ÑÃÅËøÉϵÄ.?? Ä?
Ç×ÊÝÈõµÄÉíÇûòéÇúÔÚ?ùÀäµÄµØ?å,ÒÔÁîÈËÐÄÌÛµÄÄ?ÑùË?ÖøÁË.
??Âè?,?,Âè?,?,??Ìýµ?Å??ùµÄ?ÞÆüÉù,Ä?Ç×Õö?ªÁËÑÛ??,Ò?Óï????µØÂ?×?Å??ùÆ???µÄ?ç
?ò.ÔÚÄ?Ç×??Àï?ÞÁ˺Ü?ÃÖ?ºó,Å??ùÍ?È?ºÃÆæÎʵÀ:??Âè,?ñÌìÄãÔõÃ?Ã?ÓÐËøÃÅ, ÓÐÈË???ø
À?ÔõÃ??ì???
Ä?Ç×?Ø?ð˵:????Ö?ÊÇ?ñÌì?øÒÑ,ÎÒÅÂÄãÍíÉÏÍ?È??ØÀ??ø??ÁË?ÒÃÅ,ËùÒÔÊ?ÄêÀ?ÃÅ?ÓÃ?Ëø
?ý.??
Ä?Ç×Ê?ÄêÈçÒ?ÈÕ,µÈ?ýÖøÅ??ù?ØÀ?,Å??ù???äÀïµÄ?ÚÉèÒ?Èçµ?Äê.ÕâÌìÍíÉÏ,Ä?Å?
?Ø??µ?Ê?ÄêÇ?µÄÑù×Ó,?ô?ôËøÉÏ??ÃÅË?ÖøÁË
<Ä???ÈçÖà>
ÓÐÕâÑùÒ?Î?Ä?Ç×??ËýÃ?Ìì??ºÍËýµÄ?ù×ÓÁÄÌì??Ëý?øËû??Ò?Ð?ËûÐ?Ê?ºîµÄ?ÊÊÂ?º?â×ÅÆ?
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
?ÉÔÚÐ?ºÓÀïÓÎÓ???Ϻ?ÌÉËÁËÆ??É?à×Å?ÅÑ??Úµ?Ê?ÉÏ?ÔÉ?ÝØ??Ã?Ã??æÒ?µÃ?ëÉí?í?ñ??ÁÖ
ÁÖ×Ü×Ü??Ëû??ÒÑ?,ÍüÁ˵ÄÊÂÇé??Ëý×ÜÊÇ?ÇÒäÓÌÐÄ??ÈçÊý?ÒÕä??
ËýÃ?Ìì×ÜÊÇ?áÀûÓÃÒ??ó???ÖÊ??äÀ??øËû??Öà??ÓÃÄÇÖÖ×î??×î?ó???ÅÁ???Âú??ÖʵØ??Ó???
ÂÔ?øÐ??äÇàÉ?µÄÃ×Á???Ò??ÅÒ??Å??ÐÄÌôÑ???Èç?ûÅ??ûÒ???Ð?ÐÄÊÖÖ?Õ?ÆðÁËÁ??Å??Ëý?á
??ËüÃÇÖØÐÂ?Å?øÃ×?Ñ??ÖØÐÂÌôÑ???Ëý?ÑÄÇÐ?Ã×ÃÇÏ?µÃ???â?øÓÐ?à????È?ºó?Å?øÒ?Ö?×Ø
É?Íß?Þ??µ?ÉÏ?Áµí?ýµÄȪË???ÓÃ?ñ?ðÂýÂý?????ð??ÄÜÌ?ÃÍ???ñÔòÖà?áÊÜÈÈ???ùÔÈ??Ëý
?Ñ?ð?ùÊ̺îµÃÎÂË??ø??ÖÂ??ÍðÈôÒ?Î?Ìñ??æµÑŵÄ?,ÄÏÅ?×Ó??
??Ò??ÞÖà??Í???Òª???ÑÁ??ö?ëÐ?Ê???ËýÐ?ÐÄÒíÒíµØ?ÑÖàµ??øÒ?Ö????ÉÍë??Ò??ß?Î×ÅÄÔ
?ü??Ò??ß?Ô×ÅÖà?µÆø???µµ?×Ô?ººôÎüÀ?ÄÑ??ÖàÒ??äÁ?ÁË??ËýÎ?Ð?×ÅÓÃÌÀ?×Î??ø?ù×Ó?Ô??
?ÉÊÇ?ù×Ó?Õ×ÅÑÛ????Ä?È?µØ?Ü?øÁËËý??Ëý????ÉúÆø??Î?Ð?ÈçÎô??
µÚ?þÌì???ÌÐø?ðÃ×????Öà???µÀä????ÇÒ?ÓÊÜ?Ü?ø??ÈÕ??Ò?ÈÕ??Äê??Ò?Äê??ËýµÄÊÖÖ?ÒÑ
?,?äµÃ?Ö?Ú?øÓÖ?Ù?Û??ËýÒ??εÄÄÔ?üÒÑ?,?×???ÔÉú??ËýµÄÁ?ÆøÒ??ó??Èç?ÓÇ?ÍùÍùÊÇÖà
Àäµ?Ò??ëÊ??ãÒÑ?,ÉÏÆø???ÓÏÂÆø???ØÐë?èÖúÉÈ×ÓÀ?Íê?ÉÏÂÒ??ëµÄ?µÎÂ???ÉÊÇ?ù×ÓÒÀÈ?
ÀäÄ?×Å?Ü?øËý??ËýÒ?Ö?Î?Ð?×Å??Ê?ÖÕÃ?ÓÐÁ?ÏÂÒ?µÎÑÛÀá??
ÕâÖÖÈÈÇéÓëÀäÄ?µÄ?ÔÖÅ?ÖÐøÁË?ËÄêÁãÆßÊ?ÈýÌì??µÚ?ËÄêÁãÆßÊ?ËÄÌì??ËýÕýºÍËû?ù×Ó??
×ÅËûÐ?Ê?ºîµÄ?ÊÊÂ???ù×ÓÍ?È?Õö?ªÑÛ???????óÇåÎúµÄ˵ÁËÉù?º??ÂèÂè??ÎÒÒªºÍÖà????Ëý
?ÙÊ?ÀáÈçÓêÏÂ?ª?ªÄÇÊÇËû×Ô?ÓÒ?ÉúÐû??ÄÔËÀÍöºó?ª?Ú˵µÄµÚÒ??ä????Ò?Éú˵??ÏñËûÕâ
ÑùµÄÇé?ö??Ö?ÓÐÊ?Íò?ÖÖ?Ò?µÄ?ú?á??
?ù×ÓÄÇÌì?Ôµ?ÁËÄ?Ç×??µÄÖà??ÖàÆäʵ????ÏñËýÃèÊöµÄÄÇÑùºÃ?Ô??ÓÐÎ?Î?µÄºýÎ????øÇÒ
???øÓÐÏÌÏ̵ÄÑÛÀáÎ?µÀ???ÉÏë?øÖª??Ä?Ç×ÊÇ?àÃ???Æ?????
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
?Êʵ?ÕâÀï??Ã?ÓÐ?áÊø??Èý?öÔÂÖ?ºó???ÍÔÚ?ù×ÓÍêÈ??ÉÒÔÉú?î×ÔÀíÖ?Ê???Ä?Ç×ÈöÊÖÈË
?ä??ÁÙ×ßÊ???ÎÕ×Å?ù×ÓµÄÊÖ??Ð?ÈÝ??Ïê?ø?ÓÈÝ???ù×ÓÔÚÇåÀíÒÅÎïµÄÊ?ºò????ÏÖÁËÒ???
Ä?Ç×µÄ??Àú??ÆäʵÔçÔÚÆßÄê?àÒÔÇ???ÔÚ?ù×Ó?èË?ºóµÄÒ?Äê?àÖ?ºó????ÐÒÓÖÒ??Î?µÁÙÁË
Õâ?ö?ÒÍ??ª?ªÄ?Ç×??È?ÕïΪ?Î??ÍíÆÚ??
ÊÇÊ?Ã?ÐÅÄî?ÉÒÔÖ??ÅÒ?Î??Î??ÍíÆÚÍíÆÚµÄÅ?ÈËÓë??Ä??Ô??ÁËÆßÄê??Ò?Éú˵ÕâÊÇ?öÆæ
?????ù×ÓÖªµÀ????ÔìÆæ??µÄÕýÊÇ?ª?ªÄÇ?ÉÁ??ø×ð?ó??Æ???È?Î??óµÄÄ?Ç×?? ÎÒµÄÄ?Ç×??ÀÏÉá
Ä?Ç×µÄÄï?ÒÊÇÔÚ??Æ?µÂÊ?ÃÅÍâ??ÍÁ?Ç?ùÍâ?ß??Í??óÖÓ˵Ä?óÂ?ÉϵÄÒ??öÐ??åÀï??
?åÀïÒ???ÓÐËÄÎå?ÒÈË?Ò????ÐÕÂí???ó?Ò??ÖÖµã??Ê??Ö?ÊÃÀµÄÍÁµØ??µ?ÊÇÓëÎÒÍ???µÄÐÖ
µÜÃÇ??Ò?Óе??øµÄ??×?Ä???µÄ??×?ÄàË???µÄ??ºÍµ?Ñ??ìµÄ??ËûÃÇËäÈ?ÊÇÅ??Ò??È?Ñø??
ÆðÅ?Âí??ÈËÊÖ????µÄÊ?ºò????Å??ãÒ?ÐëϵØ×??î??
?ÔÓÚÀÑÀÑ?Ò??ÎÒÖ?ÖªµÀÉÏÊöµÄÒ?µã??Íâ??ÍâÆÅÊÇÊ?Ã?Ñù×Ó??ÎÒ?Í??ÖªµÀÁË??ÒòΪËûÃÇ
ÔçÒÑÈ?ÊÀ??ÖÁÓÚ?üÔ?µÄ×åϵÓë?ÒÊ????Í?ü??ÏþµÃÁË??ÇîÈËÖ?ÄÜ?ËÑÛÇ?µÄÒÂÊ???Ã?ÓÐ??
?òÌ?ÂÛÊ?Ã??ýÈ?µÄ?âÈÙ?????ÒÆ×??Õâ×ÖÑÛ??ÎÒÔÚÓ×Äê?Í?ù??Ã?ÓÐÌý˵?ý??
Ä?Ç×ÉúÔÚÅ??Ò??ËùÒÔÇÚ?ó?Ïʵ??ÉíÌåÒ?ºÃ??ÕâÒ?µãÊÂʵÈ???ÖØÒª??ÒòΪ?ÙÈôÎÒÃ?ÓÐÕâ
ÑùµÄÒ?Î?Ä?Ç×??ÎÒÖ?ΪÎÒ?ÖÅÂÒ??ÍÒª?ó?óµÄ?ò?öÕÛ?ÛÁË??
Ä?Ç×?ö?Þ?ó?ÅÊǺÜÔç??ÒòΪÎÒµÄ?ó?ãÏÖÔÚÒÑÊÇÁùÊ??àËêµÄÀÏÌ?ÆÅ???øÎÒµÄ?óÉûÅ?????
ÎÒÒ?Ëê????ÎÒÓÐÈý?ö?ç?ç??ËÄ?ö?ã?ã??µ?ÄÜ???ó?ÉÈ˵Ä??Ö?ÓÐ?ó?ã???þ?ã??Èý?çÓëÎÒ??
ÎÒÊÇ??ÀÏ???ù×Ó??ÉúÎÒµÄÊ?ºò??Ä?Ç×ÒÑËÄÊ?Ò?Ëê???ó?ã?þ?ãÒÑ???öÁË?ó??
ÓÉ?ó?ãÓë?þ?ãËù?ÞÈëµÄ?ÒÍ?À?ÍÆ?Ï??ÔÚÎÒÉúÏÂÖ?Ç???ÎÒµÄ?ÒÀï???ó?Å??ÂíÂí????µÄ?ý
µÃÈ???ÄÇÊ?ºò???é????Ãŵ????Ô???ø?ó?ãÕÉÊÇ×?Ð??ÙµÄ???þ?ãÕÉÒ??ª?ýÒ??ä?Æ?Ý??Ëû
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
ÃÇ??ÊÇÏàµ?ÌåÃæµÄÈË??
?ÉÊÇ??ÎÒ??ÎÒ?ø?ÒÍ??øÀ?ÁË??ÐÒ?ºÎÒÉúÏÂÀ???Ä?Ç×ÔÎ?ýÈ??ëÒ????ÅÕöÑÛ???ûËýµÄÀÏ?ù
×Ó?ª?ª?ÐÐ??ó?ã???ÑÎÒ??ÔÚ??Àï??ÖÂÎ???ËÀ??
Ò?Ëê?ë??ÎÒ?Ñ??Ç×???Ë??ËÀÁË??ÐÖ??µ?Ê?Ëê??Èý?ãÊ??þÈýËê??ÎÒ?ÅÒ?Ëê?ë??È?ÕÌÄ?Ç×?À
Á???ÑøÁË????Ç×µÄ?Ñ?ã?úÎÒÃÇÒ??é?ù×???ËýÎüÑ?Æ???ËýÏ?ÃþÖ?ÅÆ??ËýµÄÆ?Æø???µ??Ϊ
ÎÒÃǵÄÒÂÊ???Ä?Ç×Òª?øÈË?ÒÏ?ÒÂ?þ???ì???ò?Ã?ìÒÂÉÑ??ÔÚÎÒµÄ?ÇÒäÖÐ??ËýµÄÊÖÖÕÄêÊÇ
ÏʺìÎ?Ö×µÄ???×Ìì??ËýÏ?ÒÂ?þ??Ï?Ò?Á??óÂÌÍßÅè??Ëý×?ÊÂÓÀÔ?Ë?ºÁÒ????óÑÜ???ÍÊÇÍÀ
??ÃÇËÍÀ?µÄºÚÈçÌúµÄ??Íà??ËýÒ??øÏ?µÃÑ??×??Íí?ä??ËýÓëÈý?ã??×ÅÒ?ÕµÓ͵Æ????Òª?ì
??ÒÂ?þ??Ò?Ö?µ??ëÒ???ËýÖÕÄêÃ?ÓÐÐÝÏ????ÉÊÇÔÚÃ?µÖÐËý???ÑÔº×ÓÎÝÖÐÊÕÊ?µÃÇåÇåË?
Ë???×ÀÒÎ??ÊÇ?ɵÄ???ñÃŵÄÍ,?î?ÃÒÑ?ÐÈ???È????ÉÊÇËýµÄÊÖÀÏÊ?ÆÆ×ÀÃæÉÏÃ?ÓÐ??ÍÁ??
?ÐÆƵÄÍ,?î??×Å?â??ÔºÖÐ????Ç×ÒÅÁôϵÄ??ÅèÊ?ÁñÓë?ÐÖñÌÒ??ÓÀÔ??áµÃµ?Ó?ÓеÄ???à
Óë??????ÄêÄêÏÄÌì?ªÐí?à????
?ç?çËƺõÃ?ÓÐÍ?ÎÒÍæË??ý??ÓÐÊ?ºò??ËûÈ??ÁÊé??ÓÐÊ?ºò??ËûÈ?Ñ?Í???ÓÐÊ?ºò??ËûÒ?È?
Âô??Éú?òÓ?ÌÒÖ?ÀàµÄÐ???Î???Ä?Ç׺?×ÅÀá?ÑËûËÍ×ß????µ?Á?Ìì??ÓÖº?×ÅÀá?ÓËû?ØÀ???
ÎÒ??Ã??×Õâ??ÊÇÊ?Ã?ÊÂ???øÖ??õµÃÓëËûºÜÉúÊè??ÓëÄ?Ç×ÏàÒÀÈçÃüµÄÊÇÎÒÓëÈý?ã??Òò?Ë??
ËýÃÇ×?ÊÂ??ÎÒÀÏÔÚºóÃæ?ú×Å??ËýÃÇ??????ÎÒÒ?ÕÅÂÞ×ÅÈ?Ë???ËýÃÇÉ?µØ??ÎÒ?Í?éÍÁ?,?,
?ÓÕâÀï??ÎÒÑ?µÃÁË????????Çå?à??ÊØÖÈÐò??ÕâÐ?Ï??ßÖÁ?ñ????ÎÒ???æ×Å??
ÓÐ?ÍÈËÀ???ÎÞÂÛÊÖÖÐÔõÃ?????Ä?Ç×Ò?ÒªÉè??ŪÒ?µã??Î?È??î?ý???Ë??Óë?í?çÃÇÍùÍùÊÇ
×Ô?ºÌÍÇ?Âò?ÆÈâÊ???ÕâÊ?ËýÁ?ÉÏÐßµÃ?ɺì???ÉÊÇ??ÒóÇÚµÄ?øËûÃÇÎÂ?Æ×?Ãæ??ÓÖ?øËýÒ?
Ð?Ï?ÔÃ??ÓöÉÏÇ×ÓÑ?ÒÖÐÓÐÏ?É?ÊÂ??Ä?Ç×?Ø?Ñ?ó?ÓÏ?µÃ?É?É??????Ç××ÔÈ?ºØµõ?ª?ª?ÝÀñ
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
Ò?ÐíÖ?ÊÇÁ?µõÐ?Ç???µ?Èç?ñΪÎҵĺÃ?͵ÄÏ?ÐÔ????Î?È??Ä?????ÜÉú?îÊÇÕâÃ?Çå?à??Òò
Ϊ×ÔÓ×?ù???ßÁ˵ÄÊÂÇéÊÇ??Ò×?ĵôµÄ??
?ÃÄ?Ê???ÄÖÆ?Æø??Ëýµ?ÔÚ??µ?ÀïÕÒ?ÇÍ???ËýÊÇÎÒ?ÒÖеÄÑÖÍõ??Ö?µ?ÎÒÈëÖÐÑ???Ëý?ÅËÀ
È???ÎÒ?ÉÊÇÃ?ÓÐ???ûÄ?Ç×?????ý????Ã?ÊÜ?ýÆÅÆŵÄÆø??????ÊÜ?ó?Ã×ÓµÄÂð?Ãüµ?Èç?Ë!??
Ä?Ç×ÔÚ?Ç?âÊÍÒ?ÏÂ??×ãÒÔÆ??þ?ðÈ˵ÄÊ?ºò???ÅÕâÑù˵??ÊǵÄ??Ãüµ?Èç?Ë??Ä?Ç×?îµ?ÀÏ??
Çîµ?ÀÏ??ÐÁ?àµ?ÀÏ??È?ÊÇÃüµ?Èç?Ë??Ëý×î?á?Ô?????øÇ×ÓÑÁÚ?Ó?ïÃ???Ëý×ÜÅÜÔÚÇ?Ãæ?º
Ëý?á?øÓ??ùÏ?Èý?ª?ªÇîÅóÓÑÃÇ?ÉÒÔÒò?ËÉÙ??Ò??Ê??ÇëÀÑÀÑ??Ç??ª?ªËý?á?Îðð??Ëý?á?øº?
×ÓÃÇÌêÍ???Ëý?á?øÉÙ??ÃÇ?ÊÁ??,?,??ÊÇËýÄÜ×öµÄ????ÓÐÇó?ØÓ???µ?ÊÇ????×ì?ò?Ü??ÓÀ
Ô?Ã?ÓÐËý??ËýÄþ?Ô???????ºÆø??µ??ÃÄ?ËÀÈ?µÄÊ?ºò??Ä?Ç×Ëƺõ?ÑÒ?ÊÀµÄÎ?Çü???ÞÁË?ö
À???Ò?Ö??Þµ??صØ????ÖªµÀÄÄÀïÀ?µÄÒ?Î?Ö?×Ó??Éù?ÆÓÐ?Ð?ÌÈ???Ä?Ç×?ãÒ?Éù??Ïì???Ì
Ëû?á×ßÄÇÐ?ÆÆ×ÀÀÃ?åµÊ???øÇÒ?Ñ?ÃÄ?ÑøµÄÒ?Ö??ÊÈâ??Ò?ËÍ?øËû??
?ÉÊÇ??Ä?Ç×????ÈíÈõ????Ç×ËÀÔÚ?ý×ÓÄÖ??È,??µÄÄÇÒ?Äê??Áª?üÈë?Ç?????ÒËÑË??ÆÎï??Ñ???
ÎÒÃÇ??ËÑÁ??Î??Ä?Ç×À,×Å?ç?çÓëÈý?ã×øÔÚÇ??ù??µÈ×Å???í×Ó???øÃÅ???ÖÃÅÊÇ?ª×ŵÄ?????í
×Ó???øÃÅ??Ò??̵?ÏÈ?ÑÀÏ?Æ???ÌËÀ???øºóÈëÊÒËÑË???ËûÃÇ×ߺó??Ä?Ç×?ÑÆÆÒÂÏä?áÆð???Å
??ÏÖÁËÎÒ???ÙÈôÏä×Ó???Õ??ÎÒÔç?Í??Ñ?ËÀÁË???ÊÉÏÅÜÁË??ÕÉ?òËÀÁË???í×ÓÀ?ÁË??Âú?Ç
ÊÇѪ?â?ðÑæ???ÉÊÇÄ?Ç×??ÅÂ??ËýÒªÔÚ?̵?ÏÂ?????ÄÖÐ??????×Å?ùÅ?????Æ?ÓÐ?àÉÙ?äÂÒ
????ÓÐÊ?ºò?ø?äÁË???ÖÊÐÕûÌõµÄÉÕÆð???ðÍÅÂäÔÚÎÒÃÇÔºÖÐ??ÓÐÊ?ºòÄÚÕ?ÁË???ÇÃÅ?ô?Õ??
Æ̵ê?ØÃÅ??ÖçÒ?Ïì×ÅÇ?ÅÚ??Õâ?ª?Ö??Õâ?ôÕÅ??ÔÙ?ÓÉÏÒ??ÒÒûÊ?µÄ?ï?????ùÅ???È?µÄ?Ë
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
ÂÇ??ÆñÊÇÒ??öÈíÈõµÄÀÏ?Ñ??ËùÄÜÊܵÃÆðµÄ??ÉÊÇ??ÔÚÕâÖÖÊ?ºò??Ä?Ç×µÄÐĺáÆðÀ???Ëý
???Å???Þ??Òª?ÓÎÞ?ì??ÖÐÏë?ö?ì??À???ËýµÄÀá?áÍùÐÄÖÐÂä!ÕâµãÈí?øÓ?µÄÐÔ?ñ??Ò????ø
ÁËÎÒ??ÎÒ?ÔÒ?ÇÐÈËÓëÊÂ????È?ºÍÆ?µÄÌ??È???Ñ?Ô??µ?×?µ?È?µÄ??µ?ÊÇ??ÔÚ×?ÈËÉÏ??ÎÒ
ÓÐÒ???µÄ×ÚÖ?Óë?ù??µÄ??Ôò??Ê?Ã?ÊÂ???É???Í???ø??ÄÜ???ý×Ô?º?,ºÃµÄ?çÏÞ??ÎÒÅÂ?û
ÉúÈË??ÅÂ?ìÔÓÊÂ??ÅÂ?öÍ?Â?Ãæ??µ?Êǵ?ÁË?ÇÎÒÈ????ɵÄÊ?ºò??ÎÒ?ã???Ò??È???ÕýÏñÎÒ
µÄÄ?Ç×???ÓË?ÛÓµ?Ð?Ñ???µ?ÖÐÑ???ÎÒ?,Àú?ýÆðÂëÓÐ?þÊ?Î??ÌÊ??É??ÆäÖÐÓÐ?øÎÒºÜ?óÓ?
ÏìµÄ??Ò?ÓкÁÎÞÓ?ÏìµÄ??µ?ÊÇÎÒµÄÕæÕýµÄ?ÌÊ????ÑÐÔ?ñ???øÎÒµÄ??ÊÇÎÒµÄÄ?Ç×??Ä?Ç×
????Ê?×Ö??Ëý?øÎÒµÄÊÇÉúÃüµÄ?ÌÓý??
µ?ÎÒÔÚÐ?Ñ??ÏÁËÒµµÄÊ?ºò??Ç×ÓÑÒ?ÖµÄÔ?ÒâÎÒÈ?Ñ?ÊÖÒÕ??ºÃ?ïÖúÄ?Ç×??ÎÒÏþµÃÎÒÓ?µ?
È?ÕÒ???Ô??ÒÔ?õÇáÄ?Ç×µÄÇÚÀÍÀ??à???ÉÊÇ??ÎÒÒ?Ô?ÒâÉýÑ???ÎÒ͵͵µÄ??ÈëÁËÊ???Ñ?Ð?
?ª?ªÖÆ?þ????Ê???Êé????ËÞ??????ÓÉÑ?Ð????ø??Ö?ÓÐÕâÑù??ÎÒ?Å?Ò?ÔÄ?Ç×˵ÉýÑ?µÄ????
ÈëÑ???Òª??Ê?ÔªµÄ??Ö??ð??ÕâÊÇÒ??Ê?Þ?î!Ä?Ç××?ÁË?ë?öÔµÄÄÑ???ÑÕâ?Þ?î?ïµ????øºó
º?Àá?ÑÎÒËÍ?öÃÅÈ???Ëý???ÇÀÍ?à??Ö?Òª?ù×ÓÓÐ?öÏ???µ?ÎÒÓÉÊ????ÏÒµ???ø??ÅÉΪÐ?Ñ?
Ð?Ð?????Ä?Ç×ÓëÎÒ??Ò?Ò???ÔøºÏÑÛ??ÎÒÖ?˵ÁË?ä?º??ÒÔºó??Äú?ÉÒÔЪÒ?ЪÁË!??ËýµÄ?Ø?ð
Ö?ÓÐÒ?????µÄÑÛÀá??ÎÒÈëÑ?Ö?ºó??Èý?ã?áÁË?é??Ä?Ç×?Ô?ùÅ???ÊÇÒ?ÑùÌÛ??µÄ??µ?ÊÇ?Ù
ÈôËýÒ?ÓеãÆ???µÄ????ËýÓ?µ?Æ???Èý?ã??ÒòΪ×Ô??Ç×ËÀºó???ÒÖÐÒ?ÇеÄÊÂÇé??ÊÇÄ?Ç×
ºÍÈý?ã??Í??Å?ÖµÄ??Èý?ãÊÇÄ?Ç×µÄÓÒÊÖ??µ?ÊÇÄ?Ç×ÖªµÀÕâÓÒÊÖ?ØÐë?îÈ???Ëý??ÄÜΪ×Ô
?ºµÄ?ãÀû?øµ?ÎóÁËÅ??ùµÄÇà?º??µ????ÎÀ?µ?ÎÒÃǵÄÆÆÃÅÍâµÄÊ?ºò??Ä?Ç×µÄÊÖ?ͺÍ?ùÒ?
ÑùµÄÁ???Á?ÉÏÃ?ÓÐѪÉ??ª?ªÄÇÊÇÒõÀúËÄÔÂ??ÌìÆøºÜÅ????ó?Ò??ÅÂËýÔÎ?ýÈ????ÉÊÇ??Ëý
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
ÕõÔú×Å??Ò?×Å×ì????ÊÖ?ö×ÅÃÅ?ò???????ÎÐìÐìµÄ×ßÈ??????Ã???ÃÄ?ËÀÁË??Èý?ãÒÑ?ö?Þ??
?ç?ç??ÔÚ?Ò??ÎÒÓÖ×?Ñ?Ð????ÒÖÐÖ?Ê?Ä?Ç××Ô?º??Ëý??Ðë×ÔÔçÖÁÍíµÄ?Ù×????ÉÊÇÖÕÈÕÃ?
È˺ÍËý˵Ò??ä????ÐÂÄêµ?ÁË??Õý?ÏÉÏÕþ????ÓÃÑôÀú????Ðí?ý?ÉÄê???ýÏ???ÎÒÇëÁËÁ?Ð?
Ê?µÄ?Ù??ÓÉÓµ??????µÄ?ÖÊÐ?ص?ÇåÂ?ÀäÔîµÄ?ÒÖÐ??Ä?Ç×Ð?ÁË????ÖÁÌý˵ÎÒ??Ðë?ØÐ???
ËýÀã×?ÁË???ëÌì??Ëý?ÅÌ??öÒ??ÚÆøÀ???µ?ÎÒ?Ã×ßµÄÊ?ºò??ËýµÝ?øÎÒÒ?Ð???Éú????È??É??
Ð?×Ó!???ÖÉÏÊÇÄÇÃ?ÈÈÄÖ??ÎÒÈ?Ê?Ã?Ò?Ã????û??ÀáÕÚÃÔÁËÎÒµÄÑÛ???ñÌì??ÀáÓÖÕÚ×?ÁËÎÒ
µÄÑÛ??ÓÖÏëÆðµ?ÈÕ?Â?ÀµÄ?ýÄÇÆà?ÒµÄ?ýÏ?µÄ?ÈÄ????ÉÊÇ???ÈÄ????áÔÙºòÅÎ×ÅÎÒÁË??Ëý
ÒÑÈëÁËÍÁ!
?ùÅ?µÄÉúÃüÊÇ??ÒÀË?×Å??Ä?ËùÍ?ϵÄ?ìµÀÒ?Ö?Ç??øµÄ??ËùÒÔÀÏÈË×ÜÃâ??ÁËÉËÐÄ??ÎÒØ?
ÈýËê??Ä?Ç×ÒªÎÒ?á?é??ÎÒ??Òª??ÎÒÇëÀ?Èý?ã?øÎÒ˵Çé??ÀÏÄ?º?ÀáµãÁËÍ???ÎÒ??Ä?Ç×??
µ?ÊÇÎÒ?øÁËËý×î?óµÄ?ò????Ê??úÊ?ÎÒ?ÉΪÄæ×Ó??Ø?ÆßËê??ÎÒÉÏÁËÓ??ú??ΪÁË×Ô?º??ÎÒ
?øÁùÊ??àËêµÄÀÏÄ?ÒÔµÚ?þ?Î?ò????ÔÚËýÆßÊ??óÊÙµÄÄÇÒ?Ìì??ÎÒ??Ô?ÔÚÒìÓò??ÄÇÌì???Ý
?ã?ãÃǺóÀ??æËßÎÒ??ÀÏÌ?Ì?Ö?ºÈÁËÁ??Ú?Æ??ºÜÔçµÄ?ãË?ÏÂ??ËýÏëÄîËýµÄÓ××Ó???ø???ã
˵?öÀ???
ÆßÆß??Õ?ºó??ÎÒÓÉ?ÃÄÏÌÓ?öÀ?????Æ?ÓÖÏñ?ý×ÓÄÇÄêËƵÄ???í×ÓÕ??ÝÁË???ÉÊÇÄ?Ç×ÈÕÒ?
µëÄîµÄÓ××ÓÈ?Åܵ?Î?ÄÏÀ???Ä?Ç×ÔõÑùÏëÄîÎÒ??ÎÒ?ÉÒÔÏëÏñµÃµ????ÉÊÇÎÒ??ÄÜ?ØÈ???Ã?
?ê?Óµ??ÒÐÅ??ÎÒ×Ü???ÒÂíÉÏ?ð????ÎÒÅÂ??ÅÂ??ÅÂ??ÅÂÓÐÄÇ??ÏêµÄÏûÏ???ÈË????Ê??îµ?
?Ë?ÅÊ?Ëê??ÓÐÄ?Ç×?ã?ÉÒÔ?àÉÙ??Óеãº?×ÓÆø??Ê?ÁË?ÈÄ??ãÏñ???åÔÚÆ?×ÓÀï??ËäÈ???ÓÐ
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
É?ÓÐÏã??È?Ê?È?ÁË?ù??ÓÐÄ?Ç×µÄÈË??ÐÄÀïÊÇ????µÄ??ÎÒÅÂ??ÅÂ??ÅÂ?ÒÐÅÖÐ?øÀ???ºÃµÄ
ÏûÏ????æËßÎÒÒÑÊÇÊ?È?ÁË?ùµÄ???Ý??
È?ÄêÒ?Äê??ÎÒÔÚ?ÒÐÅÖÐÕÒ??µ??ØÓÚÀÏÄ?µÄÆð?ÓÇé?ö??ÎÒÒÉÂÇ??º?ÅÂ??ÎÒÏëÏñµÃµ???Ã?
ÓÐ??ÐÒ???ÒÖÐÄîÎÒÁ?Íö?Â?à???ò??ÈÌÏà?æ??Ä?Ç×µÄÉúÈÕÊÇÔÚ?ÅÔÂ??ÎÒÔÚ?ËÔÂ?ëÐ?È?×?
ÊÙµÄÐÅ??Ëã?Æ×Å?áÔÚÊÙÈÕÖ?Ç?µ??ï??ÐÅÖÐÖö?ÀÇ?Íò?ÑÊÙÈÕµÄÏêÇéÐ?À???Ê?ÎÒ??ÔÙÒÉÂÇ??
Ê??þÔÂ?þÊ?ÁùÈÕ??ÓÉÎÄ??ÀÍ?ü?ó?áÉÏ?ØÀ???ÎÒ?Óµ??ÒÐÅ??ÎÒ???Ò?ð?Á???ÍÇÞÇ???ÎÒ?ð
?ªÐÅ??Ä?Ç×ÒÑÈ?ÊÀÒ?ÄêÁË!
ÉúÃüÊÇÄ?Ç×?øÎÒµÄ??ÎÒÖ?ÄÜ???ó?ÉÈË??ÊÇÄ?Ç×µÄѪº??àÑøµÄ??ÎÒÖ?ÄÜ?ÉΪÒ??ö??Ê??Ö
?µµÄÈË??ÊÇÄ?Ç×?Ð??µÄ??ÎÒµÄÐÔ?ñ??Ï??ß??ÊÇÄ?Ç×???øµÄ??ËýÒ?ÊÀÎ?ÔøÏí?ýÒ?Ìì????
ÁÙËÀ???ÔµÄÊÇ?ÖÁ?!??!??˵Ê?Ã?ÄØ?ÐÄÍ?!ÐÄÍ?!
??
??
??
??
ÍùÁ?µãµãÍ?www.WL566.com
ÍùÁ?µãµãÍ?www.WL566.com
ÍùÁ?µãµãÍ???Ïí×ÊÔ?
-----------------------------
×ÊÁÏ˵Ã?
-----------------------------
?Ã×ÊÔ?ÓÉÍùÁ?µãµãÍ?ËÑË?ÓÚÍøÂç???ª×ÊÔ????ö??ÍøÓÑä?ÀÀÔÄ?Á??ÇëÎðÓÃÓÚÉÌÒµÓÃÍ???
ÍùÁ?µãµãÍ???ÊÇÃâ?ѵÄÐÂÒ??úµçÄÔ?ÜÀí??ÍøÂçÓ?ÓÃ×ÀÃæÈí?þ??
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick
Í??ý?ò?àÇåË????ÉËæÒâÇÐ??µÄÁ?ÖÖ???Ú?Ù×??çÃæ??????ÁËÓÃ????µçÄÔ????ÁªÍøÖ??äË???µÄÈë?ÚÆ?Ì???ΪÓÃ???ÜÀíµçÄÔ??ÖÇÄÜ?ì?????ì?ÝÉÏÍø??ÍæתÓ?ÓÃ??Èç
ÓÎÏ???????Ìá??È???Î?Ò?Õ?Ê?µÄ?þÎñ??ÈÃÓÃ??Ö?ÐèÍ??ýÍùÁ?µãµãÍ????ÍÄÜ?ã?ݵ??ïÐÅÏ?Ê??úµÄ???ö?ÇÂä??ÕæÕýʵÏÖÒ??üÖ??ï??µãµã?ÍÍ???
ÍùÁ??ìËÑË??ºÎÞÂÛÊÇËÑË?Ó?ÅÌ×ÊÔ????éÕÒÍøÂç×ÊÔ?????ÊÇ×?×ÙÈÈÃÅÓ?ÓÃ????ÄÜÏíÊÜÇ?ËùÎ?ËùµÄ?ìËÙ?È??Èç??µØÎÄ?þËÑË???Ç?ÍòÎÄ?þ??ÁãÃë?ÊÏÖ??ÈçÍøÂçËÑË???Ö?ÐèÊäÈëÒ??Î?Ø?ü?Ê???ãÄÜÍ????ò?ª?Ù?È??googleµÈ?à?öËÑË?ÒýÇæµÄ?á?ûÒ???
ÍùÁ?ÓÅÓ?ÓÃ?ºÓëÄ?Ð?Èí?þÏà?È??ÍùÁ?µãµãÍ?×?ÇóÂÌÉ?ÎÞ?ã?æµÄÌåÑé????Ñ?×îÓÅÖʵÄÍøÂçÓ?ÓÃ??ΪÓÃ??Ìá??????ʵÔÚµÄÉú?î????×???Ñ?Ï???ÓéÀÖ??ÐÝÏÐÓ?ÓÃ?Õ?ä??
ÍùÁ?µãµãÍ???ÈÃÄúÓÃwindowsµÄÊ?ÓÃÏ??ßÏíÊÜÆ??ûµÄ?Ù×?ÌåÑé??
?é??ºÍ?ÖÏí?ü?àÓÅÖÊ×ÊÔ???Çë?øÈëwww.WL566.com
ÏÂÔØÍùÁ?µãµãÍ???ÕÒµ?ÄúµÄÒ?ÇÐÍøÂçËùÐè??
ÍùÁ?ÍøÖ?µ?º??óÈ? www.www321.com
ÍùÁ?µãµãÍ???ÈÃÄúÎÞÕÏ?,??ÓÎÍøÂçÊÀ?ç??
enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: 6.1.3.1 heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick