洗桶房铝扣板吊顶施工方案

2017-09-18 9页 doc 79KB 15阅读

用户头像

is_496339

暂无简介

举报
洗桶房铝扣板吊顶施工方案洗桶房铝扣板吊顶施工方案 编制:陈玉龙 审核:陈忠庆 批准:李家庆 中建华恒,天津,设备安装工程有限公司 2014年12月14日 industrial electronics. (3) auto configuration, theory, maintenance, structure and principle of Automotive electrical equipment, maintenance, car electric control system of structure, principle a...
洗桶房铝扣板吊顶施工方案
洗桶房铝扣板吊顶施工 编制:陈玉龙 审核:陈忠庆 批准:李家庆 中建华恒,天津,设备安装工程有限公司 2014年12月14日 industrial electronics. (3) auto configuration, theory, maintenance, structure and principle of Automotive electrical equipment, maintenance, car electric control system of structure, principle and repair of professional knowledge. (4) the structure and working principle of auto test and diagnostic equipment, control of automobile comprehensive performance evaluation parameters and influencing factors. (5) the master the theory of rational use of the car and running material, business management, basic theoretical knowledge of marketing and after-sales service protection of cables can be up to, while also providing a fire-proof, sealed, rugged space can safely extend cable to the destination. Channel selection algorithm and subsystem level design algorithm. As with vertical bridge, horizontal bridges must also retain a certain amount of space allowances to ensure that future expansion of the system without the need to install a new line. Sixth section 2.6.1 PDS cabling system design, and building design of the comprehensive wiring system according to the requirements, new Dunan valve plant main building, workshop structure, data, voice in the future; in the uniform distribution. Main connection (MDF) located on the production floor of the second floor Center room (network equipment), by telephone calls outside the telephone Office is responsible for introducing the main wiring in the building, switching locations are also located 铝扣板吊顶工程 工程概况:本工程位于GSS room首层洗桶房~施工面积10?~采用欧陆牌600*600铝扣板吊顶~飞利浦牌灯具。 一、施工准备 (一)作业条件 1(安装完顶棚内的各种管线及设备~确定好灯位、通风口及各种照明孔口的位置。 2(顶棚罩面板安装前~应作完墙、地湿作业工程项目。 3(搭好顶棚施工操作平台架子、护栏。 4(轻钢骨架顶棚在大面积施工前~应做样板间~对顶棚的起拱度、灯槽、窗帘盒、通风口进行构造处理~经鉴定后再大面积施工。 (二)材料准备 铝合金方板板材、龙骨、吊杆、灯具等。 (三)施工机具 冲击钻、无齿锯、钢锯、射钉枪、刨子、螺丝刀、吊线锥、角尺、锤子、水平尺、白线、墨斗等 二、质量要求 industrial electronics. (3) auto configuration, theory, maintenance, structure and principle of Automotive electrical equipment, maintenance, car electric control system of structure, principle and repair of professional knowledge. (4) the structure and working principle of auto test and diagnostic equipment, control of automobile comprehensive performance evaluation parameters and influencing factors. (5) the master the theory of rational use of the car and running material, business management, basic theoretical knowledge of marketing and after-sales service protection of cables can be up to, while also providing a fire-proof, sealed, rugged space can safely extend cable to the destination. Channel selection algorithm and subsystem level design algorithm. As with vertical bridge, horizontal bridges must also retain a certain amount of space allowances to ensure that future expansion of the system without the need to install a new line. Sixth section 2.6.1 PDS cabling system design, and building design of the comprehensive wiring system according to the requirements, new Dunan valve plant main building, workshop structure, data, voice in the future; in the uniform distribution. Main connection (MDF) located on the production floor of the second floor Center room (network equipment), by telephone calls outside the telephone Office is responsible for introducing the main wiring in the building, switching locations are also located 1 页 共 4 页 第 P&G XQ plant PCC Room project 【铝扣板施工方案】 (一)暗龙骨吊顶工程 质量要求符合《建筑装饰装修工程质量验收》(GB350210—2001)的。 表2,1 检查项目 允许偏差或允许值 主控项目 1标高、尺寸、起拱、造型 第6.2.2条 2 饰面材料 第6.2.3条 3 吊杆、龙骨、饰面材料安装 第6.2.4条 4 吊杆、龙骨材质、间距及连接方式 第6.2.5条 5 石膏板接缝 第6.2.6条 一般项目 1 材料表面质量 第6.2.7条 2 灯具等设备 第6.2.8条 3 龙骨、吊杆接缝 第6.2.9条 4 填充材料 第6.2.10条 5 允许 偏差 (mm) 表面平整度2 ;接缝直线度1.5 ;接缝高低差1 三、工艺流程 基层弹线?安装吊杆?安装主龙骨?安装边龙骨?安装次龙骨?安装铝合 金方板?饰面清理?分项、检验批验收 四、施工工艺 1(弹线:根据楼层标高水平线~按照设计标高~沿墙四周弹顶棚标高水平线~并找出房间中心点~并沿顶棚的标高水平线~以房间中心点为中心在墙上画好龙骨分档位置线。,示意图, 第 1 页 2(安装主龙骨吊杆:在弹好顶棚标高水平线及龙骨位置线后~确定吊杆下 端头的标高~安装预先加工好的吊杆~吊杆安装用帕膨胀螺栓固定在顶棚上。 吊杆选用帕圆钢~吊筋间距控制在1200mm范围内。 3(安装主龙骨:主龙骨一般选用C38轻钢龙骨~间距控制在1200mm范围内。 安装时采用与主龙骨配套的吊件与吊杆连接。 4(安装边龙骨:按天花净高要求在墙四周用水泥钉固定25×25mm烤漆龙骨~ 水泥钉问距不大于300mm。 5(安装次龙骨:根据铝扣板的规格尺寸~安装与板配套的次龙骨~次龙骨通过吊挂件吊挂在主龙骨上。当次龙骨长度需多根延续接长时~用次龙骨连接件~在吊挂次龙骨的同时~将相对端头相连接~并先调直后固定。 6(安装金属板:铝扣板安装时在装配面积的中间位置垂直次龙骨方向拉一条基准线~对齐基准线向两边安装。安装时~轻拿轻放~必须顺着翻边部位顺序将方板两边轻压~卡进龙骨后再推紧。 industrial electronics. (3) auto configuration, theory, maintenance, structure and principle of Automotive electrical equipment, maintenance, car electric control system of structure, principle and repair of professional knowledge. (4) the structure and working principle of auto test and diagnostic equipment, control of automobile comprehensive performance evaluation parameters and influencing factors. (5) the master the theory of rational use of the car and running material, business management, basic theoretical knowledge of marketing and after-sales service protection of cables can be up to, while also providing a fire-proof, sealed, rugged space can safely extend cable to the destination. Channel selection algorithm and subsystem level design algorithm. As with vertical bridge, horizontal bridges must also retain a certain amount of space allowances to ensure that future expansion of the system without the need to install a new line. Sixth section 2.6.1 PDS cabling system design, and building design of the comprehensive wiring system according to the requirements, new Dunan valve plant main building, workshop structure, data, voice in the future; in the uniform distribution. Main connection (MDF) located on the production floor of the second floor Center room (network equipment), by telephone calls outside the telephone Office is responsible for introducing the main wiring in the building, switching locations are also located 3 页 共 6 页 第 P&G XQ plant PCC Room project 【铝扣板施工方案】 7(清理:铝扣板安装完后~需用布把板面全部擦拭干净~不得有污物及手印等。 8(吊顶工程验收时应检查下列文件和记录: ?吊顶工程的施工图、设计说明及其他设计文件, ?材料的产品合格证书、性能、进场验收记录和复验报告, ?隐蔽工程验收记录, ?施工记录。 五、成品保护 1(轻钢骨架、罩面板及其他吊顶材料在入场存放、使用过程中应严格管理~保证不变形、不受潮、不生锈。 2(装修吊顶用吊杆严禁挪做机电管道、线路吊挂用,机电管道、线路如与 吊顶吊杆位置矛盾~须经过项目技术人员同意后更改~不得随意改变、挪动吊杆。 3(吊顶龙骨上禁止铺设机电管道、线路。 4(轻钢骨架及罩面板安装应注意保护顶棚内各种管线~轻钢骨架的吊杆、 龙骨不准固定在通风管道及其他设备件上。 5(为了保护成品~罩面板安装必须在棚内管道试水、保温等一切工序全部 验收后进行。 6(设专人负责成品保护工作~发现有保护设施损坏的~要及时恢复。 7(工序交接全部采用书面形式由双方签字认可~由下道工序作业人员和成品保护负责人同时签字确认~并保存工序交接书面材料~下道工序作业人员对防止成品的污染、损坏或丢失负直接责任~成品保护专人对成品保护负监督、检查责任。 第 3 页 industrial electronics. (3) auto configuration, theory, maintenance, structure and principle of Automotive electrical equipment, maintenance, car electric control system of structure, principle and repair of professional knowledge. (4) the structure and working principle of auto test and diagnostic equipment, control of automobile comprehensive performance evaluation parameters and influencing factors. (5) the master the theory of rational use of the car and running material, business management, basic theoretical knowledge of marketing and after-sales service protection of cables can be up to, while also providing a fire-proof, sealed, rugged space can safely extend cable to the destination. Channel selection algorithm and subsystem level design algorithm. As with vertical bridge, horizontal bridges must also retain a certain amount of space allowances to ensure that future expansion of the system without the need to install a new line. Sixth section 2.6.1 PDS cabling system design, and building design of the comprehensive wiring system according to the requirements, new Dunan valve plant main building, workshop structure, data, voice in the future; in the uniform distribution. Main connection (MDF) located on the production floor of the second floor Center room (network equipment), by telephone calls outside the telephone Office is responsible for introducing the main wiring in the building, switching locations are also located
/
本文档为【洗桶房铝扣板吊顶施工方案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索