为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

最适合儿童听的英文歌曲 2

2017-10-08 24页 doc 71KB 136阅读

用户头像

is_477730

暂无简介

举报
最适合儿童听的英文歌曲 2最适合儿童听的英文歌曲 2 英文歌 1. head and shoulders 推荐理由: 在北美这是一首家喻户晓的儿歌。这首歌发音准确规范,词汇所反映的事物十分具体,宝宝很容易通过自我观察了解儿歌所提到的“head”、“shoulders”、“knees”等。父母还可以教孩子边唱边用手指指向头、肩膀、膝盖等部位,使宝宝在快乐中学习和感知儿歌内容,真正做到“育教于动”、“育教于乐”。 刚开始唱的时候节奏可以慢一些,因为要连贯地做一系列动作,对宝宝来说实在是一件不大容易的事情。等宝宝动作协调了以后,可以越唱越快,非常有...
最适合儿童听的英文歌曲 2
最适合儿童听的英文歌曲 2 英文歌 1. head and shoulders 推荐理由: 在北美这是一首家喻户晓的儿歌。这首歌发音准确规范,词汇所反映的事物十分具体,宝宝很容易通过自我观察了解儿歌所提到的“head”、“shoulders”、“knees”等。父母还可以教孩子边唱边用手指指向头、肩膀、膝盖等部位,使宝宝在快乐中学习和感知儿歌内容,真正做到“育教于动”、“育教于乐”。 刚开始唱的时候节奏可以慢一些,因为要连贯地做一系列动作,对宝宝来说实在是一件不大容易的事情。等宝宝动作协调了以后,可以越唱越快,非常有趣。这个游戏极大地锻炼了宝宝身体动作的协调性,而且宝宝很快就能记住他身体这几个部位的英语名称了。 歌词: Head, shoulders, knees and toes, knees and toes, knees and toes, Head, shoulders, knees and toes, eyes and ears and mouth and nose, Head, shoulders, knees and toes, knees and toes, knees and toes, Head, shoulders, knees and toes, eyes and ears and mouth and nose, Eyes and ears and mouth and nose~ 歌词大意: 头、肩膀、膝盖、脚趾、膝盖、脚趾、膝盖、脚趾, 头、肩膀、膝盖、脚趾、眼睛、耳朵、嘴巴和鼻子, 头、肩膀、膝盖、脚趾、膝盖、脚趾、膝盖、脚趾, 头、肩膀、膝盖、脚趾、眼睛、耳朵、嘴巴和鼻子。 2. If you're happy 推荐理由: 这首脍炙人口的童谣,节奏欢快,琅琅上口。这首歌曲对节奏感要求比较强,能够很好地训练孩子的音乐节奏感,以及眼睛、手和脚的协调性,能更好地促进孩子的社交互动力。唱这首歌的时候可以把全家人甚至周围的人都发动起来,唱歌的人越多气氛就会越活跃,宝宝也就会越快乐~唱歌时一定要让宝宝配合肢体动作,让他们充分地融入到这种快乐的氛围中。具体做法如下: If you're happy and you know it, Clap your hands.(唱完这一句拍两下手) If you're happy and you know it, Clap your hands.(拍两下手) If you're happy and you know it,(双手在胸前交叉摆动) And your face will surely show it,(伸出两个食指从嘴巴往上划,做微笑状) If you're happy and you know it, Clap your hands.(拍两下手) medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high If you're happy, and you know it, Stomp your feet. (跺两下脚) If you're happy, and you know it, Stomp your feet. (跺两下脚) If you're happy, and you know it,(双手在胸前交叉摆动) Then, your face will surely show it.(伸出两个食指从嘴巴往上划,做微笑状) If you're happy, and you know it, Stomp your feet. (跺两下脚) If you're happy, and you know it, Shout “Hurray~”(双手举起来做欢呼状) If you're happy, and you know it, Shout “Hurray~” (双手举起来做欢呼状) If you're happy, and you know it, (双手在胸前交叉摆动) Then, your face will surely show it.(伸出两个食指从嘴巴往上划,做微笑状) If you're happy, and you know it, Shout “Hurray~” (双手举起来做欢呼状) If you're happy, and you know it, Do all three.(把拍手、跺脚、欢呼连起来做一遍) If you're happy, and you know it, Do all three.(把拍手、跺脚、欢呼连起来做一遍) If you're happy, and you know it, (双手在胸前交叉摆动) Then, your face will surely show it.(伸出两个食指从嘴巴往上划,做微笑状) If you're happy, and you know it,) Do all three.(把拍手、跺脚、欢呼连起来做一遍) 3.Six little ducks 推荐理由:这首儿歌整体段落较多,词汇量偏大,适合5—6岁宝宝学习。整首儿歌节奏欢快,旋律优美,并且形象地描绘了六只小鸭子的体态和动作。宝宝们喜欢模仿各种动物的动作,如果周围空间足够大,可以让宝宝模仿小鸭子走路。并且小鸭子嘎嘎嘎的叫声在歌曲中反复出现,小宝宝在听的时候能够不由自主的笑出声来,让其在快乐的环境中学习英语。 歌词: Six little ducks that I once knew. Fat ones, skinny ones, fair ones too. But the one little duck with a feather in his back. .1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and mater5.1.9 ng end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirementsprovide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the lohould diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, spe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pi-hould be used to pipe rack, suitable structures, nononnection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube sinal Cr cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Termeaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes aftegs, clblowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittintal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be tube for pressure pipe cards, isolation with a rubber plate, bracket horizon-teed to exclude gas or condensate. 5.1.7.5 angle and u50mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranmedium above the surface of the pipe and heat, and their spacing is greater than 1ial. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high2 He ruled the others with a quack, quack, quack~ Quack, quack, quack, quack, quack, quack~ He led the others with a quack, quack, quack~ Down to the river they would go, Wibble wobble, wibble wobble, to and fro, But the one little duck with the feather on his back, He led the others with a quack, quack, quack~ Quack, quack, quack, quack, quack, quack~ He led the others with a quack, quack, quack~ Home from the river they would come, Wibble wobble, wibble wobble, ho-hum-hum~ But the one little duck with the feather on his back, He led the others with a quack, quack, quack~ Quack, quack, quack, quack, quack, quack~ He led the others with a quack, quack, quack~ 歌词大意: 我认识六只小鸭, 他们有的胖,有的瘦,有的不胖也不瘦。 但是有一只背上长着一根羽毛的小鸭, 嘎嘎地叫着带领其他小鸭。 嘎嘎嘎,嘎嘎嘎,他嘎嘎地叫着带领其他小鸭。 他们会跑向小河, 摇摇晃晃,摇摇晃晃,来来回回。 但是有一只背上长着一根羽毛的小鸭, 嘎嘎地叫着带领其他小鸭。 嘎嘎嘎,嘎嘎嘎,他嘎嘎地叫着带领其他小鸭。 他们会从小河跑回来, 摇摇晃晃,摇摇晃晃,快乐地叫着。 但是有一只背上长着一根羽毛的小鸭, 嘎嘎地叫着带领其他小鸭。 4. Twinkle,twinkle, little star 推荐理由:这是一首非常著名的英文儿歌,其旋律出自法国民谣《妈妈听我说》,歌词出自真?泰勒的英文诗歌《小星 星》。这首儿歌节奏轻柔温馨,让人不由变得安静和快乐。在唱整首歌的过程中,可以让宝宝的身子跟着音乐节奏轻轻 摇晃,让宝宝更好的体会歌曲温馨的旋律。为了帮助宝宝更好的记忆,还可以配合儿歌做手指游戏,具体做法如下: Twinkle,twinkle, little star,(两个手的手指一张一合,示意星星在眨眼睛) How I wonder what you are,(两个食指放在太阳穴旁边做思索状) Up above the world so high,(双手举到空中随着音乐节奏摇晃) Like a diamond in the sky.(两手的食指和大拇指分别伸出来放在一起,做成一个钻石形状) 歌词: Twinkle, twinkle, little star, How I wonder what you are. Up above the world so high, Like a diamond in the sky. Twinkle, twinkle, little star, remov-llowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, nonhreaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of aend. Tthere should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe s pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, 1.8 gapacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.e for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying stub-u g to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle andove the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should accordinmedium abcal vibration and away from magnetic fields and highchanidrawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without me e. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the designvalv ed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a draintemperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be install , highht move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000Cable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: mig3 How I wonder what you are. 歌词大意: 一闪一闪亮晶晶,神奇可爱的小星星, 高高挂在天空中,好象宝石放光明, 一闪一闪亮晶晶,神奇可爱的小星星。 5. Bingo 推荐理由: 这首也是北美经典的儿童歌曲之一,节奏轻松愉快,旋律优美,琅琅上口。儿歌讲述了有一个农夫,养了一只小狗,小狗的名字叫宾果,这样一个简单的故事。当唱到“here was a farmer had a dog”此时可以用手指在灯光的投影下 做出小狗的图像(双手交叉紧握,将食指与中指伸直大拇指交叉)可以形象生动的让宝宝体会到小狗的形象,还能感受到光与影的奇妙。唱到“And Bingo was his name”此时可以让食指与中指各自上下移动,做出狗说话的样子,这 样可以帮助宝宝更加形象的记住这个短语。同时用拍手逐步的代替空缺的字母,可以加深宝宝对字母的认识。 歌词: There was a farmer had a dog, And Bingo was his name,oh~ B-I-N-G-O, B-I-N-G-O, B-I-N-G-O~ And Bingo was his name,oh~ There was a farmer had a dog, And Bingo was his name,oh~ (Clap~)-I-N-G-O, (Clap~)-I-N-G-O, (Clap~)-I-N-G-O~ And Bingo was his name,oh~ There was a farmer had a dog, And Bingo was his name,oh~ (Clap~ Clap~)-N-G-O, (Clap~ Clap~)-N-G-O,(Clap~Clap~)-N-G-O~ And Bingo was his name,oh~ There was a farmer had a dog, And Bingo was his name,oh~ (Clap~Clap~Clap~)-G-O, (Clap~Clap~ Clap~)-G-O, (Clap~ Clap~Clap~)-G-O~ And Bingo was his name, oh~ There was a farmer had a dog, And Bingo was his name,oh~ (Clap~ Clap~ Clap~ Clap~)-O, (Clap~ Clap~Clap~ Clap~)-O, (Clap~ Clap~ Clap~Clap~)-O~ And Bingo was his name,oh~ There was a farmer had a dog, And Bingo was his name,oh~ (Clap~ Clap~Clap~ Clap~ Clap~)(Clap~ Clap~ Clap~ Clap~ Clap~) (Clap~ Clap~ Clap~ Clap~ Clap~) And Bingo was his name,oh~ 歌词大意: 有一个农夫,他有一只狗, 宾果就是它的名字,噢~ B-I-N-G-O,B-I-N-G-O,B-I-N-G-O 宾果就是它的名字,噢~ 有一个农夫,他有一只狗, 宾果就是它的名字,噢~ (拍手~)-I-N-G-O,(拍手~)-I-N-G-O,(拍手~)-I-N-G-O~ 宾果就是它的名字,噢~ pe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pi-hould be used to pipe rack, suitable structures, nononnection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube sinal Cr cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Termeaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes aftegs, clblowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittintal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be tube for pressure pipe cards, isolation with a rubber plate, bracket horizon-teed to exclude gas or condensate. 5.1.7.5 angle and u50mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranmedium above the surface of the pipe and heat, and their spacing is greater than 1ial. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and mater5.1.9 ng end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirementsprovide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the lohould diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, s4 有一个农夫,他有一只狗, 宾果就是它的名字,噢~ (拍手~拍手~)-N-G-O,(拍手~拍手~)-N-G-O,(拍手~拍手~)-N-G-O~ 宾果就是它的名字,噢~ 有一个农夫,他有一只狗, 宾果就是它的名字,噢~ (拍手~拍手~拍手~)-G-O,(拍手~拍手~拍手~)-G-O,(拍手~拍手~拍手~)-G-O! 宾果就是它的名字,噢~ 有一个农夫,他有一只狗, 宾果就是它的名字,噢~ (拍手~拍手~拍手~拍手~)-O,(拍手~拍手~拍手~拍手~)-O,(拍手~拍手~拍手~拍手~)-O! 宾果就是它的名字,噢~ 有一个农夫,他有一只狗, 宾果就是它的名字,噢~ (拍手~拍手~拍手~拍手~拍手~)(拍手~拍手~拍手~拍手~拍手~)(拍手~拍手~拍手~拍手~拍手~) 宾果就是它的名字,噢~ 6. Little Peter Rabbit 推荐理由: 这首儿歌源自于美国著名儿童文学家毕翠克丝?波特的著作《彼得兔》。她的每一个故事都有几十幅精美生动的插图,而且都是她自己手绘的,全篇里的动物、植物都生动的真实充满着拟人化的细节,动物是与人一样的生灵,它的有人一样的喜怒哀乐,一样的大智慧一样的好心肠。 以此为背景创作的这首童谣,韵律感十足,有利于培养小宝宝举一反三的思维能力。通过改变空白处的单词,配以适当的肢体语言,可以锻炼宝宝快速的思维反应能力,同时也丰富了宝宝的单词记忆,用歌曲的意境带动宝宝思维的快速转换。在学习这首歌曲的时候,可以让宝宝在原地晃动着身体,扭扭屁股、扭扭腰,让其充分体会到儿歌快乐的氛围。 歌词: Little Peter Rabbit had a fly upon his ear. Little Peter Rabbit had a fly upon his ear. Little Peter Rabbit had a fly upon his ear. And he flicked it till it flew away! Little Peter ____ had a fly upon his ear. Little Peter ____ had a fly upon his ear. Little Peter ____ had a fly upon his ear. And he flicked it till it flew away! Little Peter ____ had a ____ upon his ear. e. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the designvalv ed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a draintemperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be install , highht move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000Cable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: migremov-llowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, nonhreaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of aend. Tthere should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe s pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, 1.8 gapacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.e for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying stub-u g to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle andove the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should accordinmedium abcal vibration and away from magnetic fields and highchanidrawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without me 5 Little Peter ____ had a ____ upon his ear. Little Peter ____ had a ____ upon his ear. And he flicked it till it flew away! Little Peter ____ had a ____upon his ____. Little Peter ____ had a ____upon his ____. Little Peter ____ had a ____upon his ____. And he flicked it till it flew away! 歌词大意: 小兔彼得的耳朵上有一只苍蝇。 小兔彼得的耳朵上有一只苍蝇。 小兔彼得的耳朵上有一只苍蝇。 他轻轻地弹它,直到它飞走。 小____彼得的耳朵上有一只苍蝇。 小____彼得的耳朵上有一只苍蝇。 小____彼得的耳朵上有一只苍蝇。 他轻轻地弹它,直到它飞走。 小____彼得的耳朵上有一只____。 小____彼得的耳朵上有一只____。 小____彼得的耳朵上有一只____。 他轻轻地弹它,直到它飞走。 小____彼得的____上有一只____。 小____彼得的____上有一只____。 小____彼得的____上有一只____。 他轻轻地弹它,直到它飞走。 7.~ Long Long Ago ~ tell me the tales that to me was so dear, long, long ago,long, long ago; sing me the songs i delighted to hear, long, long ago,long ago. now you have come,all my grief is removed, let me forget just as long as i do, let me believe that you always be near, ial. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and mater5.1.9 ng end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirementsprovide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the lohould diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, spe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pi-hould be used to pipe rack, suitable structures, nononnection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube sinal Cr cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Termeaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes aftegs, clblowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittintal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be tube for pressure pipe cards, isolation with a rubber plate, bracket horizon-teed to exclude gas or condensate. 5.1.7.5 angle and u50mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranmedium above the surface of the pipe and heat, and their spacing is greater than 16 long, long ago,long ago. do you remember the path where we met, long, long ago,long, long ago? 8.Mary had a little lamb~ mary had a little lamb little lamb,little lamb mary had a little lamb its fleece was white as snow and everywhere that mary went mary went ,mary went and everywhere that mary went the lamb was sure to go it followed her to school one day school one day ,school one day it followed her to school one day that was against the rule la la la la la la la la la la la la 9.you are my sunshine you are my sunshine, my only sunshine, you make me happy e. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the designvalv ed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a draintemperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be install , highht move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000Cable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: migremov-llowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, nonhreaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of aend. Tthere should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe s pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, 1.8 gapacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.e for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying stub-u g to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle andove the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should accordinmedium abcal vibration and away from magnetic fields and highchanidrawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without me7 when skies are grey. you'll never know dear, how much i love you. please don't take my sunshine away. the other night dear, as i lay sleeping, i dreamt i held you in my arms. when i awoke dear, i was mistaken, so i hung my head and cried 你是我的阳光 你是我的阳光,我独有的阳光 你在天空灰暗时给我带来快乐 你永远也不知道,亲爱的,我有多么爱你 请不要带走我的阳光 在一个夜晚,亲爱的,当我进入梦乡 我梦见我将你揽入我的怀中 但一觉醒来,我发现这是假的 因此我低头啜泣。。。 10.Row Your Boat row row row your boat, 划呀划,划小船 gentely down the stream, 顺着溪流而下 merrily merrily merrily merrily, 真快乐啊真快乐 removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pi-hould be used to pipe rack, suitable structures, nononnection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube sinal Cr cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Termeaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes aftegs, clblowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittintal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be tube for pressure pipe cards, isolation with a rubber plate, bracket horizon-teed to exclude gas or condensate. 5.1.7.5 angle and u50mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranmedium above the surface of the pipe and heat, and their spacing is greater than 1ial. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and mater5.1.9 ng end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirementsprovide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the lohould diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, spe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; 8 life is but a dream. 生活(就像划船一样)充满了梦想 11.twinkle twinkle little star Twinkle, twinkle, little star, How I wonder what you are. Up above the world so high, Like a diamond in the sky. Twinkle, twinkle, little star, How I wonder what you are. 一闪一闪亮晶晶,满天都是小星星 挂在天空放光明,好象千万小眼睛。 一闪一闪亮晶晶,满天都是小星星 12.Baa baa black sheep Baa baa black sheep 黑绵羊咩咩叫 Have you any wool? 你有没有羊毛 Yes sir, yes sir 有有有,先生 Three bags full. 我有整整三袋毛 One for my master, 一袋送给男主人 One for my dame, 一袋送给女主人 And one for the little boy Who lives down the lane. 一袋送给巷子里住着的小男孩儿 周次 歌曲 第一、二、三周 head and shoulders , highht move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000Cable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: migremov-llowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, nonhreaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of aend. Tthere should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe s pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, 1.8 gapacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.e for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying stub-u g to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle andove the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should accordinmedium abcal vibration and away from magnetic fields and highchanidrawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without me e. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the designvalv ed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a draintemperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be install9 第四、五、六周 If you're happy 第七、八、九周 Twinkle,twinkle, little star 第十、十一、十二周 Little Peter Rabbit 第十三、十四、十五周 Bingo 第十六、十七周 Baa baa black sheep ial. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and mater5.1.9 ng end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirementsprovide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the lohould diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, spe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pi-hould be used to pipe rack, suitable structures, nononnection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube sinal Cr cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Termeaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes aftegs, clblowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittintal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be tube for pressure pipe cards, isolation with a rubber plate, bracket horizon-teed to exclude gas or condensate. 5.1.7.5 angle and u50mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranmedium above the surface of the pipe and heat, and their spacing is greater than 110
/
本文档为【最适合儿童听的英文歌曲 2】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索