为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 平安卡办卡流程

平安卡办卡流程

2018-12-23 36页 doc 336KB 9阅读

用户头像

is_314871

暂无简介

举报
平安卡办卡流程平安卡办卡流程 A. 办理新卡流程(以下操作方法未经特殊说明均为单击鼠标左键) 一 单卡申请步骤 1.进入新卡办理流程 登录进入管理系统后在左侧导航中找到办卡申请(平安卡管理=>办卡申请),办卡申请=> 办理新卡=>下一步 第一步: 单击办卡 申请 第二步: 选择办理 新卡 第三步: 单击下一 步 2.选择单卡申请 仔细阅读右侧操作帮助,准备好单卡申请所需的资料,单击单卡申请 第一步:仔 细阅读操 作帮助,按 要求准备 申请资料 第二步:单 击单卡申 请 第三步: 单击下一 步 3(填写申请资料 ...
平安卡办卡流程
平安卡办卡流程 A. 办理新卡流程(以下操作方法未经特殊说明均为单击鼠标左键) 一 单卡申请步骤 1.进入新卡办理流程 登录进入管理系统后在左侧导航中找到办卡申请(平安卡管理=>办卡申请),办卡申请=> 办理新卡=>下一步 第一步: 单击办卡 申请 第二步: 选择办理 新卡 第三步: 单击下一 步 2.选择单卡申请 仔细阅读右侧操作帮助,准备好单卡申请所需的资料,单击单卡申请 第一步:仔 细阅读操 作帮助,按 要求准备 申请资料 第二步:单 击单卡申 请 第三步: 单击下一 步 3(填写申请资料 仔细阅读右侧操作帮助,然后按要求填写申请信息,操作中需要注意以下几点 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 1. 请必须填写带'*'符号的信息,并且上传人员头像,图片必须为jpg格式,并且图片大 小不要超过2M。 2. 如果申请人无身份证号,请填写18个0。() 3. 如果页面出现红色框框,则表示信息没有填写完整,或者填写有误,请填写正确后,再 下一步”按钮。 点击“ 4. 若工种选择其他工种,后面的其他工种值为必填 5.对照片切割方法有疑惑的用户请参照帮助中心的截图说明进行操作(要求切割成尺寸为: 295*413像素的图片) :808/helper/screenshot/screenshot1.php 要求切割成第一步:阅 尺寸为:读操作帮 295*413像助 素的图片 第二步:按 要求填写 申请资料 第三步:点 击下一步 4(完成申请操作 若您需要打印缴费涵,直接点击完成按钮 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 操作一:若 需直接打印 缴费涵:点 击完成 操作二:若 需查询历史 申请批次: 点击左侧导 航‘批次历 史信息’ 操作一:点击完成,立即打印邀请涵,(注意: 仅适用于现金收讫,打印的是现金收讫函,若需要打 印银行汇款函请进入批次历史信息操作) 操作二:进入批次历史信息(注意:适用于点击完成时打印失败或者需要打印银行汇款函的操 作) meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 第一步: 点击批次第三步:历史信息 单击需要 打印的单 据类型 第二步: 找到本次 操作产生 的批次单 击列 一 批量申请步骤 1.进入新卡办理流程 登录进入管理系统后在左侧导航中找到办卡申请(平安卡管理=>办卡申请),办卡申请=> 办理新卡=>下一步 第一步: 单击办卡 申请 第二步: 选择办理 新卡 第三步: 单击下一 步 2.选择批量申请 仔细阅读右侧操作帮助,准备好单卡申请所需的资料,单击批量申请 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 第一步:仔 细阅读操 作帮助,按 要求准备 申请资料 第二步: 单击批量 申请 第三步: 单击下一 步 3.上传人员信息excel 和人员头像 仔细阅读右侧操作帮助,准备好单卡申请所需的资料,单击批量申请(文档格式和图片 命名将在下一步讲解) 第一步:仔 细阅读操作 第二步:下帮助 载excel文档 和zip压 缩文档模板 第三步:编 辑好excel文第四步:点档和图片名击下一步 后在此按要 求上传 3-2.填写excel 和zip照片压缩包中图片命名规则说明 一( Zip压缩包注意事项 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 1. 文件夹的命名必需和zip压缩包的名称一致 2. 照片的名称必需与excel文档中的身份证号码一栏相对应 文件夹的命 名必需和zip 压缩包的名 称一致 照片的名称 必需与excel 文档中的身 份证号码一 栏相对应 二( Excel书写注意事项 1. 必须是Excel2003格式,大小不超过4M 2.若没有身份证号码请随意填写一个4位数字代替(不能与其他随意填的数字 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 想同) 3. 姓名,性别,民族,学历,户籍所在地,身份证号,出生日期,工种(如果是其他工种, 下一列其他工种必须填写)是必须填写的,后面几列是选填 4. 特别注意:批量申请中,身份证号码存在的,无需填写出生日期,如无身 份证号码的,必须填写出生日期。 5. 图片压缩包的中照片的文件名必须为<身份证号码.jpg>,和excel中的身份证 号码一一对应 6. 性别,民族,学历,工种请从下拉框中选择,不能自己填写,如果工种不在下拉列 表中, 选择其他工种,在右边的其他工种中输入 工种名称 下载模板 后请仔细 阅读帮助 说明,按要 求填写 4.完成批量申请操作 若您需要打印缴费涵,直接点击完成按钮 操作一:若 需直接打印 缴费涵:点 击完成 操作二:若 需查询历史 申请批次: 点击左侧导 航‘历史批 次查询’ meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 操作一:点击完成,立即打印邀请涵,(注意: 仅适用于现金收讫,打印的是现金收讫函,若需要打 印银行汇款函请进入批次历史信息操作) 操作二:进入批次历史信息(注意:适用于点击完成时打印失败或者需要打印银行汇款函的操 作) 第一步: 点击批次第三步:历史信息 单击需要 打印的单 据类型 第二步: 找到本次 操作产生 的批次单 击列 一 批量申请步骤 1.进入新卡办理流程 登录进入管理系统后在左侧导航中找到办卡申请(平安卡管理=>办卡申请),办卡申请=> 办理新卡=>下一步 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry B. 补卡流程 1. 进入补卡流程 第一步: 单击办卡 申请 第二步: 选择申请 补卡 第三步: 点击下一 步 2. 查询需要补卡的人员 第一步:阅读操 作帮助,按要求 操作 第二步:输入任 意一项信息后 点击查询,看图 片是否为本人,第三步:照片检若不对按重置查无误后点击按钮, 下一步 3(完成申请操作 若您需要打印缴费涵,直接点击完成按钮 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 操作一:若 需直接打印 缴费涵:点 击完成 操作二:若 需查询历史 申请批次: 点击左侧导 航‘历史批 次查询’ 操作一:点击完成,立即打印邀请涵,(注意: 仅适用于现金收讫,打印的是现金收讫函,若需要打 印银行汇款函请进入批次历史信息操作) 操作二:进入批次历史信息(注意:适用于点击完成时打印失败或者需要打印银行汇款函的操 作) meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry 第一步: 点击批次第三步:历史信息 单击需要 打印的单 据类型 第二步: 找到本次 操作产生 的批次单 击列 平安卡缴费: a、 现金缴费:申请企业打印现金收讫函,凭现金收讫函到办卡中心申请缴费,办卡中心盖章 后出具接受回执(注:企业拿到回执单后开始制卡) b、银行转账:申请企业打印银行转账函,根据银行转账函上的信息进行银行转账(转账时请 在摘要上注明所属批次号),凭银行转账单据(银行单据)和银行转账函(打印单据)到办 卡中心换取接受回执(办卡中心到帐后即开始制卡,可延后换取回执) 平安卡取卡: 申请企业登录网站首页面查询办卡进度,当办卡进度显示“已办卡”时,申请企业凭接受回执 前往办卡中心取卡 操作说明: 1.平安卡首次办理10元/人,补办15元/人,平安卡打卡机的购买费用可在办卡时一并缴纳, 具体费用和配置说明请咨询办卡中心; 2. 办卡受理时间:周一至周五8:30-16:30(法定节假日不受理办卡业务) 3(办卡地点:温州市建设工程安全管理协会------温州市黎明西路307弄12号机械大厦801 室 4(联系电话:88896081或者88896082 5(联系人:王世杰 孙武 考勤查询: 卡片用户可以登录网站在(平安卡服务=>考勤查询)中输入自己的 ID号和身份证号查询考勤 状况. :808/cardstatus/dutyrecordquery.php 操作提醒: 联系电话: 联系人: 李工 张工 meet the construction drawings provided strength and workability of construction requirements, mixing ratio must be determined by test. Construction when you need to change the mix of cementitious material, retesting, and submitted to the supervisor for approval. (2) mixing of cementitious materials, should be carried out strictly according to the test to determine the ingredients of ingredients, no tampering, ingredient weighing errors should be allowed subject to the following: cement ? 2%; sand, gravel is ? 3%, water, additives ? 1%. (3) the cementitious material in the mixing process should remain of coarse and fine aggregate water stability, according to changes in moisture content of aggregate and adjust water to ensure the accuracy of the water/cement ratio. (4) mixing time of cementitious materials: mechanical mixing of not less than 2~3min, not artificial mix. Local small artificial mixture of dry mix at least three times, then wet-mix to uniform color, can be used. (5) with cementitious materials should be mixed. Cementitious materials allowed interval should be determined through experiments, or refer to the table selected. Segregation during transport and storage, water mortar and masonry before mixing again, initial setting of cementitious materials shall not be used. Cementitious materials allow breaks when laying temperature (?) allowed interval (min), ordinary Portland cement and slag Portland cement 20~309012010~201351805~10195/8.4.5 and pozzolana cement masonry masonry with Pu casting method, the process is: masonry preparation – material selection ? puts pulp placed stone ? ... 8.5 8.5.1 masonry mortar for construction of masonry sand in the sand, and sift the sand shall not include grass-roots and other debris. Sand clay does not exceed 5%. Mixing of mortar 350L mortar mixer. Mixing time, finished feeding, and shall not be less than 1.5min, the batching process, cement batching error control within ? 5%. Mortar mix used cement mortar used in the blended into 3h, such as a temperature of over 30 ? c during the construction period, within 2H of the blended into finished, such as the phenomenon of cement mortar, mix again in front of the building. 8.5.2 brick material according to the design requirements, using precast concrete hollow brick, sourced locally. Brick games on to the site, with the supervision and sampling personnel of party a random sampling, compression test, qualified before the masonry. 8.5.3 masonry (1) water wet prior to brick and masonry, and moisture control in 10~10%, non-dried bricks on the wall. (2) according to the axis of the walls of the brick walls where the pop-up and the sideline, bricks, build the first pendulum, from the mortar joint width when laid brick, pay attention to window location effect of mortar joint. Seven separate masonry
/
本文档为【平安卡办卡流程】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索