为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

椭圆形封头标准

2017-09-21 27页 doc 74KB 100阅读

用户头像

is_321635

暂无简介

举报
椭圆形封头标准椭圆形封头标准 椭圆形标准封头(JB1154-73) 标记示例:椭圆形封头Dg400×4 JB1154-73 公称直径Dg 曲面高度直边高度h2 壁厚S 内表面积F 容积V 质量G (?) mm h1 mm mm 3 碳钢 高合金 mm mKg 3 2.9 4 4 3.88 5 4.91 300 75 25 6 6 0.121 0.0053 5.89 7 6.92 8 8 7.97 9 8.97 3 3.82 4 4 5.12 5 6.44 (350) 88 25 6 6 0.16 0.00802...
椭圆形封头标准
椭圆形封头标准 椭圆形标准封头(JB1154-73) 标记示例:椭圆形封头Dg400×4 JB1154-73 公称直径Dg 曲面高度直边高度h2 壁厚S 内面积F 容积V 质量G (?) mm h1 mm mm 3 碳钢 高合金 mm mKg 3 2.9 4 4 3.88 5 4.91 300 75 25 6 6 0.121 0.0053 5.89 7 6.92 8 8 7.97 9 8.97 3 3.82 4 4 5.12 5 6.44 (350) 88 25 6 6 0.16 0.00802 7.73 7 9.12 8 10.4 9 11.8 3 3 4.90 4 4 6.53 400 100 25 0.204 0.0115 5 8.16 6 9.90 accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and 公称直径曲面高度质量G 直边高度壁厚S 内表面积F 容积V 3 Dg h1 2 Kg h (?) mmm mm mm mm 7 11.0 0.0115 0.204 25 8 8 13.3 9 15.5 400 100 10 10 18.3 12 12 22.1 0.223 40 0.0134 14 14 26.0 16 16 30.0 3 6.07 4 4 8.20 5 10.3 25 6 6 0.254 0.158 12.3 7 14.7 8 16.6 (450) 112 9 18.6 10 22.7 12 27.0 14 0.275 0.0183 32.0 40 16 36.9 18 42.0 3 7.30 4 4 10.0 5 12.5 25 6 6 0.309 0.0213 15.1 7 17.6 8 8 20.1 500 125 9 22.6 10 10 27.1 12 12 32.7 40 14 14 0.333 0.0242 38.5 16 16 45.2 18 18 50.5 50 20 20 0.349 0.0262 59.0 3 10.4 600 150 25 4 4 0.436 0.0352 13.8 5 17.6 d butt joints, welding engineering2005 steel fusion welde-mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis 1000 punishment. (5) significant near miss should-resulting in serious consequences, the pursuit of leadership, along with 500 (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, 100 economic sanctions against them.-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500ing administrative sanctions should 10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concern-accident occurred, the direct punishment 0.5drical steel pressure vessel steel welded specification for construction and2005 vertical cylin-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-JB47302000 8 -2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-field equipment 4 HGJ2222002 industrial pipe welding engineering code for construction and acceptance of -89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-2 6 6 21.2 7 24.7 公称直径曲面高度质量G 直边高度壁厚S 容积V 内表面积F Dg h1 2 h (?) 3 mm mm mm mm mKg 8 8 28.3 0.436 0.0352 25 9 31.8 10 37.7 10 12 46.0 0.464 40 12 14 0.0396 53.9 600 150 14 16 61.5 16 18 70.0 20 20 0.483 0.0425 80.5 50 22 22 83.6 24 24 97.6 3 12.0 4 4 16.3 5 20.3 25 6 6 0.507 0.0442 24.5 7 28.5 8 8 32.7 9 36.7 (650) 162 10 44.0 12 53.0 40 14 0.538 0.0493 62.0 4 16 72.0 18 80.0 6 20 93.0 50 22 0.558 0.0526 104 8 24 113 3 14.0 4 4 18.5 5 23.4 25 6 6 0.584 0.0545 28.2 700 175 7 33.0 8 8 37.7 9 42.6 10 10 50.3 0.617 0.0603 12 12 60.0 accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and 40 14 14 71.4 16 16 81.6 18 18 91.6 公称直径曲面高度质量G 直边高度壁厚S 容积V 内表面积F Dg h1 2 h (?) 3 mm mm mm mm mKg 20 20 106 700 175 50 22 22 0.639 0.0642 118 24 24 130 3 17.9 4 4 23.9 5 29.9 25 6 6 0.754 0.0796 36.0 7 42.2 8 8 48.2 9 54.6 10 10 63.6 800 200 12 12 77.2 0.792 0.0871 40 14 14 91.3 16 16 104 18 18 117 20 20 136 22 22 0.814 0.0921 150 50 24 24 165 26 179 3 22.5 4 4 30.2 5 38.0 25 6 6 0.945 0.112 45.2 7 52.6 8 8 60.9 900 225 9 68.5 10 10 79.6 12 12 97.2 40 14 14 0.988 0.121 113 16 16 129 18 18 147 50 20 20 1.02 0.127 168 d butt joints, welding engineering2005 steel fusion welde-mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis 1000 punishment. (5) significant near miss should-resulting in serious consequences, the pursuit of leadership, along with 500 (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, 100 economic sanctions against them.-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500ing administrative sanctions should 10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concern-accident occurred, the direct punishment 0.5drical steel pressure vessel steel welded specification for construction and2005 vertical cylin-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-JB47302000 8 -2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-field equipment 4 HGJ2222002 industrial pipe welding engineering code for construction and acceptance of -89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-4 22 22 186 24 24 204 26 222 28 公称直径曲面高度质量G 直边高度壁厚S 内表面积F 容积V Dg h1 2 h (?) 3 mm mm mm mm mKg 3 27.4 4 4 36.7 5 46.2 25 6 6 1.16 0.151 55.5 7 64.8 8 8 74.1 9 83.5 10 10 97.2 12 12 117 1000 250 40 14 14 1.21 0.162 137 16 16 157 18 18 178 20 20 203 22 22 224 24 24 246 50 1.24 0.170 26 268 28 290 30 311 5 55.5 6 6 66.8 25 7 1.40 0.198 78.0 8 8 89.2 9 101 10 116 (1100) 275 10 12 140 40 14 1.45 0.212 164 16 188 18 211 20 242 50 22 1.49 0.222 268 24 292 accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and 5 65.1 6 6 78.6 7 92.2 1200 300 25 1.65 0.255 8 8 106 9 118 公称直径曲面高度质量G 直边高度壁厚S 内表面积F 容积V Dg h1 2 h (?) 3 mm mm mm mm mKg 10 10 137 12 12 165 40 14 14 1.71 0.272 194 16 16 222 18 18 250 20 20 285 1200 300 22 22 315 24 24 344 26 374 50 1.75 0.283 28 404 30 435 32 466 34 497 6 6 91.6 7 108 25 1.93 0.321 8 8 123 9 138 10 10 159 12 192 (1300) 325 40 14 1.99 0.341 224 16 258 18 289 20 330 50 22 2.03 0.354 363 24 398 6 6 106 7 124 1400 350 25 2.23 0.398 8 8 142 9 160 d butt joints, welding engineering2005 steel fusion welde-mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis 1000 punishment. (5) significant near miss should-resulting in serious consequences, the pursuit of leadership, along with 500 (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, 100 economic sanctions against them.-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500ing administrative sanctions should 10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concern-accident occurred, the direct punishment 0.5drical steel pressure vessel steel welded specification for construction and2005 vertical cylin-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-JB47302000 8 -2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-field equipment 4 HGJ2222002 industrial pipe welding engineering code for construction and acceptance of -89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-6 10 10 184 12 12 221 40 14 14 2.29 0.421 258 16 16 296 18 18 334 20 20 380 50 22 22 2.33 0.436 420 24 24 458 公称直径曲面高度质量G 直边高度壁厚S 内表面积F 容积V Dg h1 2 h (?) 3 mm mm mm mm mKg 26 498 28 538 30 579 1400 350 50 32 2.33 0.436 629 34 659 36 702 38 743 6 6 121 7 142 25 2.55 0.487 8 8 162 9 183 10 10 209 12 252 (1500) 375 40 14 2.62 0.513 295 16 338 18 380 20 431 50 22 2.67 0.530 475 24 520 6 6 7 25 2.89 0.587 8 8 9 1600 400 10 10 12 12 40 14 14 2.97 0.617 16 16 18 18 accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and 20 20 22 22 24 24 26 50 28 3.02 0.637 30 32 34 36 公称直径曲面高度质量G 直边高度壁厚S 内表面积F 容积V Dg h1 2 h (?) 3 mm mm mm mm mKg 6 153.7 7 179.5 25 3.25 0.70 8 8 205.3 9 231.3 10 10 263.6 12 12 317.0 40 14 3.34 0.734 370.7 16 424.6 18 478.8 20 541.6 1700 425 22 597.1 24 652.9 26 708.9 28 765.1 30 821.5 50 3.39 0.757 32 876.3 34 935.2 36 992.4 38 1049.9 40 1107.6 42 1165.5 6 171.8 7 200.6 25 3.64 0.826 1800 450 8 8 229.6 9 258.5 40 10 10 3.73 0.866 294.3 -mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis 1000 punishment. (5) significant near miss should-resulting in serious consequences, the pursuit of leadership, along with 500 (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, 100 economic sanctions against them.-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500ing administrative sanctions should 10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concern-accident occurred, the direct punishment 0.5drical steel pressure vessel steel welded specification for construction and2005 vertical cylin-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-JB47302000 8 -2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-field equipment 4 HGJ2222002 industrial pipe welding engineering code for construction and acceptance of -89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-d butt joints, welding engineering2005 steel fusion welde8 12 12 353.9 14 14 413.7 16 16 473.9 18 18 534.2 20 20 603.8 22 22 665.6 50 3.78 0.889 24 24 727.7 26 26 790.0 8 255.1 1900 475 25 10 4.05 0.971 319.6 12 384.3 公称直径曲面高度直边高度壁厚S 内表面积F 容积V 质量G Dg h1 h2 (?) 3 mm mm mm mm mKg 14 459.2 16 525.8 1900 475 40 4.14 1.01 18 592.7 20 659.9 8 8 282.1 25 4.48 1.13 9 317.6 10 10 360.7 12 12 433.7 14 14 506.9 40 4.57 1.18 16 16 580.5 2000 500 18 18 654.3 20 20 728.4 22 22 813.7 24 24 889.4 50 4.63 1.20 26 959.2 28 1041.6 6 237.0 8 316.6 10 396.4 (2100) 525 40 5.03 1.36 12 476.6 14 557.1 16 637.8 6 254.5 2200 550 25 8 5.4 1.49 340.0 10 425.7 accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and 12 511.8 14 598.1 16 698.0 40 18 5.5 1.54 786.5 20 875.4 22 976.7 50 5.57 1.58 24 1067.4 10 473 12 568.6 2300 575 40 14 6.00 1.76 664.4 16 760.6 公称直径曲面高度直边高度壁厚S 内表面积F 容积V 质量G Dg h1 2 h (?) 3 mm mm mm mm mKg 6 302.0 7 352.6 25 6.41 1.93 8 403.3 9 454.1 10 513.9 12 617.7 14 721.8 40 6.52 2.00 2400 600 16 826.3 18 931.0 20 1036.2 22 1154.8 24 1261.8 50 26 6.60 2.05 1369.1 28 1476.8 30 1584.8 6 353.5 7 412.7 25 7.50 2.43 8 472.0 9 531.5 2600 650 10 600.6 12 721.8 40 7.63 2.51 14 843.4 16 965.3 2005 steel fusion welde-mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis 1000 punishment. (5) significant near miss should-resulting in serious consequences, the pursuit of leadership, along with 500 (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, 100 economic sanctions against them.-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500ing administrative sanctions should 10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concern-accident occurred, the direct punishment 0.5drical steel pressure vessel steel welded specification for construction and2005 vertical cylin-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-JB47302000 8 -2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-field equipment 4 HGJ2222002 industrial pipe welding engineering code for construction and acceptance of -89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-d butt joints, welding engineering10 18 1087.6 20 1223.2 22 1347.5 24 1472.1 50 7.71 2.56 26 1597.2 28 1722.6 30 1848.4 10 694.1 12 834.0 40 14 8.82 3.12 974.4 2800 700 16 1115.1 18 1256.3 20 1411.7 50 8.91 3.18 22 1555.6 公称直径曲面高度直边高度壁厚S 内表面积F 容积V 质量G Dg h1 h2 (?) 3 mm mm mm mm mKg 24 1692.3 2800 700 50 26 8.91 3.18 1842.9 28 1987.3 10 794.3 12 954.3 40 14 10.1 3.82 1114.9 16 1275.8 18 1437.1 3000 750 20 1613.8 22 1777.4 50 24 10.2 3.89 1941.5 26 2106.1 28 2271.0 12 1087.8 14 1264.8 40 11.5 4.61 16 1447.2 18 1630.1 3200 800 20 1829.3 22 2014.7 50 11.6 4.96 24 2200.5 26 2386.8 3400 850 50 20 13.0 5.60 2058.4 accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and 22 2266.8 24 2475.7 20 2301.0 3600 900 50 22 14.6 6.62 2533.8 24 2767.6 20 2557.0 3800 950 50 22 16.2 7.75 2815.6 24 3074.8 20 3112.3 4000 1000 50 22 17.9 9.02 3398.6 24 3685.4 注:1表中带括号的公称直径应尽量不用. 2.厚度系指成形前的钢板厚度. 3 3.重量按材料比重为7.85kg/cm mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis 1000 punishment. (5) significant near miss should-resulting in serious consequences, the pursuit of leadership, along with 500 (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, 100 economic sanctions against them.-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500ing administrative sanctions should 10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concern-accident occurred, the direct punishment 0.5drical steel pressure vessel steel welded specification for construction and2005 vertical cylin-98 2 GB50128-ing 1 GB1502000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineer-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-JB47302000 8 -2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2004 petrochemical JB/ T4708-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-field equipment 4 HGJ2222002 industrial pipe welding engineering code for construction and acceptance of -89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-Ray lighting and quality rating of 2 GB11345-d butt joints, welding engineering2005 steel fusion welde-12
/
本文档为【椭圆形封头标准】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索