为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

多尼尔红酒资料

2017-11-02 18页 doc 73KB 29阅读

用户头像

is_037433

暂无简介

举报
多尼尔红酒资料多尼尔红酒资料 类型: 红葡萄酒 产 区: 南非 South Africa > 斯特兰德 Stellenbosch 酒 庄: 多尼尔酒庄 酿酒葡萄: 赤霞珠 梅洛 品丽珠 风味风格: 国内参考价: ,500 ,550 关于“ 多尼尔多纳图斯干红葡萄酒(Dornier Donatus Red, Stellenbosch, South Africa) ”的酒款综述 该款酒出自多尼尔酒庄,由赤霞珠、梅洛、西拉、品两丽珠四种葡萄of the accident to develop preventive a...
多尼尔红酒资料
多尼尔红酒资料 类型: 红葡萄酒 产 区: 南非 South Africa > 斯特兰德 Stellenbosch 酒 庄: 多尼尔酒庄 酿酒葡萄: 赤霞珠 梅洛 品丽珠 风味风格: 国内参考价: ,500 ,550 关于“ 多尼尔多纳图斯干红葡萄酒(Dornier Donatus Red, Stellenbosch, South Africa) ”的酒款综述 该款酒出自多尼尔酒庄,由赤霞珠、梅洛、西拉、品两丽珠四种葡萄of the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Department: 7720936 municipal work safety supervision Bureau Tel: 2823733 municipal work safety supervision station Tel: 2825983 first aid of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 酿造而成的。这一款酒酒体轻盈,带有红色樱桃香味,口感紧致,常获各评分机构81分以上的评分,品质相对优秀。 关于“多尼尔多纳图斯干红葡萄酒(Dornier Donatus Red, Stellenbosch, South Africa)”的评分 葡萄酒年份 评分者 分数 评分时间 适饮时间 2007 史蒂芬?坦泽 87/100 2002 史蒂芬?坦泽 88/100 2002 《葡萄酒观察家》 81/100 Dec 31, 2005 关于“多尼尔多纳图斯干红葡萄酒(Dornier Donatus Red, Stellenbosch, South Africa)”的获奖 葡萄酒年份 颁奖组织 获奖时间 奖级 醇鉴世界葡萄酒大赛 提名奖 2007 2010 国际葡萄酒与烈酒大赛 铜奖 2004 2008 醇鉴世界葡萄酒大赛 铜奖 2004 2008 醇鉴世界葡萄酒大赛 银奖 2004 2007 布鲁塞尔国际葡萄酒大赛 银奖 2004 2007 l: 2825983 first aid of the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Department: 7720936 municipal work safety supervision Bureau Tel: 2823733 municipal work safety supervision station Te of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 赤霞珠(Cabernet Sauvignon) 典型香气:黑醋栗、蓝莓、甘草、丁香花蕾和烟熏等。陈年之后还会有菌菇类、干树叶、动物皮毛和矿物的香气。 作为世界上最著名的红葡萄品种,赤霞珠(Cabernet Sauvignon)的历史并不是特别悠久。它和与其种植面积不相上下的梅洛(Merlot)一起堪称世界上种植面积最广泛的两种深色葡萄品种。在… [more] 本酒款产区资料 ABOUT REGION 斯特兰德(Stellenbosch) 斯特兰德(Stellenbosch)产区素有“橡木之城”的称号,是南非首屈一指的葡萄酒产区,被誉为南非的“波尔多”。该产区位于开普省东侧50公里处,这里集中了南非最优秀的葡萄园和大大小小的酒庄,产区内拥有南非几乎所有尊贵的葡萄品种,还有大学城和众多的研究机构,每… [more] rvision Bureau Tel: 2823733 municipal work safety supervision station Tel: 2825983 first aid nt: 7720936 municipal work safety supeof the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Departme of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 酒类型: 红葡萄酒 产 区: 南非 South Africa > 斯特兰德 Stellenbosch 酒 庄: 多尼尔酒庄 酿酒葡萄: 皮诺塔吉 风味风格: 国内参考价: ,350 ,380 more >酒款综述 OVERVIEW l: 2825983 first aid of the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Department: 7720936 municipal work safety supervision Bureau Tel: 2823733 municipal work safety supervision station Te of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 关于“ 多尼尔酒庄皮诺塔吉干红葡萄酒(Dornier Pinotage, Stellenbosch, South Africa) ”的酒款综述 该款酒出自多尼尔酒庄,由皮诺塔吉葡萄酿造而成的。这一款酒酒体 适中,单宁厚实,带有桑椹、李子、橡木、面包的香味,回味悠长。 2009年,史蒂芳评其88分,品质优秀。 more >权威评分 SCORE 关于“多尼尔酒庄皮诺塔吉干红葡萄酒(Dornier Pinotage, Stellenbosch, South Africa)”的评分 葡萄酒年份 评分者 分数 评分时间 适饮时间 2009 史蒂芬?坦泽 88/100 more >权威获奖 AWARDS 关于“多尼尔酒庄皮诺塔吉干红葡萄酒(Dornier Pinotage, Stellenbosch, South Africa)”的获奖记录 葡萄酒年份 颁奖组织 获奖时间 奖级 醇鉴世界葡萄酒大赛 铜奖 2009 2011 德国国际葡萄酒大赛 银奖 2006 2008 银奖(最 国际葡萄酒与烈酒大赛 佳经典2006 2008 葡萄酒) rvision Bureau Tel: 2823733 municipal work safety supervision station Tel: 2825983 first aid nt: 7720936 municipal work safety supeof the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Departme of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 醇鉴世界葡萄酒大赛 铜奖 2006 2008 本酒款酒庄资料 ABOUT WINERY 多尼尔酒庄(Dornier) [more] 本酒款酿酒葡萄资料 ABOUT GRAPE 皮诺塔吉(Pinotage) 典型香气:李子、黑莓、焗香蕉和烧焦橡胶味等。 皮诺塔吉 (Pinotage)一种耐寒的红葡萄品种,该品种是南非对世界酿 酒葡萄史做出的重要贡献。1925年,斯坦陵布什大学 (Stellenbosch University)的葡萄栽培学家阿布拉罕•伊扎克• 贝霍尔德(Abraham Izak Perold)将黑皮诺(Pinot Noir)… [more] 本酒款产区资料 ABOUT REGION 斯特兰德(Stellenbosch) 斯特兰德(Stellenbosch)产区素有“橡木之城”的称号,是南非 首屈一指的葡萄酒产区,被誉为南非的“波尔多”。该产区位于 开普省东侧50公里处,这里集中了南非最优秀的葡萄园和大 大小小的酒庄,产区内拥有南非几乎所有尊贵的葡萄品种,还 有大学城和众多的研究机构,每… [more] l: 2825983 first aid of the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Department: 7720936 municipal work safety supervision Bureau Tel: 2823733 municipal work safety supervision station Te of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 酒类型: 红葡萄酒 产 区: 南非 South Africa > 海岸产区 Coastal Region 酒 庄: 多尼尔酒庄 酿酒葡萄: 红葡萄混酿 风味风格: 美味可口 优雅的 余味悠长 成熟的 柔顺的 结构精良 rvision Bureau Tel: 2823733 municipal work safety supervision station Tel: 2825983 first aid nt: 7720936 municipal work safety supeof the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Departme of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 国内参考价: ,215 ,240 more >酒款综述 OVERVIEW 关于“ 多尼尔可可希尔干红葡萄酒(Dornier Cocoa Hill Red, Coastal Region, South Africa) ”的酒款综述 该款酒出自多尼尔酒庄,由梅洛、西拉和品丽珠三种葡萄酿造而成。 这一款酒酒体厚实,带有樱桃、黑莓、香草和雪松的香味。常获各专 业评分机构87分以上的评分,品质优秀。 more >权威评分 SCORE 关于“多尼尔可可希尔干红葡萄酒(Dornier Cocoa Hill Red, Coastal Region, South Africa)”的评分 葡萄酒年份 评分者 分数 评分时间 适饮时间 2009 史蒂芬?坦泽 87/100 2007 《葡萄酒杂志》 87/100 more >权威获奖 AWARDS 关于“多尼尔可可希尔干红葡萄酒(Dornier Cocoa Hill Red, Coastal Region, South Africa)”的获奖记录 l: 2825983 first aid of the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Department: 7720936 municipal work safety supervision Bureau Tel: 2823733 municipal work safety supervision station Te of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine 奖葡萄酒年份 颁奖组织 获奖时间 级 提 醇鉴世界葡萄酒大赛 名2007 2009 奖 本酒款酒庄资料 ABOUT WINERY 多尼尔酒庄(Dornier) [more] 本酒款酿酒葡萄资料 ABOUT GRAPE 红葡萄混酿(Red Blend) 此品种是一种较少见的葡萄品种,只在为数不多的几个葡萄园 内有种植,其产量十分低,所酿制的葡萄酒也屈指可数。 [more] 本酒款产区资料 ABOUT REGION 海岸产区(Coastal Region) rvision Bureau Tel: 2823733 municipal work safety supervision station Tel: 2825983 first aid nt: 7720936 municipal work safety supeof the accident to develop preventive and corrective measures to prevent accidents from happening again. 8.8.3 telephone company Office Tel: 2814263 (24 hours) Safety Department: 2814828 Safety Departme of focus construction, and guarantee progress plans of smooth implementation for purpose, in engineering implementation Qian, developed detailed of material production, and processing, and stacked, and transport plans, and the jobs construction team into exit adjustment plans. While working out the concrete implementation of these programmes, strictly in accordance with the standards and other regulations, construction management of graphic Sciences, civilization. (2) stress management plans construction of plane scientific management is the key to the science of planning and careful detail specific plans. Formed in the project schedule based on the materials, machinery, labour of advance and retreat, vertical transportation and installation plans to ensure that balanced progress and fully use the plane as a target, work out a realistic plane management to implement the plan. While the plan into a computer, dynamic regulation. (3) stress management plan according to the construction schedule of implementation and adjustment phases publish plane management to implement the plan, including time schedule, responsibility, performance standards, reward and punishment criteria. Plan implementation, not scheduled will be held on a regular basis, after sufficient coordination, research, publish plans to adjust. 2) stress management construction plane managed by the project manager in overall charge, project foreman, material, machine
/
本文档为【多尼尔红酒资料】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索