为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

各种鱼汤的做法

2018-01-15 50页 doc 771KB 10阅读

用户头像

is_219945

暂无简介

举报
各种鱼汤的做法各种鱼汤的做法 鲫鱼豆腐汤 25位厨友加分 平均3.4 +1分 +2分 +3分 +4分 +5分 材料 鲫鱼一条,豆腐若干,盐,姜,葱,鸡精,料酒 做法 1. 鲫鱼一条,收拾干净沥水;豆腐若干(我用的是嫩豆腐,即所谓的石膏豆腐),切成块 或片,撒上盐;老姜切丝,另留下半块留作擦锅用;小葱。葱白段寸段,葱叶切碎。 2.炒锅烧干烧热,用刚才留的那半块姜擦擦后再油烧得开始冒烟时,将鱼丢进去中。怕 溅油的此可以盖上锅盖~ 3.适当转锅,待一面煎好后再煎另一面。 4.烹入料酒,加入葱白段及姜丝,然后加两碗清水,放进豆...
各种鱼汤的做法
各种鱼汤的做法 鲫鱼豆腐汤 25位厨友加分 平均3.4 +1分 +2分 +3分 +4分 +5分 鲫鱼一条,豆腐若干,盐,姜,葱,鸡精,料酒 做法 1. 鲫鱼一条,收拾干净沥水;豆腐若干(我用的是嫩豆腐,即所谓的石膏豆腐),切成块 或片,撒上盐;老姜切丝,另留下半块留作擦锅用;小葱。葱白段寸段,葱叶切碎。 2.炒锅烧干烧热,用刚才留的那半块姜擦擦后再油烧得开始冒烟时,将鱼丢进去中。怕 溅油的此可以盖上锅盖~ 3.适当转锅,待一面煎好后再煎另一面。 4.烹入料酒,加入葱白段及姜丝,然后加两碗清水,放进豆腐大火烧开,加鸡精及适量 盐,因为之前豆腐里已经有盐了,最好是尝尝汤的味道后再酌量添加盐。继续保持大火 状态~(我加的是凉水,水要一次加够,最好不要中途加水;若必须添水,可加热水。) 5.大火煮约10~15分钟,看看,汤已经很白了吧。出锅,装盘撒上少许葱(叶)花即可~ construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 奶白鲫鱼汤 42位厨友加分 平均3.9 +1分 +2分 +3分 +4分 +5分 材料 鲫鱼,嫩豆腐,姜,蒜,盐,香菜,葱 做法 1、鲫鱼去鳞去其内脏和腮,洗净,控干水分; 2、锅内下油,油热后,下入姜蒜炒香; 3、下入鲫鱼转小火反正面煎制; 4、待鱼皮变黄,加适量开水转中火慢炖; 5、十五分钟后,加入嫩豆腐块继续炖5分钟; 6、加盐、香菜、葱花出锅即可。 小诀窍: 1、洗鱼时,腮和鱼肚内层黑膜一定处理干净,否则不利于健康,并且腥味重; 2、一定等锅内油热后下鱼煎,煎鱼时不要急于翻动,注意观察,待底面变黄再翻动,否则 容易破皮,影响美观; 3、可随个人口味喜好添加胡椒粉之类的调味品。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 鲫鱼萝卜汤 6位厨友加分 平均4.3 +1分 +2分 +3分 +4分 +5分 材料 鲫鱼300克,姜片,葱花少许,白萝卜200克,油,料酒3汤勺,开水4-5碗 做法 1.鲫鱼去掉内脏,鳞片,冲洗干净,注意要把鱼肚中的黑色内膜(腥味很重)洗干净.鱼肚抹 点 盐,塞点葱头与姜片在里面。 2.萝卜洗净去皮,切成粗丝。 3.起锅把油烧热后,把鲫鱼放进锅里,两面略煎后,倒进三汤匙的料酒.下姜片,然后加4-5碗 开水,大火煮10分钟左右.然后把萝卜丝放进锅里同煮,煮开后,小火煮20分钟。 4.最后放盐,洒入葱花后熄火.即可盛起来。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 简介 难度:一般简单 时间:1.5个小时 价钱:6元 分量:1人份 口味:微甜鲜美 原料:鲫鱼一条、木瓜150克、姜片3片、牛奶60毫升、盐和白胡椒适量 工具/原料 , 鲫鱼一条、木瓜150克、姜片3片、牛奶60毫升、盐和白胡椒适量 方法/步骤 1. 买来的鲫鱼洗净后在上面涂抹一层料酒或着白酒腌制15分钟。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 2. 木瓜去皮、去籽后切块待用。 3. 锅中放少量的油,趁油不热将腌好的鱼放入,小火慢慢煎至两面微微焦黄。 4. 放入姜片煸炒香。 5. 然后在锅中加入开水,没过大半个鱼身。转大火。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 6、 6. 转大火,等水开后转文火炖20分钟。 7. 20分钟后,加入牛奶,继续炖一个小时。 8. 之后加胡椒,炖10分钟。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 9. 关火前5分钟加盐调味。 注意事项 , 用来煲汤的鱼一定要买新鲜的,请卖鱼的人帮忙去鳞等工作。鱼的个头不要过大, 大了会比较不香。 清洗时要注意鱼腹内的黑色膜,一定清洗干净。 想要煲出奶白的汤,必须加开水。 牛奶可起到去腥、提鲜的作用。如果没有也可以不放。加入牛奶后尽量保持最小火, 不要煮沸的状态。 这道汤有助于伤口愈合,产妇喝还有一定的催奶作用。 *木瓜可选半生熟的,但我个人还是喜欢全熟的。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 笋片鲫鱼汤 主料:鲜鲫鱼1条400克 熟笋片50克 火腿25克 香菇25克 辅料:精盐1克 黄酒5克 生姜 葱段3段 制作步骤: 1、将鲫鱼去鳞、鳃及内脏,洗净。 2、炒锅上火,放油烧热,将鱼放入两面略煎 3、加黄酒、葱、生姜和水烧沸,撇去浮沫,改为小火煮至汤色乳白。 4、用旺火烧,加精盐、火腿、笋片、香菇片烧沸,拣去葱、生姜,盛入碗中。 5、将火腿片、香菇片放在鱼身上即可。 鲫鱼生地土茯苓汤 主料:鲫鱼 猪肉 辅料:茯苓 蜜枣 熟地黄 食盐 姜 水 鲫鱼生地土茯苓汤的做法: 1.鲫鱼去掉里面的黑膜,清洗干净;锅中放入油,先将姜片入锅中煎一下,再放入鲫鱼,煎至两面焦黄 2. 锅中加入4碗水,约1000毫升左右。大火煮开 3. 将煮开的鲫鱼连同汤一起倒入煲锅,放入肉片 4.生地和土茯苓,蜜枣略微清洗后放入煲汤袋,入砂锅 5. 大火煮开后,转为小火慢慢煲1小时左右 [1] 6. 最后撇掉汤中的浮沫,加盐调味即 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 黄豆银耳鲫鱼汤 材料:黄豆75克,水发银耳20克,鲫鱼1条,银杏5克。 黄豆银耳鲫鱼汤 调料:植物油、姜片、盐各适量。 做法: [5] 1)鲫鱼处是干净,黄豆淘净,银杏去壳、去心,洗净;银耳洗净,剪碎。 2)炒锅放植物油烧热,放入鲫鱼略煎,捞出控油。 3)沙锅中放适量清水。烧沸后放入黄豆、银杏、碎银耳、鲫鱼和姜片,再次煮沸,转小火90分钟左右,放盐调味即可。 总结: 鲫鱼略煎即可,这样口感才够鲜嫩。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 芹菜鲫鱼汤怎么做 , 工具/原料 , 备料:鲫鱼一条,芹菜适量,姜适量,蒜头适量 调料:盐,胡椒粉 步骤/方法 1. 一:备洗好所用材料。 2. 二:热锅加油。 3. 三:入姜片爆香。 4. 四:加入鲫鱼煸煎。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 5. 五:煸煎至面干又带点微酥。 6. 六:加入到冷汤锅中,加入姜片及蒜头,大火煮开,煮二十分钟,汤底变白。 7. 七:加入芹菜段一同煮三分钟。 8. 八:加入适量细盐及胡椒既可关火食用。 注意事项 , 鲫鱼汤营养价值 1、鲫鱼所含的蛋白质质优、齐全、易于消化吸收,是肝肾疾病,心脑血管疾病患者 的良好蛋白质来源,常食可增强抗病能力,肝炎、肾炎、高血压、心脏病,慢性支 气管炎等疾病患者可经常食用; 2、鲫鱼有健脾利湿,和中开胃,活血通络、温中下气之功效,对脾胃虚弱、水肿、 溃疡、气管炎、哮喘、糖尿病有很好的滋补食疗作用;产后妇女炖食鲫鱼汤,可补construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 虚通乳; 3、鲫鱼肉嫩味鲜,可做粥、做汤、做菜、做小吃等。尤其适于做汤,鲫鱼汤不但味 香汤鲜,而且具有较强的滋补作用,非常适合中老年人和病后虚弱者食用,也特别 适合产妇食用。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 怎样做鲜莲鲫鱼汤, , 浏览: 868 , | , 更新: 2010-12-01 10:37 , | , 标签: 鲫鱼 0 0 简介 而留香特别喜欢吃鱼虾,虽然家里那两位喜欢吃鱼但怕鱼刺,所以许多鱼做好后刺多的地方总是偶包干的,而在夏日清淡也要搭配好食材,炖些不油腻而清补鸭、鱼、虾等汤菜,增加营养添精神,炖汤的鱼营养都在汤里了,所以多喝汤也就不怕鱼刺了,多喝鱼汤补脑增智的.因此前几天就去买了一条西湖鲫鱼,配上新鲜清凉的西湖莲子排毒的黑木耳,在热天就煮一碗夏日清补滋润肌肤鱼菜-------鲜莲鲫鱼汤 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 工具/原料 , 鲫鱼 , 新鲜莲子 , 黑木耳 , 红枣 步骤/方法 1. 将新鲜鲫鱼刮鳞去鱼内脏后,洗净漓干。 2. 黑木耳、红枣浸泡后,洗净。 3. 新鲜莲子剥壳去莲白衣膜。 4. 热油锅,将鲫鱼煎至两面金黄,加料酒、清开水,大火煮开 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 做西红柿鲫鱼汤时鱼最好别选的太大,西红柿尽量选择熟一点的,炒西红柿的时候要用小火慢慢炒,白胡椒粉是这道菜的关键,但是量无需太多,撒一点点即可去腥提味儿。 工具/原料 , 鲫鱼、西红柿、葱、姜、盐、料酒、白胡椒粉 步骤/方法 1. 鱼背上用刀划上几道。 2. 用料酒均匀的擦一下鱼身。 3. 姜切成片。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 4. 西红柿切成小块。 5. 葱切成葱花。 6. 锅中放适量油,放2个姜片,将鲫鱼放入煎。 7. 鲫鱼两面都煎好后盛出。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 8. 将西红柿块放入锅中翻炒。 9. 要用小火炒,炒至西红柿熟烂。 10. 加入适量清水。 11. 将鱼放入西红柿汤中。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 12. 加入姜片、盐和料酒,煮开。 13. 最后撒适量胡椒粉、葱花即可出锅。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 香菇豆腐鲫鱼汤家常菜菜谱,鲫鱼所含的蛋白质质优、齐全、易于消化吸收,是肝肾疾病,心脑血管疾病患者的良好蛋白质来源,常食可增强抗病能力,肝炎、肾炎、高血压、心脏病,慢性支气管炎等疾病患者可经常食用。 工具/原料 , 香菇豆腐鲫鱼汤的原料:香菇、豆腐、鲫鱼; 香菇豆腐鲫鱼汤的调料:姜、蒜、盐、香油。 步骤/方法 1. 1、鲫鱼收拾干净后,擦干身上的水; 2. 2、锅烧热后,用姜擦一擦,放上少许油,下鲫鱼煎到两面微黄即可; construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 3. 3、倒入凉水,放入姜片、蒜粒大火烧开,待汤色变白,放入香菇,小火炖20分 钟; 4. 4、最后放入豆腐块,在炖10分钟,加盐出锅; construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 5. 5、成品 注意事项 , 将鱼去鳞剖腹洗净后,放入盆中倒一些黄酒,就能除去鱼的腥味,并能使鱼滋味鲜 美。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 好久没去钓鱼了,那天去试一下手感,晕死,一个小时才钓了几条小鲫鱼。看来凡事如逆水行舟,不进则退。小鱼就小鱼吧,遇事随意而安,心情会好很多,小鱼好过没鱼。鱼小,就一锅汤吧,哈哈哈哈。。。。。。 将鱼煎一下,加上蜜枣、姜片、胡萝卜煮上一小时,味道不错。那鱼汤颜色奶白,鲜甜醇滑,OK。 方法/步骤 1. 鲫鱼。 2. 配料。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 3. 煎鲫鱼。 4. 将煎好的鱼换入汤煲。 5. 加入配料文火煮。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 6. 味道鲜美的鱼汤做好了。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 苦瓜鲫鱼汤 工具/原料 , 主料;苦瓜 1根,鲫鱼 1条 辅料;葱姜 适量,盐 克 ,鸡精 2克, 胡椒粉 2克 方法/步骤 1. 将鲫鱼洗净,去鳞,去内脏。 2. 把鲫鱼稍微煎至一下。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 3. 倒入水,加入葱姜烧开。 4. 苦瓜去掉瓤,切成块。 5. 鱼头烧至微白时加入苦瓜块,继续中小火烧至。 6. 烧至20分钟,汤汁浓白,加入盐鸡精 胡椒粉调味即可。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 菜品口味:咸鲜 主要:煮 主要食材:水产类 所需时间:半小时 制作难度:高级 工具/原料 , 食材明细 野鲫鱼500g 花椒粒3g 葱 10g 姜 3g 清水 1000ml 花生油15ml 步骤/方法 1. 1、鲫鱼去鳞,内脏洗净。 2. 2、热锅下油,先放入花椒粒小火煸香。 3. 3、再放入鲫鱼。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on 4. 4、两面都煎一下。 5. 5、再加入清水,葱段,姜片。 6. 6、大火烧开。 7. 7、盖盖转小火炖25分钟关火,出锅前加盐调味即可。。 注意事项 , 小贴士 1,孕妇饮食,不要加味精。 2,煎鲫鱼之前先把花椒粒煸香,可以使熬出来的鱼汤更加鲜美。 3,盐最后放。 construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
/
本文档为【各种鱼汤的做法】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索