为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 交强险费率_保险_买车一条龙

交强险费率_保险_买车一条龙

2018-09-16 18页 doc 55KB 4阅读

用户头像

is_314871

暂无简介

举报
交强险费率_保险_买车一条龙交强险费率_保险_买车一条龙 机动车交通事故责任强制保险基础费率表 金额单位:人民币元 车辆大类 序号 车辆明细分类 保费 一、家庭自用车 1 家庭自用汽车6座以下 1,050 2 家庭自用汽车6座及以上 1,100 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the ...
交强险费率_保险_买车一条龙
交强险费率_保险_买车一条龙 机动车交通事故责任强制保险基础费率表 金额单位:人民币元 车辆大类 序号 车辆明细分类 保费 一、家庭自用车 1 家庭自用汽车6座以下 1,050 2 家庭自用汽车6座及以上 1,100 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 二、非营业客车 3 企业非营业汽车6座以下 1,000 4 企业非营业汽车6-10座 1,190 5 企业非营业汽车10-20座 1,300 6 企业非营业汽车20座以上 1,580 7 机关非营业汽车6座以下 950 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 8 机关非营业汽车6-10座 1,070 9 机关非营业汽车10-20座 1,140 10 机关非营业汽车20座以上 1,320 三、营业客车 11 营业出租租赁6座以下 1,800 12 营业出租租赁6-10座 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld3 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 2,360 13 营业出租租赁10-20座 2,580 14 营业出租租赁20-36座 3,730 15 营业出租租赁36座以上 3,880 16 营业城市公交6-10座 2,250 17 营业城市公交10-20座 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 2,520 18 营业城市公交20-36座 3,270 19 营业城市公交36座以上 4,250 20 营业公路客运6-10座 2,350 21 营业公路客运10-20座 2,620 22 营业公路客运20-36座 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld5 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 3,420 23 营业公路客运36座以上 4,690 四、非营业货车 24 非营业货车2吨以下 1,200 25 非营业货车2-5吨 1,630 26 非营业货车5-10吨 1,750 27 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 非营业货车10吨以上 2,220 五、营业货车 28 营业货车2吨以下 1,850 29 营业货车2-5吨 3,070 30 营业货车5-10吨 3,450 31 营业货车10吨以上 4,480 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld7 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 六、特种车 32 特种车一 6,040 33 特种车二 2,430 34 特种车三 1,320 35 特种车四 5,660 七、摩托车 36 摩托车50CC及以下 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 120 37 摩托车50CC-250CC(含) 180 38 摩托车250CC以上及侧三轮 400 八、拖拉机 39 农用型拖拉机14.7KW及以下 待定 40 农用型拖拉机14.7KW以上 待定 41 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld9 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the 运输型拖拉机14.7KW及以下 待定 42 运输型拖拉机14.7KW以上 待定 1、座位和吨位的分类都按照“含起点不含终点”的原则来解释; 2、特种车一:油罐车、汽罐车、液罐车、冷藏车; 特种车二:用于牵引、清障、清扫、清洁、起重、装卸、升降、搅拌、挖掘、推土等的各种专用机动车; 特种车三:装有固定专用仪器设备从事专业工作的监测、消防、医疗、电视转播等的各种专用机动车; 特种车四:集装箱拖头。 3、挂车根据实际的使用性质并按照对应吨位货车的50%计算。 edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld, including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the edges should be cleaned, after making sure that no defect shall be marked with a marker pen to write down welding near the weld11 , including the slogan of welding, welders, etc. (16) welding Qian Preheat and the welding Hou heat treatment pipe welding Qian Preheat and the welding Hou heat treatment process conditions welding Qian Preheat and the welding Hou heat treatment temperature table project material welding Qian preheat temperature (?) welding Hou heat treatment and the insulation time (?/H) wall thick (mm) temperature (?) wall thick (mm) temperature (?) 20 ? 26 100~200 >36 600~650/1-1.5 15CrMo ? 10 150~200 >10 670~700/1.2-2 Preheat and the heat treatment process in the, Inner and outer wall temperature shall be kept uniform, in order to avoid internal stresses. Preheating before welding and post weld heat treatment, shall measure and record the temperature, temperature measurement locations and number of points are reasonable. Prone to weld delayed crack of steel, post weld heat treatment after welding should be carried out promptly, when not conducting timely post weld heat treatment, should be uniformly heated to 200~300? immediately after welding and insulation and slow cooling, ... 26mm more than 20 steel pipe welding preheating before welding should be carried out, 36mm the above heat treatment after welding should be done. Before welding and heat treatment used oxyacetylene flame heating, heat treatment after welding using special heat treatment after welding equipment. Hardness after heat treatment of welds needed testing. 6.5.4 sides of the dissimilar steel welding when were non-austenitic steel or austenitic steel, alloy content according to lower one side of the base metal or selecting welding material in between. When one of the sides of material when austenitic steels, should select the
/
本文档为【交强险费率_保险_买车一条龙】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索