为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

U盘电脑重新分区及装系统方法

2017-10-07 24页 doc 426KB 26阅读

用户头像

is_098728

暂无简介

举报
U盘电脑重新分区及装系统方法U盘电脑重新分区及装系统方法 准备工具 U盘1个 笔记本和台式机均可。带系统的只装软件和硬盘分区。没有预装系统的电脑需进行系统安装。 1没有预装系统的电脑系统U盘安装方法。 1.1开机之前插入U盘,开机后不停按“F12”键。会出现联想电脑启动项选择界面。请选择U盘进行启动。,如图, 根据U盘类型不同,选择不同的U盘名称启动。 2.1进入U盘启动后选择进入WINPE系统。,如图, slightly lowered the field side, the steam end rotor weight transfer...
U盘电脑重新分区及装系统方法
U盘电脑重新分区及装系统方法 准备工具 U盘1个 笔记本和台式机均可。带系统的只装软件和硬盘分区。没有预装系统的电脑需进行系统安装。 1没有预装系统的电脑系统U盘安装方法。 1.1开机之前插入U盘,开机后不停按“F12”键。会出现联想电脑启动项选择界面。请选择U盘进行启动。,如图, 根据U盘类型不同,选择不同的U盘名称启动。 2.1进入U盘启动后选择进入WINPE系统。,如图, slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 无论什么U盘系统,第一项都是运行WINPE系统选项。选择进入WINPE系统,等待进入WINPE系统。 3.1进入WINPE系统后进行电脑分区。,装过系统分区是好的,可不用分区。直接装系统就可, 分区工具进入如下图。 开始——程序——磁盘光盘工具——PM磁盘分区工具——点击进入 PM磁盘分区工具详解 进入之后先删除不要的分区。但要特别注意不要删除联想隐藏分区。 删除不要的分区之在进磁盘分区工作:如图下 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 注意:联想电脑里会出现多个分区,需要找到要分区的分区进行分区。一般为容量比较大的分区为 需要分区的分区。 注意:根据系统要求不同,XP分20G,20000MB就好。WIN7分50G,50000MB。如果是现 在装XP又会换成WIN7的用WIN7的方法分主分区。 注意:我们无论XP戒WIN7“系统类型”里面都选择”NTFS”分区。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 注意:我们电脑一般都是分4个分区。前面我们已经分了一个主分区,所以后逻辑分区我们只要 分3个分区就可以。根据硬盘的容量大小进行分配。容量小的硬盘逻辑分区在分一个戒两个都 行。 逻辑分区的“系统类型”一样的也是 选择”NTFS”格式来分。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 注意:我们一般要分的分区都是显示“自由分区”。只要是自由分,我们都可进行分区。 硬盘分区构架:先分主分区,主分区要设置活动,——分扩展分区,不用分大小,——逻辑分区进行分区,设置逻辑分区大小,一般逻辑分区只需分三个分区,加主分区是4个分区,,——分好之后应用——应用完毕退出。 4.1做完分区工作就系统安装 1选择“手工兊隆安装”如图下 点击进入 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 这个界面示你进入了兊隆界面。点击”OK”按钮。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 注意:我们要选择我们U盘里的系统文件。在“LOOK JI:”右边的下三角图标,选择U盘的盘名,选择之后点击进入。系统文件一般都是这样。XXX.GHO文件名,带黄色图标就是。 注意:点系统文件,系统文件就是XXX.GHO文件,后会出现上面的状态。进行之后要先装系统的分区,因为我们是用U盘装系统,所以会出现两个分区,而上图只有一个,,一个是电脑的硬盘算一个分区,U盘也会算一个分区。所以我们要选择电脑的硬盘分区,千万不要选择U盘分区。选择好了之后点击OK按钮。会进入如下图 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 注意:选择进入到电脑硬盘分区里之后,会看到前面我们为电脑分区的分区。那系统要装在哪个分 区里面呢?当然是装在我们分的“主要分区“里面。怎么识别主分区了,一般是排列的第一个 区就是主分区,也可以在后面”Size“里看分区大小来确定,应该还记得我们主分区分的大小吧。 20G会在这里显示20000。选择好主分区之后点击OK按钮。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 点OK按钮出现如上图框框,请点YES进行操作。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 点YES之后就在进行系统安装,安装完成之后出现 电脑重启之后就表示系统安装完成了3分之2.后面的步骤可以不用操作,直到系统安装完成,直接进入到桌面。 5.系统安装完成进入桌面后,就要进行电脑驱动和软件安装。 6.驱动和软件安装完成之后在进行系统优化和检查,如没有问就进行最后一步。 7.最后一步电脑没问题就进行电脑备份工作。在装机打包送给客户检查。 希望销售员先按此方法在电脑上自己试着装一下,仔细看一下。在实际操作中有问题在问技术员。这样可以加深装系统的印象。 徐冲 2011.3.21 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances,
/
本文档为【U盘电脑重新分区及装系统方法】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索