工程造价计取费表11月8号

2017-10-11 10页 doc 39KB 14阅读

用户头像

is_471618

暂无简介

举报
工程造价计取费表11月8号工程造价计取费表11月8号 工程造价计取费表 A 定额直接费 36491.49 28033.50 B 合计工程直接费 64524.99 1 组织措施费 4.75% x B 3064.93 2 企业管理费 4.95% x B 3193.98 3 利润 5.15% x B 3323.03 4 B+1+2+3之和 74106.93 5 规费 6.35%x 4项 4705.79 6 A+5之和计取税金 6.46% 5091.30 7 A+5+6工程造价 83904.02 8 大写:捌万叁仟玖佰零肆元零贰分 accident oc...
工程造价计取费表11月8号
工程造价计取费11月8号 工程造价计取费表 A 定额直接费 36491.49 28033.50 B 合计工程直接费 64524.99 1 组织措施费 4.75% x B 3064.93 2 企业管理费 4.95% x B 3193.98 3 利润 5.15% x B 3323.03 4 B+1+2+3之和 74106.93 5 规费 6.35%x 4项 4705.79 6 A+5之和计取税金 6.46% 5091.30 7 A+5+6工程造价 83904.02 8 大写:捌万叁仟玖佰零肆元零贰分 accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welding specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation 计材 DN273变159大小头 个 2 208.00 416.00 C8-890 DN159管挂架安装 个 10 14.19 119.37 141.90 1193.70 C8-891 DN219管挂架安装 个 9 14.90 159.72 134.10 1437.48 C8-892 DN325管挂架安装 个 6 16.80 209.01 100.80 1254.06 C8-707 DN200PN16 截止阀安装 个 4 1210.00 569.46 4840.00 2277.84 氮气管部分 C8-13 氮气管DN32安装 10m 10.9 265.00 92.98 2888.50 1013.48 C8-12 氮气管DN25安装 10m 0.6 141.40 73.95 84.84 44.37 C8-17 氮气管DN69安装 10m 2.5 486.20 99.82 1215.50 249.55 C8-509 DN50PN25法兰连接安装 片 1 126.09 126.09 C8-695 DN20PN25球阀安装 个 11 90.50 43.58 995.50 479.38 C8-699 DN32PN25截止阀安装 个 4 98.4 92.02 393.60 368.08 C8-696 DN32法兰连接安装 片 8 62.00 59.34 496.00 474.72 C8-701 DN50PN25截止阀安装 个 1 65.46 121.30 65.46 121.30 本页小计 11772.20 9040.05 accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welding specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation C8-19 焊接钢管DN15连接安装 10m 7 58.80 30.69 411.60 214.83 C8-21 焊接钢管DN25连接安装 10m 8 113.70 34.61 909.60 276.88 C8-684 截止阀DN15安装 个 4 17.20 8.92 68.80 35.68 煤气管部分 C8-54 煤气管DN159安装 10m 2.6 1586.00 605.08 4123.60 1573.20 C8-55 煤气管DN219安装 10m 3.2 2013.00 525.00 6441.60 1680.00 C8-57 煤气管DN325安装 10m 2.3 3439.70 1042.81 7911.30 2398.46 计材 DN325变219大小头 个 4 265.70 1062.80 C8-508 法兰DN32连接 片 8 108.93 871.44 计材 DN425变325大小头 个 1 385.40 385.40 C8-519 DN425PN16法兰连接 片 1 1625.10 1625.10 C8-516 DN219PN16法兰连接 片 8 865.51 6924.08 C8-695 DN25PN16球阀连接 个 3 23.80 43.56 71.4 130.68 accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welding specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation C8-696 DN32PN16截止阀安装 个 4 62.00 59.34 248.00 237.36 本页小计 21634.11 15967.71 除尘部分 C8-13 DN30镀锌管安装 10m 2 253.00 92.80 506.00 185.96 C8-12 DN50镀锌管安装 10m 2.2 284..40 122.93 625.68 270.44 C8-17 DN75镀锌管安装 10m 2 486.00 99.82 972.00 199.64 C8-508 DN30PN16法兰连接 片 8 108.93 871.44 C8-511 DN75PN16法兰连接 片 4 234.52 938.08 C8-699 DN30截止阀安装 个 4 62.00 92.00 248.00 368.08 C8-703 DN75PN16蝶阀安装 个 1 733.50 192.10 733.50 192.10 accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welding specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation 本页小计 3085.18 3025.74 合计定额直接费 36491.49 28033.50 工程量汇总 第120号单 5月13日 DN32PN16截止阀 4个 焊接钢管DN25 80m DN32法兰 8片 焊接钢管DN15 70m DN159管托架 10个 截止阀DN15 4个 DN325焊接管 23m 变更补充单 6月21日 DN219焊接 6m 煤气管部分: DN425变325大小头 1个 DN219焊管 18+8 ?=26m DN425变PN16法兰 1片 DN325变219大小头 2+1 ?=3个 DN325 弯头 4个 accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welding specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation DN25N16球阀 2+1 ?=3个 DN325 管托架 6个 DN219管托架 6+3 ?=9个 DN200PN16截止阀 4个 DN219 弯头 2个 DN325变219大小头 1个 DN159 无缝管 26m DN219PN16法兰 8个 DN159弯头 12个 DN325变219大小头 1个 PN273变159大小头 2个 DN219弯头 4个 氮气管、压空管 三次除尘风机油箱冷除水: DN32无缝管 14+10+7+60+18 ?=109m DN75镀锌管 20m DN32弯头 4+2+2+6+6 ?=20 个 DN75PN16蝶阀 1个 DN20PN25球阀 2+2+1+2+4 ?=11个 DN75PN16法兰 4片 DN32PN25截止阀 1+2+1 ?=4个 DN75 弯头 4个 DN32PN25法兰 2+4+2 ?=8片 LF除尘风机冷除水: DN69 无缝 25m DN50 镀锌管 22m DN25 无缝 6m DN30 镀锌管 20m DN69 弯头 3个 DN50 弯头 6个 DN50PN25截止阀 1个 DN30 弯头 4个 accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welding specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation DN50PN25 法兰 1片 DN30PN16 截止阀 4个 DN30PN16 法兰 8片 accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welding specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009 mechanical equipment installation
/
本文档为【工程造价计取费表11月8号】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
热门搜索

历史搜索

    清空历史搜索