为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

摩托车化油器清洗

2017-09-21 50页 doc 1MB 56阅读

用户头像

is_037433

暂无简介

举报
摩托车化油器清洗摩托车化油器清洗 2010-06-24 09:15 细说化油器(非常实用的转贴) 贴的开始前先来玩个小时候玩过的游戏,把一根细管插入水中,往露出水面的管口水平吹气, 很奇怪,竟然可以吹出水。等学到物理时才明白,管口经过吹气,压力相对管外要小,水自 然是往压力小的地方跑。这也是化油器的工作原理。 如下图,本来想用嘴吹的,但怕你们看到我性感的小嘴会引起轰动,所以用空气枪代替。 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 ...
摩托车化油器清洗
摩托车化油器清洗 2010-06-24 09:15 细说化油器(非常实用的转贴) 贴的开始前先来玩个小时候玩过的游戏,把一根细管插入水中,往露出水面的管口水平吹气, 很奇怪,竟然可以吹出水。等学到物理时才明白,管口经过吹气,压力相对管外要小,水自 然是往压力小的地方跑。这也是化油器的工作原理。 如下图,本来想用嘴吹的,但怕你们看到我性感的小嘴会引起轰动,所以用空气枪代替。 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 第一个拆的是最常见的化油器,很多CG125都用.甚至小链机也用. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拆化油器前先拆下火花塞.看火花塞的燃烧颜色可以大概知道这台发动机的运转情况. 要是烧得太黑,说明混合气体太浓.也就是是进到气缸的空气太少.这时很多人会第一时间说 调整化油器.其实很多情况下是空气滤芯堵了.要是火花塞又湿又黑.这时候就算你把化油器 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 调烂也没用.因为问题出来中缸和活塞环上. 象这个火花塞烧得就很好.有谁不服拿出来比比.有了这样的颜色我自然省心很多,把化 油器拆开简单清洗一下就OK了. 第一个拆的是最常见的化油器,很多CG125都用.甚至小链机也用. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拆化油器前先拆下火花塞.看火花塞的燃烧颜色可以大概知道这台发动机的运转情况.要 是烧得太黑,说明混合气体 太浓.也就是是进到气缸的空气太少.这时很多人会第一时间说调整化油器.其实很多情况 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 下是空气滤芯堵了.要是火 花塞又湿又黑.这时候就算你把化油器调烂也没用.因为问题出来中缸和活塞环上. 象这个火花塞烧得就很好.有谁不服拿出来比比.有了这样的颜色我自然省心很多,把化油 器拆开简单清洗一下 就OK了. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 用电筒往里面照,也可以了解很多关于发动机的情况.可以看到活塞顶的积碳,气门密封边磨 损的程度. 外面的油迹是缸盖漏下来的. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 交代清楚就开始拆了,先拧松空滤接口锣钉. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拆下这两颗锣母后,往后一拉.化油器就算拆下了. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 倔篇?那来那么多日本制造哦.不过看做工还不错,再想起火花塞漂亮的颜色.就算它是日本 制造的吧 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 图中画圈是化油器的通气孔,叫它平衡孔也行,作用是平衡化油器里面的空气.不至于造成真 空.导致气油进不到气缸.这个孔应该有根油管套住的.这样脏东西想进去就难些.可有些车 这条油管太长,离地面很近.就很容易被泥土堵塞,干的时候勉强有空气进去,可一下雨就会 完全堵塞.这时候不死火就怪了.可是找到修理店,修理工只会想到电路.有多少个会到是这 条管堵塞了的? summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拧开这个盖子时,由于里面有弹簧,所以边拧边往下压. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 节气阀.我们喜欢叫它水桶. 下次你要是去买节气阀.就直接说买水桶.售货员会认为你是修车高手的. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拆出油门线. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拆化油器.我觉得最难就是拆化油器上的锣钉了.小小的.稍不小心就会拧花.再加上有些人 怕漏油,拼了命上紧.估计吃奶的力气都用上了.所以拆这些锣钉的时候第一要用好的工具. 以前我为了拆这些锣钉,专门买了进口工具.可惜啊, 都被人借走了. 第二用力要均匀,边拧边用力下压.这些只用文字就很难说清楚了.多动手就会熟练.记得以 前我收的学徒,第一个月只教他们怎么拧锣丝 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 这时候就可以揭开油底壳. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 不算很脏,我以前见过有半杯油泥的. 要避免有油泥,1加装汽车用的过滤器.2时不时拧开放油锣钉放掉脏油. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 1:主喷嘴.2:怠速喷嘴.3:混合比调整锣钉. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 先拆浮子,这个销子很松,轻轻一顶就出来了.要是碰到很紧的那种.除非是非拆不可,否则我 劝你还是不拆为好. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 画圈是浮子的舌片.是调油面高低的.印象中也就调过几次. 往下压舌片是把油面调低.反之调高.我在后面在详细说明. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 三个角度看浮子和三角针阀. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 三角针阀.画圈是它的工作面.工作面损伤会导致化油器漏油. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 再说一次油面的调整方法. 往下压舌片,舌片和三角针阀距离就近了.油面相应就低. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 这个方向压舌片是调高油面. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拆下主喷嘴.它是铜做的.拆的时候要小心. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 主喷嘴上的主量孔.去过西藏的都知道,进入高原由于空气稀薄,要调稀混合气.花个五块钱,在主量空里 面塞根铜丝, 减少的汽油进入也就调稀了混合比.这下看完贴.你们可以省下五块请我吃东西了. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 主喷嘴上的小孔叫做发泡孔.是为了让汽油和空气更好的融合. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拆怠速管.要是怠速不稳.很有可能是它堵塞了. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 第一次看见那么短的怠速喷嘴. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 肉眼就可以看到是否堵塞. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拧出混合比锣钉前.先把它轻轻拧到底.并记下所需的圈数,以便装回去的时候按记下的圈数 柠回.每个化油器混合比锣钉都有自己出厂的圈数,有些是一圈半,两圈半的最多.现在 拆的是五圈,真是很少见.为什么要有混合比调整螺钉呢?化油器用久后,在汽油的不短冲刷 下,主量孔,,油道.等等附件等会越用越大,油针越用越小.导致进油量会变多.混合比就会变 浓.这时候就要调整混合比.要不增加进入的空气量.要不减少进入的汽油量. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 混合比调整锣钉.注意是有个O形圈的.要是忘了装,会导致怠速不稳. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 我被人问得最多的是某某化油器的混合比顺时针是调浓还是调稀啊? 我的回答常常是不懂哦.原因是经手的化油器太多,都搞乱了. 下面我较你们一个方法. 先要搞清楚混合比锣钉是调节空气还是调节汽油的.入图所示,我用手指堵住了混合比锣钉的针孔,然后用清洗剂往里面喷,可以看到画圈的主喷孔和怠速孔有清洗剂流出.这可以说明混合比调节孔是通到油底壳的.也就是说这个化油器的混合比锣钉是调油的.往里面拧混合比锣钉,进入的汽油就会减少.混合比也就是稀.反之拧出就是变浓. 不懂这样的描述你们能看懂吗?后面有介绍调空气的. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 油针靠这个卡簧固定.轻轻往上顶油针,卡簧和油针就一起出来了. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 油针和主喷嘴.化油器上的配件就属他们磨损最多. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 主油针的调整,标准的时候在中间,往上调一格混合比是变稀.往下调一格混合比变浓. 那天有个朋友说他买的二手车很耗油,我拆开化油器一看.好家伙.油针的卡簧在最下面一 格,怪不得"一触即发".再看火花塞,烧得黑黑的.我赶紧帮他调回中间. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 有化油器清洗剂.洗起来就简单多了.看见脏的地方就喷喷.见孔就喷喷.记住一点.喷完只有 必需要用高压空气把清洗剂吹掉.免得会腐蚀堵塞化油器喷孔.切记.切记. 洗干净后就可以组装了.先装主喷嘴. 这个小接口被我不小心吹到地上,差点找不到. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 先用手拧紧 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拧入主量孔. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拧入怠速喷嘴. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 拧入混合比调整螺丝. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 图中所示是混合比螺丝拧到底 . 拧到底后按原来记的圈数退出. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 装入浮子和三角针阀. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 盖入油底壳,先不要拧螺丝.检查下油面高度. 插入油管放油进入化油器. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 大约一分钟之后,关闭油开关.按图所示拿走化油器的上部分. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 这就是标准的油面高度了. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 装节气阀. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 画圈的点是长期和怠速调整螺钉相碰造成的. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 装的时候这个缺口要和怠速调整螺丝一条直线. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 由于冷车起动时要较浓的混合比.所以化油器上都设计了风门.只不过很多人不喜欢用.觉得 冷车打风门是不正常的. 跑到维修部一说.人家为了迎合你,估计会把混合比调浓.冷车起动是解决问题了.可低速,中 速.高速的混合比呢?油耗 summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 增加不说.说不定高速也上不去了.所以冷车起动困难时请拉下风门.这里我并没说冷车不拉风门能起动就一定代 混合比过浓. 把混合比变浓一是减少空气进入,二是增加汽油的进入.这个化油器很明显是减少空气进入的. 全闭状态. 半开状态. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 全开状态. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into 节气门全开时油针的状况. summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into summer of masonry construction, brick requires sufficient moist. 8.6.2.6 you must take the following measures to concrete construction in summer high temperature impact on concrete a. hardening speed up, vibrating difficulties reduced bleeding, fast drying, easy to crack (plastic), high early strength, fast early hydration heat, less cooling, temperature increases rapidly, due to temperature difference cracks. B. pouring daytime high temperatures, due to the high temperature effect of concrete strength, stability, in varying degrees, on mixing processes, perfusion vibration and moisture conservation, effective measures should be taken. 2) main measures taken by a. temperature control the water temperature in your standard mix proportion of concrete 2 degrees, the concrete temperature 0.5 degrees. B. with the controlled addition of retarder agent can reduce the effects of concrete under high temperature, but make some performance degradation of concrete, so when you are using additives must be implemented upon approval by the supervising engineer. C. time control suitable for work at night, should seek to reduce the mixing time and shipping time at high temperatures. D. strengthen the conservation and high temperatures after pouring in the early days of continuous water conservation to prevent surface drying and covering thin-film wet grass bag to make it moist State in 24 hours. 8.6.3 8.6.3.1 winter construction measures in winter construction preparation 1) required winter construction materials, equipment, planning ahead of time comes into
/
本文档为【摩托车化油器清洗】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索