MTK手机查看芯片型号
MTK手机查看芯片型号的简单方法
很多国产机的用户想知道自己的MTK手机CPU是用的什么芯片型号~如MT6225 MT6230.......这里告诉你个简单的判断方法:
手机用数据线连接电脑后,电脑的右下任务栏会跳出硬件图标:双击安全删除硬件那个图标
然后点属性
看到了吧~
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and