为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

2013高考古诗文默写练习

2017-10-07 26页 doc 88KB 11阅读

用户头像

is_079973

暂无简介

举报
2013高考古诗文默写练习2013高考古诗文默写练习 detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; ...
2013高考古诗文默写练习
2013高考古诗文默写练习 detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety 1.亲贤臣,远小人,_________________________;亲小人,远贤臣,______________________ (诸葛亮《出师》) 2.宫中府中,俱为一体, ,不宜异同。 (诸葛亮《出师表》) 3.沧海月明珠有泪, 。此情可待成追忆, 。 (李商隐《锦瑟》) 4.地崩山摧壮士死,____________________。 (李白《蜀道难》) 5.风急天高猿啸哀,_____________________。无边落木萧萧下, 。 (杜甫《登高》) 6.且夫天地之间,_______________,苟非吾之所有,_________________。 (苏轼《赤壁赋》) 淇水汤汤,渐车帷裳, ,士贰其行。 ,二三其德, 7. (《诗经 氓》) 8.长桥卧波, ,复道行空, , ,不知西东。 (杜牧《阿房宫赋》) 9.民生各有所乐兮,______________。虽体解吾犹未变兮,________________?(屈原《离骚》) 10.鹏之徒于南冥也,_________________鹏之徒于南冥也,_______________,_______________,去以六月息者也。 (《庄子?逍遥游》) 11.秦爱纷奢,人亦念其家。 , ,(杜牧《阿房宫赋》) 12.高余冠之岌岌兮,_______________。芳与泽其杂糅兮,________________(屈原《离骚》) 13. , ,人道寄奴曾住。 (辛弃疾《永遇乐•京口北固亭怀古》) 14.屈心而抑志兮, , 。固前圣之所厚。 (屈原《离骚》) 15.但见悲鸟号古木,雄飞雌从绕林间。 , 。(李白《蜀道难》 detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety 16.锦瑟无端五十弦, 。 ,望帝春心托杜鹃。 (李商隐《锦瑟》) 17.宫中府中,俱为一体, , 。 (诸葛亮《出师表》) 18.怀民亦未寝,相与步于中庭, , ,盖竹柏影也。 (苏轼《记承天寺夜游》) 19.小知不及大知,小年不及大年。奚以知其然也, , ,此小年也。 (庄子《逍遥游》) 20.积善成德,而神明自得, 。(《荀子?劝学》) 21.剑阁峥嵘而崔嵬,一夫当关, 。(李白《蜀道难》) 22._____________,_____________,闻道有先后,术业有专攻,如是而已((韩愈《师说》) 23.爱其子, ,于其身也, ,惑矣~(韩愈《师说》) 24.使天下之人, , ,日益骄固。(杜牧《阿房宫赋》) 25. ,只是朱颜改(问君能有几多愁, (《虞美人》) 26.千古江山,英雄无觅孙仲谋处。 , 。 (辛弃疾《永遇乐?京口北固亭怀古》) 27.千呼万唤始出来, 。转轴拨弦三两声, 。(白居易《琵琶行》) 1 construction organization name project name the construction site construction requirements of security technical-2-... 4 n be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction siteoncentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance canot cswitch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and can f walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protectionion ol lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formatthe coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificia reseeof groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not fo or processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the eventsoil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager flayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by-layer the table in accordance with the construction plan operations; Manual excavation should be from the top down,2 construction organization name project name the construction site construction requirements of security technical cards on -2-reference tables) 4down (-in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the lowuction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form constrce or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the n be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptaney caset 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before th ge of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you mustiner's lamp or the safety volta1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety m-special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500have tection and record, consistent with requirements to lower production; Excavation pile construction of excavation process mustonal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas deequipment, gas masks, accessories, materials and pers ? detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety 高考古诗文默写练习 1.假舆马者,非利足也,__________;假舟楫者,非能水也, ___________。(荀子《劝学》) 2. ,惊涛拍岸,卷起千堆雪。江山如画, 。 (苏轼《念奴娇•赤壁怀古》) 3.若夫日出而林霏开, ,晦明变化者, 。(欧阳修《醉翁亭记》) 4.西当太白有鸟道, 。地崩山摧壮士死, 。(李白《蜀道难》) 5.几处早莺争暖树,___________________,乱花渐欲迷人眼,______________________。 (白居易《钱塘湖春行》) 6.况吾与子渔樵于江渚之上,_______________________,驾一叶之扁舟,举匏樽以相属。寄蜉蝣于天地,______________________。 (苏轼《赤壁赋》) 7.鹏之徒于南冥也, , ,去以六月息者也。(《庄子?逍遥游》) 8. ,夜泊秦淮近酒家。_______________________,隔江犹唱后庭花。 (杜牧《泊秦淮》) 9.盖将自其变着而观之,____________;自其不变者而观之,______________。而又何羡乎~ (苏轼《赤壁赋》) 10.怀旧空吟闻笛赋,______________________。_____________________,病树前头万木春。 (刘禹锡《酬乐天扬州初逢席上见赠》) 11.清风徐来,__________________。_________________,________________,歌窈窕之章。 (苏轼《赤壁赋》) 12.悟以往之不谏,___________________________。 (陶渊明《归去来兮辞》) 13.转轴拨弦三两声,___________________。 (白居易《琵琶行》) 14.____________________ ,亦使后人而复哀后人也。 (杜牧《阿房宫赋》) 15.出师未捷身先死,________________________。 (杜甫《蜀相》) all equipment, facilities, safety ofthe table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation 1 construction organization name project name the construction site construction requirements of security technical cards on -2-4e ... an be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction sitconcentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance cannot n switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cof walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protectioation ial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the forme the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificforeset of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the evensoil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by-, layerthe table in accordance with the construction plan operations; Manual excavation should be from the top down2 construction organization name project name the construction site construction requirements of security technical cards on -2-(reference tables) 4down -in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low ruction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan formconst nce or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted thean be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptathey ct set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before age of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you musiner's lamp or the safety volt1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety m-special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500 st havedetection and record, consistent with requirements to lower production; Excavation pile construction of excavation process mu ? detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety 16.身无彩凤双飞翼,________________________。 (李商隐《无题》) 17.日月之行,若出其中;________________, 。 (曹操《观沧海》) 18. ,奚惆怅而独悲?_____________________,知来者之可追。 (陶渊明《归去采兮辞》) 19.海内存知己,____________。无为在歧路,_____________。(王勃《送杜少府之任蜀州》) 20.句读之不知,__________,或师焉,或不焉,__________,吾未见其明也。(韩愈《师说》) 21.客亦知夫水与月乎,逝者如斯,________________;盈虚者如彼,_______________。 (苏轼《赤壁赋》) 22.风急天高猿啸哀,渚清沙白鸟飞回。____________,______________。(杜甫《登高》) (23) ,似诉平生不得意。 , 。(白居易《琵琶行》) (24) ,然后天梯石栈相钩连。 ,下有冲波逆折之回川。(李白《蜀道难》) (25) ,自前世而固然。 , , (屈原《离骚》) (26) ,以望复关。 ,泣涕涟涟。既见复关, 。尔卜尔筮,体无咎言。 , 。 (《诗经?卫风?氓》) (27)其声呜呜然, , ,余音袅袅, 。 , 。 (苏轼《赤壁赋》) 1 construction organization name project name the construction site construction requirements of security technical-2-... 4 n be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction siteoncentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance canot conal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas deswitch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and can f walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protectionion ol lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formatthe coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificia reseeof groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foequipment, gas masks, accessories, materials and pers or processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the eventsoil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager flayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by-layer the table in accordance with the construction plan operations; Manual excavation should be from the top down,2 construction organization name project name the construction site construction requirements of security technical cards on -2-reference tables) 4down (-in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the lowuction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form constrce or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the n be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptaney caset 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before th ge of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you mustiner's lamp or the safety volta1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety m-special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500have tection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must ? detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety 高考古诗文默写练习 (1)故木受绳则直, ,君子博学而日参省乎已, 。 (2)肴核既尽, 。 ,不知东方之既白。 (3) ,人亦念其家。 , , (4)千古江山,英雄无觅孙仲谋处。 , 。(辛弃疾《永遇乐?京口北固亭怀古》) (5)故不积跬步, ;不积小流,无以成江海。 (荀子《劝学》) (6) , ,道之所存,师之所存也。 (7)寄蜉蝣于天地, 。 (苏轼《赤壁赋》) (8)想当年,金戈铁马, 。 (辛弃疾《永遇乐?京口北固亭怀古》) (9) ,驾一叶之扁舟, ,寄蜉蝣于天地。(苏轼《赤壁赋》) (10) , 。飞湍瀑流争喧豗,砯崖转石万壑雷。 (11) ____________________,不能十步。____________________,功在不舍。 (荀子《劝学》) (12)_______________,_______________,举酒属客,诵明月之诗,________________。 (13)西当太白有鸟道,__________________。地崩山摧壮土死,___________________。 (14) , , ,其视下也,亦若是则已矣。(庄子《逍遥游》) (15)曲终收拨当心画, 。东船西舫悄无言, 。 (16)万里悲秋常作客, 。 ,潦倒新停浊酒杯。 (17) ,只是朱颜改(问君能有几多愁, 。 (18)假舆马者,非利足也,_______________;假舟楫者,非能水也,___________________。 (19) ______ ,百年多病独登台。 ______ ,潦倒新停浊酒杯。 all equipment, facilities, safety ofthe table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation 1 construction organization name project name the construction site construction requirements of security technical cards on -2-4e ... an be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction sitconcentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance cannot n switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cof walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protectioation ial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the forme the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificforeset of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the evensoil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by-, layerthe table in accordance with the construction plan operations; Manual excavation should be from the top down2 construction organization name project name the construction site construction requirements of security technical cards on -2-(reference tables) 4down -in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low ruction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan formconst nce or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted thean be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptathey ct set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before age of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you musiner's lamp or the safety volt1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety m-special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500 st havedetection and record, consistent with requirements to lower production; Excavation pile construction of excavation process mu ? detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction site ... 4-2-1 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety (20)庄生晓梦迷蝴蝶, 。沧海月明珠有泪, 。 (21)覆杯水于坳堂之上, ;置杯焉则胶, 。 (22) ,夜泊秦淮近酒家。_______________________,隔江犹唱后庭花。(杜牧《泊秦淮》) (23)、积善成德,而神明自得, 。 (《荀子?劝学》) (24)剑阁峥嵘而崔嵬,一夫当关, 。 (李白《蜀道难》)(25) ,非能水也, 。君子生非异也, 。 (26)纷纷暮雪下辕门, 。轮台东门送君去, 。 (27)月出于东山之上, 。白露横江, 。 ,凌万顷之茫然。(苏轼《赤壁赋》) 28)醉里挑灯看剑,梦回吹角连营。 , ,沙场秋( 点兵。(辛弃疾《破阵子》) (29)风急天高猿啸哀, 。 (杜甫《登高》) (30) ,孰能无惑, (韩愈《师说》) (31) ,郁郁青青。 (范仲淹《岳阳楼记》) (32)浩荡离愁白日斜, 。 (龚自珍《己亥杂诗》) 1 construction organization name project name the construction site construction requirements of security technical-2-... 4 n be carried out operations, acceptance or unqualified acceptance not made the next processes work; 10, the construction siteoncentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance canot cswitch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and can f walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protectionion ol lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formatthe coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificia reseeof groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not fo or processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the eventsoil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager flayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by-layer the table in accordance with the construction plan operations; Manual excavation should be from the top down,2 construction organization name project name the construction site construction requirements of security technical cards on -2-reference tables) 4down (-in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the lowuction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form constrce or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the n be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptaney caset 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before th ge of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you mustiner's lamp or the safety volta1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety m-special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500have tection and record, consistent with requirements to lower production; Excavation pile construction of excavation process mustonal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas deequipment, gas masks, accessories, materials and pers ?
/
本文档为【2013高考古诗文默写练习】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索