为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

HT2571接地电阻测量仪

2017-09-27 12页 doc 73KB 4阅读

用户头像

is_633423

暂无简介

举报
HT2571接地电阻测量仪HT2571接地电阻测量仪 HT2571接地电阻测量仪 一、产品介绍 1、工作原理 本表摒弃传统的人工手摇发电工作方式,采用先进的中大规模集成电路,应用DC/AC变换技术将三端钮、四端钮测量方式合并为一种机型的新型接地电阻测量仪。 工作原理为由机内DC/AC变换器将直流变为交流的低频恒流,经过辅助接地极C和被测物E组成回路,被测物上产生交流压降,经辅助接地极P送入交流放大器放大,再经过检波送入表头显示。借助倍率开关,可得到三个不同的量限:0,2Ω,0,20Ω,0,200Ω。 2、使用范围 本表适用于电力、邮电、铁路...
HT2571接地电阻测量仪
HT2571接地电阻测量仪 HT2571接地电阻测量仪 一、产品介绍 1、工作原理 本表摒弃传统的人工手摇发电工作方式,采用先进的中大规模集成电路,应用DC/AC变换技术将三端钮、四端钮测量方式合并为一种机型的新型接地电阻测量仪。 工作原理为由机内DC/AC变换器将直流变为交流的低频恒流,经过辅助接地极C和被测物E组成回路,被测物上产生交流压降,经辅助接地极P送入交流放大器放大,再经过检波送入表头显示。借助倍率开关,可得到三个不同的量限:0,2Ω,0,20Ω,0,200Ω。 2、使用范围 本表适用于电力、邮电、铁路、通信、矿山等部门测量各 种装置的接地电阻以及测量低电阻的导体电阻值;本表还可 测量土壤电阻率及地电压。 3、主要特点 1) 结构上采用高强度铝合金作为机壳,电路上为防止工频、射频干扰采用锁相环同步跟踪检波方式并配以开关电容滤波器,使仪表有较好的抗干扰能力。 2)采用DC/AC变换技术将直流变为交流的低频恒定电流以便于测量。 with the supervising engineer in the construction process, strictly in accordance with the owner and engineer for construction approval of construction organization design and quality control. In the team of "self-inspection, mutual inspection, handover inspection" and mass spot check on the basis of the technology sector, initiative to accept supervision engineers, tianjing quality supervision and quality supervision station of Beijing railway administration supervision and inspection, with the supervising engineer for good construction quality inspection and supervision engineer's request for rectification, and ensure the timely completion of construction quality. 4, with the coordination of railway-related units to give full play of my units in railway construction experience, familiar with the advantages of existing procedures relating to the construction, active railway-related functions, contact the facilities management unit, comply with the relevant provisions of existing line construction, signed before construction to maintain existing equipment security operations and ensure the safety of construction match the custody agreement, and implementation in the construction process. 5, coordination with local governments, transportation agencies actively contact with local governments, transportation, environmental protection and other sectors, actively seeking the cooperation and support of the local government sector, with local governments and make the construction of law and order in the region, environmental protection, ensure 3) 允许辅助接地电阻在0,2KΩ(RC),0,40KΩ(RP)之间变化,不致于影响测量结果。 4)本仪表不需人工调节平衡,3(1/2)位LCD显示,除测地电阻外,还可测低电阻导体电阻、土壤电阻率以及交流地电压。 5)如若测试回路不通表头显示“1”代表溢出,符合常规测量习惯。 二、技术指标 1、使用条件 环境温度:0?,+45? 相对湿度:?85% 2、测量范围及恒流值(有效值) 电阻:0,2Ω(10mA),2,20Ω(10mA),20,200Ω(1mA) 电压:AC 0,20V 3、测量精度及分辨率 精度:0,0.2Ω??3%?1d 0.2Ω,200Ω??1.5%?1d 1,20V??3%?1d 分辨率:0.001Ω、0.01Ω、0.1Ω、0.01V 4、辅助接地电阻及地电压引起的测量误差 允许辅助接地电阻RC(C1与C2之间) 0,2Ω,2,20Ω ?1KΩ 20,200Ω ?2KΩ , transportation, environmental protection and other sectors, actively seeking the cooperation and support of the local governmentsn the construction process. 5, coordination with local governments, transportation agencies actively contact with local goverxisting equipment security operations and ensure the safety of construction match the custody agreement, and implementation isigned before construction to maintain e related functions, contact the facilities management unit, comply with the relevant provisions of existing line construction,-r with the advantages of existing procedures relating to the construction, active railwayrelated units to give full play of my units in railway construction experience, familia-uality. 4, with the coordination of railwayn quality inspection and supervision engineer's request for rectification, and ensure the timely completion of construction qructioupervision station of Beijing railway administration supervision and inspection, with the supervising engineer for good conston the basis of the technology sector, initiative to accept supervision engineers, tianjing quality supervision and quality sinspection, mutual inspection, handover inspection" and mass spot check -anization design and quality control. In the team of "selfin the construction process, strictly in accordance with the owner and engineer for construction approval of construction orgwith the supervising engineer renment sector, with local governments and make the construction of law and order in the region, environmental protection, ensu2 武汉市华天电力自动化有限责任公司 R(P1与P2之间)<40KΩ 误差??5% P 允许地电压(工频有效值)?5V 误差??5% 5、电源及功耗 最大功率损耗?2W 直流:8×1.5V(AA,R6)电池 交流:220V/50Hz 6(体积与重量 体积:220×200×105 重量:?1.4kg 三、使用方法 1、接地电阻测量(如图一) 沿被测接地极E(C2、P2)和电位探针P1及电流探针C1,依直线彼此相距20米,使电位探针处于E、C中间位置,按要求将探针插入大地。 用专用导线将地阻仪端子E(C2、P2)、P1、C1与探针所在with the supervising engineer in the construction process, strictly in accordance with the owner and engineer for construction approval of construction organization design and quality control. In the team of "self-inspection, mutual inspection, handover inspection" and mass spot check on the basis of the technology sector, initiative to accept supervision engineers, tianjing quality supervision and quality supervision station of Beijing railway administration supervision and inspection, with the supervising engineer for good construction quality inspection and supervision engineer's request for rectification, and ensure the timely completion of construction quality. 4, with the coordination of railway-related units to give full play of my units in railway construction experience, familiar with the advantages of existing procedures relating to the construction, active railway-related functions, contact the facilities management unit, comply with the relevant provisions of existing line construction, signed before construction to maintain existing equipment security operations and ensure the safety of construction match the custody agreement, and implementation in the construction process. 5, coordination with local governments, transportation agencies actively contact with local governments, transportation, environmental protection and other sectors, actively seeking the cooperation and support of the local government sector, with local governments and make the construction of law and order in the region, environmental protection, ensure 位置对应联接。 开启地阻仪电源开关“ON”,选择合适挡位轻按一下键该档指标灯亮,表头LCD显示的数值即为被测得的地电阻。 2、土壤电阻率测量(如图二) 1) 测量时在被测的土壤中沿直线插入四根探针,并使各探针间距相等,各间距的距离为L,要求探针入地深度为L/20cm,用导线分别从C、P、P、C各端子与四根探针相连接。若地阻1122 仪测出电阻值为R,则土壤电阻率按下式计算: Ф=2πRL 其中 Ф—土壤电阻率(Ω?cm) L—探针与探针之间的距离(cm) R—地阻仪的读数(Ω) 用此法测得的土壤电阻率可近似认为是被埋入探针之间区域内的平均土壤电阻率。 2) 测地电阻、土壤电阻率所用的探针一般用直径为25mm, renment sector, with local governments and make the construction of law and order in the region, environmental protection, ensu, transportation, environmental protection and other sectors, actively seeking the cooperation and support of the local governmentsn the construction process. 5, coordination with local governments, transportation agencies actively contact with local goverxisting equipment security operations and ensure the safety of construction match the custody agreement, and implementation isigned before construction to maintain e related functions, contact the facilities management unit, comply with the relevant provisions of existing line construction,-r with the advantages of existing procedures relating to the construction, active railwayrelated units to give full play of my units in railway construction experience, familia-uality. 4, with the coordination of railwayn quality inspection and supervision engineer's request for rectification, and ensure the timely completion of construction qructioupervision station of Beijing railway administration supervision and inspection, with the supervising engineer for good conston the basis of the technology sector, initiative to accept supervision engineers, tianjing quality supervision and quality sinspection, mutual inspection, handover inspection" and mass spot check -anization design and quality control. In the team of "selfin the construction process, strictly in accordance with the owner and engineer for construction approval of construction orgwith the supervising engineer 4 武汉市华天电力自动化有限责任公司 长0.5,1m的铝合金管或圆钢。 3、导体电阻测量(图三) 4、地电压测量 测量接线如图一,拨掉C插头,E、P间的插头保留,启动11 )档,指示灯亮,读取表头数值即为E、P地电压(EV间的交流1地电压值。 5、测量完毕按一下电源“OFF”键,仪表关机。 四、注意事项 1、存放保管本表时,应注意环境温度湿度,应放在干燥通风的地方为宜,避免受潮,应防止酸碱及腐蚀气体。 2、测量保护接地电阻时,一定要断开电气设备与电源连接 点。在测量小于1Ω的接 地电阻时,应分别用专用 导线连在接地体上,C2 在外侧P2在内侧如图四with the supervising engineer in the construction process, strictly in accordance with the owner and engineer for construction approval of construction organization design and quality control. In the team of "self-inspection, mutual inspection, handover inspection" and mass spot check on the basis of the technology sector, initiative to accept supervision engineers, tianjing quality supervision and quality supervision station of Beijing railway administration supervision and inspection, with the supervising engineer for good construction quality inspection and supervision engineer's request for rectification, and ensure the timely completion of construction quality. 4, with the coordination of railway-related units to give full play of my units in railway construction experience, familiar with the advantages of existing procedures relating to the construction, active railway-related functions, contact the facilities management unit, comply with the relevant provisions of existing line construction, signed before construction to maintain existing equipment security operations and ensure the safety of construction match the custody agreement, and implementation in the construction process. 5, coordination with local governments, transportation agencies actively contact with local governments, transportation, environmental protection and other sectors, actively seeking the cooperation and support of the local government sector, with local governments and make the construction of law and order in the region, environmental protection, ensure 所示: 3、测量大型接地网接地电阻时,不能按一般接线方法测量,可参照电流表、电压表测量法中的规定选定埋插点。 4、测量地电阻时最好反复在不同的方向测量3,4次,取其平均值。 5、本仪表为交直流两用,不接交流电时,仪表使用电池供电,接入交流时,优先使用交流电。 6、当表头左上角显示“?”时表示电池电压不足,应更换新电池。仪表长期不用时,应将电池全部取出,以免锈蚀仪表。 五、装箱清单 1、仪器主机 1台 2、测试线 4根 包含:1.5m红线 1根 1.5m黑线 1根 20m黑线 1根 40m红线 1根 3、接地探针 2根 4、电池 8节 5、电源线 1根 6、说明 1本 renment sector, with local governments and make the construction of law and order in the region, environmental protection, ensu, transportation, environmental protection and other sectors, actively seeking the cooperation and support of the local governmentsn the construction process. 5, coordination with local governments, transportation agencies actively contact with local goverxisting equipment security operations and ensure the safety of construction match the custody agreement, and implementation isigned before construction to maintain e related functions, contact the facilities management unit, comply with the relevant provisions of existing line construction,-r with the advantages of existing procedures relating to the construction, active railwayrelated units to give full play of my units in railway construction experience, familia-uality. 4, with the coordination of railwayn quality inspection and supervision engineer's request for rectification, and ensure the timely completion of construction qructioupervision station of Beijing railway administration supervision and inspection, with the supervising engineer for good conston the basis of the technology sector, initiative to accept supervision engineers, tianjing quality supervision and quality sinspection, mutual inspection, handover inspection" and mass spot check -anization design and quality control. In the team of "selfin the construction process, strictly in accordance with the owner and engineer for construction approval of construction orgwith the supervising engineer 6 武汉市华天电力自动化有限责任公司 7、合格证/保修卡 1份 with the supervising engineer in the construction process, strictly in accordance with the owner and engineer for construction approval of construction organization design and quality control. In the team of "self-inspection, mutual inspection, handover inspection" and mass spot check on the basis of the technology sector, initiative to accept supervision engineers, tianjing quality supervision and quality supervision station of Beijing railway administration supervision and inspection, with the supervising engineer for good construction quality inspection and supervision engineer's request for rectification, and ensure the timely completion of construction quality. 4, with the coordination of railway-related units to give full play of my units in railway construction experience, familiar with the advantages of existing procedures relating to the construction, active railway-related functions, contact the facilities management unit, comply with the relevant provisions of existing line construction, signed before construction to maintain existing equipment security operations and ensure the safety of construction match the custody agreement, and implementation in the construction process. 5, coordination with local governments, transportation agencies actively contact with local governments, transportation, environmental protection and other sectors, actively seeking the cooperation and support of the local government sector, with local governments and make the construction of law and order in the region, environmental protection, ensure
/
本文档为【HT2571接地电阻测量仪】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索