牛仔裤的旧物改造——自己 改包包
原文地址:DIY牛仔裤的华丽转身:塔塔单肩包(教程)作者:映雪儿
晴阳妈对我的手工爱好实在是大力支持,捐送衣服后,可偶一直迟迟未有动工。或好像豆腐渣
一样,有头无尾。交不出货啊~
一次逛街时看到一款包,深受启发,回来小试牛刀。不用一天工夫就搞定了这小包包。实在很简单。
晴晴来家玩的时候,让她试试背背看。问她喜欢不喜欢,晴晴笑眯眯眼的点点头。菲比一旁看到,直接抢下来说:“It is my"。把包包拿回房间。丢到床上,出房间时还反手把门关上。深怕人抢走她的包包。
晴晴一脸无奈又无辜的
情,但很懂事。无半句怨言,低下头又玩其它去了。做惯大姐姐的晴晴真的很懂事。总会让着弟弟妹妹。
在我做这包包时脑子就一直想着晴晴的啊~因为晴晴出门在外手里总拎个包包。每次我一提晴晴的包包都感觉到好重,晴阳妈就会说:“是呀~三磅重的玩具在里面”所以我在裁剪包包时。就一心想着要装三磅重的东西啊:)结果成品又被我整得有点过大了。菲比对包包并不感兴趣,但看我在做包包时。一直在问“It is for me?"
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
我就反问她,菲比喜欢这包,菲比想要呀,菲比就认定是做给她的了。唉~
这样也好。让我决心做多一款姐妹包。到时出外玩时就“一人一包,永不落
空”
一:
:旧牛仔裤,里布,魔术贴,针线等
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
二:把牛仔裤腿,裁出一段
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
三,从侧边剪开(如果布不够大,就需要用到两条裤腿)
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
四:带子用的长布条(8*45CM)
梯形布片两块(长23,上宽18,下宽22CM)并在布面画分四等分,
剪出四布条,分别是高7*28,7*30,7*32,7*34CM
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
五:布条上方疏缝一条线,然后拉紧收缩成皱褶如图。四布条用同样方法做成波
浪边。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
六:有条件的可给布条锁一上边,不锁也可以。是一种特色:)
然后按画好的四等分。将波浪布条缝在梯形布上。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
七:剪两块里布,大小与梯形面布相同
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
八:将里布和牛仔面布。正面对着车缝三边成袋子。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
九:里布缝上魔术贴
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
十:裤脚的最下端,如图剪下。拆开用来做袋口的包边。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
十一:将里布放入袋子里,包边布一头缝上。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
十二:包边布折反出来,在外面车缝一条明线。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
十三:带子缝好,反回正面。(可用筷子来反)
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
十四:将带子缝在包包的两边
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
十五:如图缝个小布条做装饰花
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
十六:将布条随意卷成花的形状,缝在包包上。塔塔小包完工了:) 牛仔裤有耐磨的特点,用来改造成包包最合适了。层层叠叠塔塔边,时尚创意原来这么简单。时尚潮宝用此包包穿衣搭配很亮眼。可以装点小杂物,或者是装个小便当上学也很不错。是一款妈妈和孩子都可共用的包包。
一些人家里面肯定有一两条不穿的旧牛仔裤,扔了很可惜,丢下来也没用处。这里给大家介绍一种创意DIY方法,把旧牛仔裤手工制作成一款时尚包包,走在街上肯定吸引大家的眼球,喜欢DIY的朋友一起来学习吧。
牛仔裤变身时尚包包的效果图
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
牛仔裤变身时尚包包的制作步骤:
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤1
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤2
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤3
步骤4
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤5
步骤5
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤6
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤7
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤8
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤9
步骤10
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤11
步骤12
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤13
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
步骤14
完成了
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
所需材料:
一条旧牛仔裤 一块里布 布用双面胶 拉锁装饰扣 一条旧皮带。
其实算不上教程,为了棉仔也为了重在参与,呵呵。
第一步:
找一条自己不穿了的牛仔裤,剪下一条裤子褪。
第二步:
取中间段作为包包的主体,背面烫上里布。
并且拆下一个裤子兜作包包的口袋,口袋可以做成双层。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
第三步:
剪半径为10里面的圆形里布2块、布用双面胶2块、牛仔布两块分别用熨斗烫好备用。
作为包包的两侧部分,把包包做成圆柱形状。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
第四步:
在主体牛仔布的正反面,用贴布缝任意缝自己喜欢的图案、或者直接用布用双面胶烫。 由于是第一次做,所以我做了一个鲜明的对比,正面比较花哨,背面比较素气。 最后我还是喜欢素一些。
第五步:
将刚才烫好的圆形布与主体布正面相对缝好并且缝上拉锁,最后翻至正面。 我选择的是双向拉锁,配圆柱形包好看一些。(纯属个人喜好,呵呵) to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
第六步:
由于我的初衷是旧物改造嘛,所以找一条废旧的装饰腰带改成皮背带与包包相接缝好。
包包就算是完成了,最终效果。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
博文标签:
手工旧物改造牛仔改造DIY
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
过时的牛仔短裤,扔了怪可惜的,当然这不是我的,一看就是女式的嘛,只是为了跟大家分
享一下怎么把不要的短裤改装成小包包。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
改造之后的样子,看起来还想是那么回事儿吧~
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
其实很简单,最主要的步骤就是把裤腿的地方找块布料给缝上就好了,不要太窄,否则就会
很瘪,装不了什么东西。
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
然后就是两个手提的带子,自己随意发挥,什么样子都可以,最好是跟底部统一,要不然
感觉会很奇怪,最后不要忘了在原来的裤腰处缝上拉链哦
1.布两片A.B.图中布的尺寸是38CM*6CM.我这是随手拿了一块这么长的布片,实际尺寸可根据你
自己需要而定
铺棉一片.铺棉的尺寸要比布片的尺寸小一缝份,也就是说铺棉的尺寸是布片未加缝份的尺寸
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
2.缝纫机调大针脚把铺棉与B在两边边缘固定
3.把A与和铺棉固定好的B正面相对
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
4.用缝纫机缝合在一起预留约10CM反口,为了翻过来后圆角处平整,在圆角处剪几个剪口(这
一步我忘记做了)
5.通过反口翻到正面,整理平整用藏针法缝合反口
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
6.对折用A把B包在里面,从离顶端约5CM处起针开始缝合
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
7.缝合好的样子
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
8.固定在包包上,固定方法可以用暗缝法--看这里姐姐的手提包.也可以用明线--看这里改之乐
&小短裤摇变......手提包,要看你想要的效果了,当然牢固是最重要的
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
旧牛仔裤改造包包DIY图解
注意
1.建议用比较厚实的布做
2.要用那种蓬松感强的铺棉
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
LEO很冷 收集到 DIY手工 专辑中,通过糖友totogirl2012-03-18 01:11
加关注
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head