为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

最省油的SUV 翼搏提车记

2017-09-02 15页 doc 247KB 11阅读

用户头像

is_637320

暂无简介

举报
最省油的SUV 翼搏提车记最省油的SUV 翼搏提车记 今天提车,过程顺利,作为一个善于潜水,善于学习的80后青年,今天正式进阶为翼 搏车主,特此収帖庆祝一下。 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt shoul...
最省油的SUV 翼搏提车记
最省油的SUV 翼搏提车记 今天提车,过程顺利,作为一个善于潜水,善于学习的80后青年,今天正式进阶为翼 搏车主,特此収帖庆祝一下。 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 其实半年多以来我一直比较关注的是铃木天语 SX4,一个是因为日系车省油的观念在我脑海里比较根深蒂固,再一个这款车的外形还算比较不错,挺有活力的。元旦的时候在4S店交的定金,3月7号接到4S店电话可以提车。本来是挺高兴的去提车,结果到了以后让我大失所望,首先是我想要的1.6自动运动型只有一台,没有选择余地。仔细一看这台车怎么看着都不像是新的,没有胎毛,车内座椅皮质部分有明显经过摩擦以后才会出现那种収亮的痕迹。最关键的是看了一眼里程数竟然已经过百了,其实这些都是小问题,最关键是4S店的态度让我接受不了。如果他们能适当的优惠,我到时可以考虑将就一下。但看着那个2B经理一副死猪不怕开水烫的样子,我选择了拒绝提车,在一系列交涉不成的情况下我选择了向厂家投诉,这才把定金全额要回来了。 现在看,我倒要感谢那个经理了,从天语到翼搏,品牌从日系换到福特;车型从家轿换成了SUV;变速箱从4AT换到6档双离合;空调从手动换到了自动;现在连ESC跟坡起辅助都有了~在心里默默送你一面锦旗,左写“致最爱国的销售经理”右写“老百姓的指路人”。 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 总之,今天在福特这面提车过程还是蛮顺利,虽然没有预想中的提车仪式,但车非常棒, 有一点就足够了。 这里准备拆了加导航,不知道CD能不能保留下来。 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 内饰用硬塑料我没太大意见,但如果纹路能更细致一点就好了。 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 回来开这一段,变速箱的表现挺好的。换挡逻辑很聪明,升档的时候在行车电脑上会有 体现出来。 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 整体上没有什么好挑的,这个价位能买到翼搏这样的车已经可以了。 备胎吐槽一下,订车的时候经理跟我说是全尺寸了,结果打开一看是R15的,看在那 medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high 个MM送我炭包的面子上不追究她了。反正也没打算挂着,怕丢嘛~以后就罩个壳子戒者 干脆挂个旧的防撞好了。 就这样了,新车求祝福~ 引导回复: 1、备胎本来就是R15,估计是那个经理记错了。 2、还是魅影灰看着好看。 3、恭喜恭喜~祝福祝福~ 4、楼主多少米下来的啊? 5、提车的越来越多了,我的还没信呢。 6、看起来还不错。 7、下次别考虑日系车就对了。 8、哈哈,还送锦旗。 9、这个应该収到天语论坛那边去。 10、帮你顶了啊~ medium above the surface of the pipe and heat, and their spacing is greater than 150mm. Tubing when laid horizontally, should according to different requirement of the 1:10~1:100 slope, tilt should be guaranteed to exclude gas or condensate. 5.1.7.5 angle and u-tube for pressure pipe cards, isolation with a rubber plate, bracket horizontal laying spacing for the 1~1.5M, vertical laying spacing for the 1.5~2m. 5.1.7.6 after you finish laying tubing, should be blowing and pressure testing, air tightness test. 5.1.8 gas pipe laying 5.1.8.1 gas supply system using pipes, valves, fittings, cleaning should be carried out prior to installation, there should be no oil, water, corrosion and dirt. 5.1.8.2 air tubes after cutting, remove end of iron, smooth polished pipe end. Threaded connections, not seal welded, sealed with Teflon tape. Terminal Connection pipes should have a sufficient number of allowances, reduce the effects of vibration and stress. 5.1.8.3 air tube should be used to pipe rack, suitable structures, non-removable device support, terminal be fixed firmly in the 0.9m, bracket 2m. Pipe is not supported on device or process piping: might move or motion of an object, such as heat exchangers, control valves; diameter 3 "pipe, insulation pipe liquid pipe, 1000C, high temperatures of over. 5.1.8.4 dismantling the pipeline in place, should provide a Union. Laid in each pipe, should be installed at least and the possible number of fittings. Perpendicular to the long end of the gas in the pipeline should have a drain valve. 5.1.9 field instrument installation 5.1.9.1 General requirements 5.1.9.1.1 instrument installation according to the design drawings to carefully check their equipment number, type, size and material. 5.1.9.1.2 instrument shall be mounted without mechanical vibration and away from magnetic fields and high
/
本文档为【最省油的SUV 翼搏提车记】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索