教你认识各种狗狗
棕色京巴
白色博美
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
德国黑背
吉娃娃
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
幼年松狮
八哥
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
杜宾,坚定地,顽强地一个接近完美的犬种。它的性情是友善的,镇静的,忠实于家庭并且喜欢和孩子相
处。在它的主人的命令下能激发它猛烈的进攻,高智商使之与主人能形成很好的默契,容易训练
阿拉斯加雪橇犬
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
幼年萨摩耶
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
成年萨摩耶
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
幼年拉布拉多
成年拉布拉多
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
幼年金毛巡回
成年金毛寻回
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
泰迪(其实泰迪是贵宾修剪后的一种形态,叫做泰迪熊只是商家炒作而已)
请点图片中的人或物,对他们进行标识。
成年苏格兰牧羊犬
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
黑色哈士奇
棕色哈士奇
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on
深蓝色哈士奇
construction unit to ensure a quality installation, first to pre-installed pivot, measured the door blade and the arm connecting plate ... Butt weld, finally welded panels butt; leaves one or two types of welding in accordance with specifications for the weld appearance quality inspections and internal ultrasonic testing of welds. 8.2.4 gate gate leaf Assembly installation: spell the group mainly uses the 8 ton truck crane and 50 ton crawler crane installation. First sill after cleaning, advance introduction to buttress tank level detection. Lower door leaf lift locked on to buttress, gate water seal base plate vertical adjust the door leaf, reinforced after the lower part of the door leaf in place. Door leaves all the paragraphs after hoisting, retest the door leaf size and distort, after passing inspection before welding door leaf. Menyeshui installation: due to bearing slider in factory assembled, water sealed the site the main installation work. Temporary will water seal plate pressure in sealed article Shang, in level direction and vertical direction check water seal of straight degrees whether meet requirements, Hou with Mark pen from gate Panel of check water bolt hole within draw bolt hole in check water article Shang of location, in corresponding of mark Shang drill out sealed article of bolt hole, with bolt try dressed Hou, removed has joint of water seal, with strong hot rubber of way, will water seal firmly stick received in with, forming Hou with wheel machine gently processing rugged of surface, and check water seal round head surface uneven degrees, each across 0.5M measuring is, After passing on