为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

竞争性谈判程序

2017-10-16 30页 doc 89KB 7阅读

用户头像

is_321635

暂无简介

举报
竞争性谈判程序竞争性谈判程序 ************************** 建设单位:************** 日 期:2012年 月 日 目 录 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, re...
竞争性谈判程序
竞争性谈判程序 ************************** 建设单位:************** 日 期:2012年 月 日 目 录 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 1、竞争性谈判基本程序 2、供货方须知 3、竞争性谈判书(格式) 4、购买合同(样本) 一、竞争性谈判组成 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 一、谈判时间及地点 1、谈判时间: 2、谈判地点: 二、谈判主持人 三、谈判小组:由五人以上单数的村民代表组成。 监督机构: 四、谈判顺序和轮次 1、谈判顺序:按递交谈判书的先后顺序进行。 2、谈判轮次:本次竞争性谈判为一次谈判,谈判小组与供货方逐一谈判,了解拟谈货物的基本资料和最终报价; 五、谈判程序: 1、谈判文件发给前来报名参加谈判的供货方; 2、供货方在规定的时间、地点提交谈判书,开始谈判。 3、由谈判小组按递交谈判书的顺序逐一开启谈判书,由供货方在规定的时间(10分钟)内对货物单价及货物进行介绍,谈判小组就货物单价及货物情况进行提问,并确定优slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 惠率及承诺条件。 4、通过谈判,由谈判小组评选出满足要求的供货方。 5、村委会与合格的供货方签定供货合同。 六、谈判内容: 1、供货方资质证明文件; 2、供货方所提供的货物是否符合购买要求; 3、货物的报价及服务承诺书; 4、交货期及交货地点; 5、其他有关承诺; 七、评定: 谈判小组根据以下标准对供货方所提供的资料进行综合评议。并最终确定符合购买要求,且报价合理的供货方 1、供货方所提供的货物满足购买的要求; 2、供货方的最终报价合理; 3、供货方无不良记录,企业信誉良好; 4、供货方承诺的交货时间能满足购买要求; 5、供货方的供货最优,服务承诺较好。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 6、供货方的资信及相关供货业绩较好。 7、供货方承诺的其他优惠条件对购买人最为有利。 8、供货方提供的资料能最大程度的满足谈判文件的要 求。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 二、供货方须知 1、供货方资格 (1)具有独立的法人资格和国家工商行政管理部门核发的营业执照; (2)具有税务登记证; (3)具有银行开户许可证; (4)具有组织机构代码证; (5)行业生产许可证。 2、谈判书的提交:供货方提交的谈判书要在规定的时间前交到指定的地点,迟到的谈判书将被拒绝。供货方的谈判代表须在开启谈判书前提交法人代表授权书及身份证原件以确定身份。 2.1 递交时间: 2.2 递交地点: 2.3 供货方须提交的资料包装要求: 谈判书要求胶装成册且密封,并提供正本壹份,副本伍份(格式附后)。未按要求密封的谈判书将被拒绝。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 密封标志 项目名称:******************竞争性谈判书 (一正五副) 供货方: (盖章) 开启时间:谈判时开启 3、谈判书的文字:所有文字均为中文汉字简体 4、谈判书的货币单位:所有货币均用人民币表示 5、谈判费用 参加谈判的供货方应承担其编制谈判书、递交谈判书及谈判过程中所涉及的一切费用。不管谈判结果如何,购买方对上述费用不负任何责任,且谈判书不予退还。 6、购买方保留对供货方现场考察的权利,若供货方在提交的谈判书中存在虚假、伪造资料的情况,一经查实,将取消其供货资格并向有关部门通报。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, ************************* 供货方: 日 期:2012年 月 日 目 录 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 1、资格证明文件 1.1 法定代表人授权 1.2 承诺书 1.3 营业执照(正副本) 1.4 税务登记证(正副本) 1.5 银行开户许可证 1.6 组织机构代码证 1.7其他相关资质证书 2、报价部分 2.1 报价函 2.2 单价汇总表 2.3 单价组成表 2.4 运输费用计算表 3、其他资料 3.1 产品情况简介 3.2 生产能力简介 3.3 其他资料 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 1.1、法定代表人授权委托书(格式) 授 权 委 托 书 本授权委托书声明:我 (姓名)系 (企业)的法定代表人,现授权委托 (单位名称)的 (姓名)为我公司法定代表人授权委托代理人,我承认代理人全权代表我公司进行***************竞争性谈判事宜。 代理人无转委托权,特此委托。 代理人: (签字) 性别: 年龄: 身份证号码: 职务: 授权委托日期: 年 月 日 身份证复印件 1.2、承诺书(格式) slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 承 诺 书 致:*************** 我公司愿意对***************进行竞争性谈判,谈判文件中所有关于供货方资格的文件、证明、陈述均是真实的、准确的。若有违背,我公司承担由此而产生的一切后果。 特此承诺~ 供货方: (名称/公章) 供货方法定代表人: (签字) 日期:2012年 月 日 1.3 营业执照(正副本) 1.4 税务登记证(正副本) slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 1.5 银行开户许可证 1.6 组织机构代码证 1.7其他相关资质证书 2.1、报价函(格式) 报 价 函 致:xxxxxxxxxx slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 根据xxxxxx,xxxx材料购买邀请函,经法定代表人正式授权提交下述文件正本壹份和副本伍份: (1) 报价汇总表 (2) 货物的分项价格表 (3) 产品单价一览表 (4) 货物相关的技术、商务说明资料 (5) 资格证明文件及资料 (6) 其他资料 (7) 按照谈判文件中的要求提供所需购物的货物单价: 1、含运输费用单价: (1)****************单价: 元/*。 (2)****************单价: 元/*。 (3)****************单价: 元/*。 (4)****************单价: 元/*。 2、不含运输费用单价: (1)****************单价: 元/*。 (2)****************单价: 元/*。 (3)****************单价: 元/*。 (4)****************单价: 元/*。 明细报价见货物的分项报价明细表。作为谈判文件的一部分,如果我方成为供货方,我方将按谈判文件的规定履行合同责任和义务,供货方已详细审查全部谈判文件。 2.2、单价汇总表(格式) 单价汇总表 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 序材料 报价交货期交货地单位 备注 号 名称 (元) 限(天) 点 含运输费1 用 2 含运输费3 含运输费用 4 含运输费用 „ 用 5 不含运输6 不含运输费用 7 不含运输费用 8 不含运输费用 „ 费用 注:1、此表可自行扩展。 2、所有价格为开据发票价(含税金)。 3、谈判人根据自身情况进行报价。 法定代表人(或授权委托人): (姓名/签字) 日期: 年 月 日 2.3、单价组成表(格式) slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 单价组成表(含运输费用) 单位:元 序运输费其他 产品名称 单位 出厂价 谈判单价 号 用 费用 1 2 3 4 „ 注:其他费用为生产、销售等环节的其他费用,有则填写, 无则不填写(下同)。 单价组成表(不含运输费用) slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 单位:元 序其他费用 产品名称 单位 出厂价 谈判单价 号 1 2 3 4 „ 法定代表人(或授权委托人): (姓名/签字) 日期: 年 月 日 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 七、运输费用计算表(格式) 运输费用计算表 单位运输费序运输距离 产品名称 单位 用 运输费用 号 (km) (元/km) 1 2 „ 法定代表人(或授权委托人): (姓名/签字) 日期: 年 月 日 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 3.1、产品情况简介(格式) 产品情况简介 序产品名规生产厂产品主要说主要材料辅材 单位 号 称 格 家 明 说明 说明 1 2 3 4 5 6 7 8 法定代表人(或授权委托人): (姓名/签字) 日期: 年 月 日 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 3.2、生产能力简介(格式) 生产能力简介 1、主要设备: 2、检测设备: 3、月最大生产能力: 4、年生产能力: 法定代表人(或授权委托人): (姓名/签字) 日期: 年 月 日 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 3.3其它资料 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 购买合同(样本) 需方: (以下简称甲方) 供方: (以下简称乙方) 根据《中华人民共和国合同法》及其它有关法律、法规的规定,双方本着公平、自愿、平等、诚实信用达成如下协议,签订本合同(以下简称“本合同”): 一、质量要求: 1、质量标准: 2、规格 二、数量及质量的验收: 1、乙方向甲方供应的材料,必须符合本合同约定的质量要求,乙方负责提供材料相关检测。若所交付的材料不符合合同约定的质量要求,乙方应负责运回不合格品。 三、运输方式:材料由乙方负责运输,以到场收方后方可卸货。 四、价格及结算方式: 1、价格: 序暂估综合 名称 规格 单位 合计 备 注 号 数量 单价 含营业税发 票 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 2、结算方式: 3、乙方根据甲方现场实际需求进行供货,以甲方采购员书面订单或电话通知为准进行供货。 五、违约条款: 1、在合同期内,如国家政策因素导致停产,双方互不赔偿,应结清材料款,此合同自然终止。 2、合同一旦签订,双方均应依据约定如实、全面履行,如果合同一方发现另一方不履行或不能履行合同,可视为另一方违约。这种情形下,守约方应追究违约方相应的法律责任。 六、争议解决办法: 因执行本协议所发生的或者与本协议有关的一切争议将由双方当事人通过友好协商解决。如果不能协商一致,应将争议提交毕节市法院解决。 七、本合同自签订之日起生效。在合同执行期间,甲乙双方的任何一方均不得擅自变更合同。合同中如有未尽事宜,应由甲乙双方共同协商后签署补充协议。补充协议具有与本合同同等的效力。 八、合同有效期限: 九、本合同一式两份,甲乙双方各执一份,每份都具有相同效力。 slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances, 需方: 供方: 需方代表签字: 供方代表签字: 日期: 日期: slightly lowered the field side, the steam end rotor weight transfer to the Middle slider. Synchronize pull hoist on both sides, slowly into the rotor and steam-side slider outlet ring, removing steam-side slider. Continues to synchronization pull sides gourd, slowly wear into rotor, stay steam end coupling wear out steam end frame outside wall Shi, will another a Taiwan lane of wire rope hanging live steam end axis neck scapular block, should note lifting wire rope shall not and steam end frame outside wall collide, slowly up high steam end of wire rope, makes steam end rotor of weight transfer to wire rope Shang, then again using two Taiwan lane synchronization up high rotor... 6.5 unit main plant soda small pipeline laying 6.5.12 times design design principles on thermal system pipeline of run parameter and process and work characteristics has general understand, in drainage pipes installation in the, not allows has against system of wrong loaded, and leak loaded, also cannot to short-range easy, will different pressure level of sparse water any parallel, and over, and turned note, or received wrong mother tube of chaos conveying, to special note this class pipeline material and specifications of line. Process piping trend is to have a unified and orderly global concept, the arrangement should facilitate the operation and installation of the valve firmly. Depending on the circumstances,
/
本文档为【竞争性谈判程序】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索