为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

Photoshop调出树林婚片甜美的黄褐色

2017-12-06 43页 doc 773KB 20阅读

用户头像

is_614050

暂无简介

举报
Photoshop调出树林婚片甜美的黄褐色Photoshop调出树林婚片甜美的黄褐色 Photoshop调出树林婚片甜美的黄褐 色 本教程介绍黄褐色婚片调色方法。大致过程:先用色彩叠加或渐变映射等给图片加 上淡淡的主色,然后再用调色工具逐步加强及深化整体颜色,最后添加暗角及高光等即 可。 原图 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the trans...
Photoshop调出树林婚片甜美的黄褐色
Photoshop调出树林婚片甜美的黄褐色 Photoshop调出树林婚片甜美的黄褐 色 本教程介绍黄褐色婚片调色方法。大致过程:先用色彩叠加或渐变映射等给图片加 上淡淡的主色,然后再用调色工具逐步加强及深化整体颜色,最后添加暗角及高光等即 可。 原图 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 最终效果 1、打开原图素材,创建渐变映射调整图层,颜色设置如图1,确定后把图层混合模式 改为“饱和度”,不透明度改为:30%,效果如图2。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图1:渐变映射调整层,饱和度,30%> <图2:效果> 2、按Ctrl+Alt+~调出高光选区,按Ctrl+Shift+I反选,新建一个图层填充颜色: #64360F,混合模式改为“滤色”,效果如下图。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图3:高光选区,反选,颜色填充层,滤色> 3、创建渐变映射调整图层,颜色设置如图4,确定后把图层混合模式改为“变亮”, 不透明度改为:50%,效果如图5。 <图4:渐变映射调整层,变亮,50%> from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图5:效果> 4、创建可选颜色调整图层,对红,黄,绿进行调整,参数设置如图6-8,效果如图9。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图6:可选颜色调整层-红> <图7:可选颜色调整层-黄> from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图8:可选颜色调整层-绿> <图9:可选颜色调整层-效果> 5、创建曲线调整图层,对蓝色进行调整,参数设置如图10,效果如图11。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图10:曲线调整层-蓝> from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图11:曲线调整层-效果> 6、创建可选颜色调整图层,对红,黄进行调整,参数设置如图12,13,确定后按Ctrl+J 把当前可选颜色调整图层复制一层,不透明度改为:30%,效果如图14。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图12:可选颜色调整层-红> <图13:可选颜色调整层-黄> from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图14:可选颜色调整层-效果> 7、按Ctrl+Alt+~调出高光选区,按Ctrl+Shift+I反选,新建一个图层填充颜色: #160F41,混合模式改为“滤色”,不透明度改为:60%,效果如下图。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图15:高光选区,反选,颜色填充层,滤色,60%> 8、创建可选颜色调整图层,对红色进行调整,参数设置如图16,效果如图17。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图16:可选颜色调整层-红> <图17:可选颜色调整层-效果> 9、按Ctrl+J把当前可选颜色调整图层复制一层,效果如下图。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图18:复制可选颜色调整层> 10、新建一个图层,简单给图片加上暗角,方法任选。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图19:暗角> 11、新建一个图层,按Ctrl+Alt+Shift+E盖印图层。执行:滤镜>模糊>动感模糊,数 值自定,确定后把图层混合模式改为“柔光”,不透明度改为:30%,效果如下图。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图20:盖印图层> 12、新建一个图层,混合模式改为“滤色”,把前景颜色设置为:#84473A,用画笔把 下图选区部分涂上高光,再适当降低图层不透明度,效果如下图。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图21:颜色填充层,滤色> 13、创建曲线调整图层,对RGB及蓝色进行调整,参数设置如图22,效果如图23。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图22:曲线调整层-RGB,蓝> from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图23:曲线调整层-效果> 14、新建一个图层,盖印图层,按Ctrl+Shift+U去色,混合模式改为“柔光”,不透 明度改为:30%,效果如下图。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <图24:盖印图层,去色,柔光,30%> 最后调整一下整体颜色,完成最终效果。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order <最终效果> from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
/
本文档为【Photoshop调出树林婚片甜美的黄褐色】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
热门搜索

历史搜索

    清空历史搜索