儿童喜爱歌曲《爱我你就抱抱我》、《爸爸去哪儿》《低碳贝贝》歌词
林妙可---《爱我你就抱抱我》 爸爸妈妈 如果你们爱我 就多多的陪陪我 如果你们爱我 就多多的亲亲我 如果你们爱我 就多多的夸夸我 如果你们爱我 就多多的抱抱我
(rap) 陪陪我 亲亲我 夸夸我 抱抱我 陪陪我 亲亲我 夸夸我 抱抱我
妈妈总是对我说 爸爸妈妈最爱我 我却总是不明白 爱是什么
爸爸总是对我说 爸爸妈妈最爱我 我却总是搞不懂 爱是什么
爱我你就陪陪我 爱我你就亲亲我 爱我你就夸夸我 爱我你就抱抱我 爱我你就陪陪我 爱我你就亲亲我 爱我你就夸夸我 爱我你就抱抱我
如果真的爱我 就陪陪陪陪陪陪我 如果真的爱我 就亲亲亲亲亲亲我 如果真的爱我 就夸夸夸夸夸夸我 如果真的爱我 就抱抱我
陪陪我 亲亲我 夸夸我 抱抱我 陪陪我 亲亲我 夸夸我 抱抱我
妈妈总是对我说 爸爸妈妈最爱我 personal safety and safety equipment. 5.1.1.6 construction overall arrangement of instruments (see the following figure) ... 5.1.3.1.1 cabinets, Terminal cabinets, enclosures, UPS battery cabinet base hot-rolled angle steel, hot-rolled angle iron and steel production, the support base as a whole should be kept straight, the weld size overall dimensions meet the requirements should be the principle, Stent positioning and embedded parts after welding in prison. 5.1.3.1.2 bracket mounting holes required on arrival at the scene, cabinet base hole dimension processing. Enclosure base must be in the control room the control room floor before you start the installation to complete, and activities should be considered a floor support frame set match. Base installation errors shown in the table below. Permissible deviations mm/m items mm/full length straight level 1, 5, 1, 5, position error and parallel degree 5 5.1.3.2 system Panel, cabinet installation 5.1.3.2.1 unpacking and inspection (1) together with owners, supervision carried out jointly on behalf of the company, signed after the inspection opening inspection records; (2) before unpacking, on the surrounding floors, tables and chairs, tools, static elimination measures taken, check the device packaging is complete; upon opening the box, you should check if the packaging is damaged, whether the water, moisture-proof, shock-proof measures is good; (3) special tools should be used when opening the box, press level, in order to open packaging; be cautious, non-violent beating; (4) out of the box in accordance with the packing list one by one after an inventory of all hardware, spare parts, a random number of tools, models, specifications, should be consistent with the packing list; hardware looks good, no deformation, breakage, especially off defects such
我却总是不明白 爱是什么 爸爸总是对我说 爸爸妈妈最爱我 我却总是搞不懂 爱是什么
爱我你就陪陪我 爱我你就亲亲我 爱我你就夸夸我 爱我你就抱抱我 爱我你就陪陪我 爱我你就亲亲我 爱我你就夸夸我 爱我你就抱抱我
如果真的爱我 就陪陪陪陪陪陪我 如果真的爱我 就亲亲亲亲亲亲我 如果真的爱我 就夸夸夸夸夸夸我 如果真的爱我 就抱抱我
爱我你就陪陪我 爱我你就亲亲我 爱我你就夸夸我 爱我你就抱抱我 爱我你就陪陪我 爱我你就亲亲我 爱我你就夸夸我 爱我你就抱抱我 爱我你就陪陪我 爱我你就亲亲我 爱我你就夸夸我 爱我你就抱抱我
《低碳贝贝》歌词
作词:聂智民 作曲:麦 子 演唱:林妙可、柳博、香奈儿、群星
地球爷爷已经很累
默默承受人类的罪
personal safety and safety equipment. 5.1.1.6 construction overall arrangement of instruments (see the following figure) ... 5.1.3.1.1 cabinets, Terminal cabinets, enclosures, UPS battery cabinet base hot-rolled angle steel, hot-rolled angle iron and steel production, the support base as a whole should be kept straight, the weld size overall dimensions meet the requirements should be the principle, Stent positioning and embedded parts after welding in prison. 5.1.3.1.2 bracket mounting holes required on arrival at the scene, cabinet base hole dimension processing. Enclosure base must be in the control room the control room floor before you start the installation to complete, and activities should be considered a floor support frame set match. Base installation errors shown in the table below. Permissible deviations mm/m items mm/full length straight level 1, 5, 1, 5, position error and parallel degree 5 5.1.3.2 system Panel, cabinet installation 5.1.3.2.1 unpacking and inspection (1) together with owners, supervision carried out jointly on behalf of the company, signed after the inspection opening inspection records; (2) before unpacking, on the surrounding floors, tables and chairs, tools, static elimination measures taken, check the device packaging is complete; upon opening the box, you should check if the packaging is damaged, whether the water, moisture-proof, shock-proof measures is good; (3) special tools should be used when opening the box, press level, in order to open packaging; be cautious, non-violent beating; (4) out of the box in accordance with the packing list one by one after an inventory of all hardware, spare parts, a random number of tools, models, specifications, should be consistent with the packing list; hardware looks good, no deformation, breakage, especially off defects such
地球爷爷意冷心灰
每天流下伤心眼泪
地球爷爷小小心愿
还他一片纯净空间
地球爷爷深深渴望
希望地球是最美的地方
我们是可爱的低碳贝贝 让爷爷心情变美不再受累 我们就是时尚的低碳贝贝 节能环保成为日常行为 我们就是热情的低碳贝贝 低碳生活人群迅速加倍 我们就是爱心的低碳贝贝 伸出双手使地球越来越美
多坐大巴车少开
清洁能源来替代
节水节电来比赛
生活少用塑料袋
垃圾分类习惯在
循环利用巧安排
多多植树拓绿带
空气清新好神采
点滴节约阔不摆
留给后人青山在
如果地球都不爱
我们如何谈未来
地球爷爷恢复健康
personal safety and safety equipment. 5.1.1.6 construction overall arrangement of instruments (see the following figure) ... 5.1.3.1.1 cabinets, Terminal cabinets, enclosures, UPS battery cabinet base hot-rolled angle steel, hot-rolled angle iron and steel production, the support base as a whole should be kept straight, the weld size overall dimensions meet the requirements should be the principle, Stent positioning and embedded parts after welding in prison. 5.1.3.1.2 bracket mounting holes required on arrival at the scene, cabinet base hole dimension processing. Enclosure base must be in the control room the control room floor before you start the installation to complete, and activities should be considered a floor support frame set match. Base installation errors shown in the table below. Permissible deviations mm/m items mm/full length straight level 1, 5, 1, 5, position error and parallel degree 5 5.1.3.2 system Panel, cabinet installation 5.1.3.2.1 unpacking and inspection (1) together with owners, supervision carried out jointly on behalf of the company, signed after the inspection opening inspection records; (2) before unpacking, on the surrounding floors, tables and chairs, tools, static elimination measures taken, check the device packaging is complete; upon opening the box, you should check if the packaging is damaged, whether the water, moisture-proof, shock-proof measures is good; (3) special tools should be used when opening the box, press level, in order to open packaging; be cautious, non-violent beating; (4) out of the box in accordance with the packing list one by one after an inventory of all hardware, spare parts, a random number of tools, models, specifications, should be consistent with the packing list; hardware looks good, no deformation, breakage, especially off defects such
天空纯净不是渴望
地球爷爷露出微笑
人与自然和谐美妙
地球爷爷无限欣喜
绿色覆盖每寸土地
地球爷爷展望未来
期待生活越来越精彩
我们是可爱的低碳贝贝 让爷爷心情变美不再受累 我们就是时尚的低碳贝贝 节能环保成为日常行为
我们就是热情的低碳贝贝 低碳生活人群迅速加倍 我们就是爱心的低碳贝贝 伸出双手使地球越来越美 我们是可爱的低碳贝贝 让爷爷心情变美不再受累 我们就是时尚的低碳贝贝 节能环保成为日常行为
我们就是热情的低碳贝贝 低碳生活人群迅速加倍 我们就是爱心的低碳贝贝 伸出双手使地球越来越美
读:关爱他人 关爱自己 关注地球 关注未来
personal safety and safety equipment. 5.1.1.6 construction overall arrangement of instruments (see the following figure) ... 5.1.3.1.1 cabinets, Terminal cabinets, enclosures, UPS battery cabinet base hot-rolled angle steel, hot-rolled angle iron and steel production, the support base as a whole should be kept straight, the weld size overall dimensions meet the requirements should be the principle, Stent positioning and embedded parts after welding in prison. 5.1.3.1.2 bracket mounting holes required on arrival at the scene, cabinet base hole dimension processing. Enclosure base must be in the control room the control room floor before you start the installation to complete, and activities should be considered a floor support frame set match. Base installation errors shown in the table below. Permissible deviations mm/m items mm/full length straight level 1, 5, 1, 5, position error and parallel degree 5 5.1.3.2 system Panel, cabinet installation 5.1.3.2.1 unpacking and inspection (1) together with owners, supervision carried out jointly on behalf of the company, signed after the inspection opening inspection records; (2) before unpacking, on the surrounding floors, tables and chairs, tools, static elimination measures taken, check the device packaging is complete; upon opening the box, you should check if the packaging is damaged, whether the water, moisture-proof, shock-proof measures is good; (3) special tools should be used when opening the box, press level, in order to open packaging; be cautious, non-violent beating; (4) out of the box in accordance with the packing list one by one after an inventory of all hardware, spare parts, a random number of tools, models, specifications, should be consistent with the packing list; hardware looks good, no deformation, breakage, especially off defects such
低碳贝贝 时尚一派
低碳贝贝 引领时代
低碳贝贝 我做我精彩
《爸爸去哪儿》歌词
演唱:群星
Kimi:爸爸你会不会唱《小星星》啊, 林志颖:不会啊...
Kimi:那我教你哦,
林志颖:好啊~
Kimi:Twinkle twinkle little star
How i wonder what you are
林志颖:你有跑调哦~
林志颖&Kimi:(一起笑)
张悦轩:我的家里有个人很酷
郭子睿:三头六臂刀枪不入
王诗龄:他的手掌也有一点粗
轩&睿&龄:牵着我学会了走路
郭涛: 谢谢你光顾我的小怪物
张亮: 你是我写过最美的情书
王岳伦: 钮扣住一个家的幸福
张&郭&王: 爱着你呀风雨无阻
郭子睿&王诗龄&张悦轩:老爸老爸我们去哪里呀 有我在就天不怕地不怕
personal safety and safety equipment. 5.1.1.6 construction overall arrangement of instruments (see the following figure) ... 5.1.3.1.1 cabinets, Terminal cabinets, enclosures, UPS battery cabinet base hot-rolled angle steel, hot-rolled angle iron and steel production, the support base as a whole should be kept straight, the weld size overall dimensions meet the requirements should be the principle, Stent positioning and embedded parts after welding in prison. 5.1.3.1.2 bracket mounting holes required on arrival at the scene, cabinet base hole dimension processing. Enclosure base must be in the control room the control room floor before you start the installation to complete, and activities should be considered a floor support frame set match. Base installation errors shown in the table below. Permissible deviations mm/m items mm/full length straight level 1, 5, 1, 5, position error and parallel degree 5 5.1.3.2 system Panel, cabinet installation 5.1.3.2.1 unpacking and inspection (1) together with owners, supervision carried out jointly on behalf of the company, signed after the inspection opening inspection records; (2) before unpacking, on the surrounding floors, tables and chairs, tools, static elimination measures taken, check the device packaging is complete; upon opening the box, you should check if the packaging is damaged, whether the water, moisture-proof, shock-proof measures is good; (3) special tools should be used when opening the box, press level, in order to open packaging; be cautious, non-violent beating; (4) out of the box in accordance with the packing list one by one after an inventory of all hardware, spare parts, a random number of tools, models, specifications, should be consistent with the packing list; hardware looks good, no deformation, breakage, especially off defects such
郭涛&王岳伦&张亮:宝贝宝贝我是你的大树 一生陪你看日出
郭涛: 这是第一次当你的老爸
张亮: 我们的心情都有点复杂
王岳伦 : 你拼命发芽我白了头发
张&郭&王: 一起写下一撇一捺
郭子睿&王诗龄&张悦轩:老爸老爸我们去哪里呀 有我在就天不怕地不怕
郭涛&王岳伦&张亮:宝贝宝贝我是你的大树 一生陪你看日出
郭子睿: 我的老爸是个神话(郭涛:当然咯!) 王诗龄: 搞定老妈绝代风华(王岳伦:哈哈!) 张悦轩: 就算有天你掉光了牙(张亮:哎呦!)
&轩: 我也可以带你去火辣辣(郭&王&张:耶!) 睿&龄
郭子睿&王诗龄&张悦轩:老爸老爸我们去哪里呀 有我在就天不怕地不怕
郭涛&王岳伦&张亮:宝贝宝贝我是你的大树 一生陪你看日出
众: 啦啦啦啦啦啦啦
郭子睿&王诗龄&张悦轩:老爸老爸我们去哪里呀 有我在就天不怕地不怕
郭涛&王岳伦&张亮:宝贝宝贝我是你的大树 一生陪你看日出
personal safety and safety equipment. 5.1.1.6 construction overall arrangement of instruments (see the following figure) ... 5.1.3.1.1 cabinets, Terminal cabinets, enclosures, UPS battery cabinet base hot-rolled angle steel, hot-rolled angle iron and steel production, the support base as a whole should be kept straight, the weld size overall dimensions meet the requirements should be the principle, Stent positioning and embedded parts after welding in prison. 5.1.3.1.2 bracket mounting holes required on arrival at the scene, cabinet base hole dimension processing. Enclosure base must be in the control room the control room floor before you start the installation to complete, and activities should be considered a floor support frame set match. Base installation errors shown in the table below. Permissible deviations mm/m items mm/full length straight level 1, 5, 1, 5, position error and parallel degree 5 5.1.3.2 system Panel, cabinet installation 5.1.3.2.1 unpacking and inspection (1) together with owners, supervision carried out jointly on behalf of the company, signed after the inspection opening inspection records; (2) before unpacking, on the surrounding floors, tables and chairs, tools, static elimination measures taken, check the device packaging is complete; upon opening the box, you should check if the packaging is damaged, whether the water, moisture-proof, shock-proof measures is good; (3) special tools should be used when opening the box, press level, in order to open packaging; be cautious, non-violent beating; (4) out of the box in accordance with the packing list one by one after an inventory of all hardware, spare parts, a random number of tools, models, specifications, should be consistent with the packing list; hardware looks good, no deformation, breakage, especially off defects such
郭子睿&王诗龄&张悦轩:老爸老爸我们去哪里呀
你就是我的天大和地大
郭涛&王岳伦&张亮:宝贝宝贝时间的手一挥
你是永远的珍贵
大合唱:啦啦啦啦......
林志颖:一闪一闪亮晶晶
漫天都是小星星
林志颖&Kimi:Twinkle twinkle little star
How i wonder
林志颖:你又跑调咯~
林志颖&Kimi:(一起笑)
personal safety and safety equipment. 5.1.1.6 construction overall arrangement of instruments (see the following figure) ... 5.1.3.1.1 cabinets, Terminal cabinets, enclosures, UPS battery cabinet base hot-rolled angle steel, hot-rolled angle iron and steel production, the support base as a whole should be kept straight, the weld size overall dimensions meet the requirements should be the principle, Stent positioning and embedded parts after welding in prison. 5.1.3.1.2 bracket mounting holes required on arrival at the scene, cabinet base hole dimension processing. Enclosure base must be in the control room the control room floor before you start the installation to complete, and activities should be considered a floor support frame set match. Base installation errors shown in the table below. Permissible deviations mm/m items mm/full length straight level 1, 5, 1, 5, position error and parallel degree 5 5.1.3.2 system Panel, cabinet installation 5.1.3.2.1 unpacking and inspection (1) together with owners, supervision carried out jointly on behalf of the company, signed after the inspection opening inspection records; (2) before unpacking, on the surrounding floors, tables and chairs, tools, static elimination measures taken, check the device packaging is complete; upon opening the box, you should check if the packaging is damaged, whether the water, moisture-proof, shock-proof measures is good; (3) special tools should be used when opening the box, press level, in order to open packaging; be cautious, non-violent beating; (4) out of the box in accordance with the packing list one by one after an inventory of all hardware, spare parts, a random number of tools, models, specifications, should be consistent with the packing list; hardware looks good, no deformation, breakage, especially off defects such