清蒸三文鱼的做法
清蒸三文鱼的做法(10分钟开胃菜)
用到的材料有:
三文鱼......1块
洋葱......小个的半个左右
香菇......1朵
姜丝......少许
蒜末......少许,不必太多,2-3瓣 circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high
海鲜酱油......1小匙
白糖......少许
香菜末......少许(不放也可以)
做法:
circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high
1.材料特简单,一块三文鱼,再准备些香菇、洋葱、姜、香
菜、大蒜。把三文鱼切大块;洋葱切丝;香菇切片;香菜切
段;蒜切末;姜切丝。
2.取一个大盘,盘子不宜太浅,蒸鱼的时候会流出很多汤汁,
在盘子上铺上一层洋葱丝,再铺一层香菇片,最后撒上一些
姜丝。
circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high
3.把三文鱼放在洋葱丝、香菇片还有姜丝上,上锅蒸约6-7分钟。
4.取一个小碗,把刚刚蒸鱼流出来的汤汁倒进来,再放入切好的蒜末,点几滴海鲜酱油,加一点点白糖,拌匀然后淋在三文鱼上,撒少许香菜末就可以了,或者直接取鱼肉蘸着味汁食用。
简单点,再简单点-10分钟开胃菜清蒸三文鱼
circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high
circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high
circuit board by hand or tool, the operator shall take anti-static measures. 5.1.3.2.6 site the installation site should be installed in the enclosure with light, dry places, installation should be normal, smooth, firm, perpendicularity tolerance for 3mm/5M, horizontal gradient tolerance for 4mm/5M. 5.1.4 instrument cable tray and junction box install 5.1.4.1 cable channel should be according to the construction plan, Hsien Chu Rami. Construction should be carefully checked before the process piping and equipment layout, and check the cable trough the practical direction, ensure that the cable channel's direction and elevation do not conflict with the process piping and equipment, construction workers correctly. 5.1.4.2 slot must have the support, fixed support spacing should be 2 m, bends must have support bracket cannot be directly welded to a place with thermal expansion. 5.1.4.3 trunking interface connectors and bolts, and set appropriate expansion gap, all online slot bolt head should be inside. 5.1.4.4 slot into the control room should be fireproof and waterproof measures, online slots filled fire outside sealing mastic to prevent flammable gas into the control room. 5.1.4.5 slot when holes are needed, machining, electric and gas welding process shall not be used, open hole, the edges should be sanded smooth and touch up in a timely manner. 5.1.4.6 line after installing reliable earthing, grounding wire connected to the slot spacing shall not exceed 30m. 5.1.4.7 install junction box (1) should be installed in a light, dry place, the ambient temperature should not be more than 450C, box Center height from the ground to about 1100mm; (2) there should be good sealing practices, and identify number; (3) shall not affect the operation, maintenance and access, online slots should be installed on each side. 5.1.5 cable protection pipe preparation 5.1.5.1 instrument cable protection pipe should avoid high