为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

NVIDIA独立显卡机型外接HDMI显示设备(XP)

2017-11-29 18页 doc 342KB 8阅读

用户头像

is_337177

暂无简介

举报
NVIDIA独立显卡机型外接HDMI显示设备(XP)NVIDIA独立显卡机型外接HDMI显示设备(XP) NVIDIA独立显卡机型外接HDMI显示设备(Windows XP) 测试设备:ideapadY430A Windows xp sp2(专业版) 含音视频输出显示设备:明基E2400(1920*1080) 注意事项:插拔外接显示器和笔记本的HDMI接口时建议断电操作 设置方法: 1,使用HDMI线材连接显示设备和Y430A 2,连接好后把外接显示设备切换到HDMI接口的显示模式 3,右键点击桌面,选择nvidia控制面板,弹出视图选择(图一),选择高级设置点...
NVIDIA独立显卡机型外接HDMI显示设备(XP)
NVIDIA独立显卡机型外接HDMI显示设备(XP) NVIDIA独立显卡机型外接HDMI显示设备(Windows XP) 测试设备:ideapadY430A Windows xp sp2(专业版) 含音视频输出显示设备:明基E2400(1920*1080) 注意事项:插拔外接显示器和本的HDMI接口时建议断电操作 设置: 1,使用HDMI线材连接显示设备和Y430A 2,连接好后把外接显示设备切换到HDMI接口的显示模式 3,右键点击桌面,选择nvidia控制面板,弹出视图选择(图一),选择高级设置点击确定。 4,进入NVIDIA控制面板 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 5,点击多显示器运行向导,点击下一步。 6,选择分辨率,1080i最高,点击下一步。 7,选择显示模式,点击下一步。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 8,调节笔记本的分辨率,点击下一步。 9,询问是否预览,可以跳过,直接点下一步。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 10,设置完成,点击完成即可。 11,除了在向导之外,如果是扩展显示,可以在控制面板中点击更改分辨率调整外接分辨率。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 12,还有一些比较不常用的设置,如等比缩放,调节制式等,如下图。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 13,关于XP下HDMI声音输出的问题,Y430在切换成HDMI输出时,声音不会同步切换, 需要手动设置,如下设置: 点击控制面板,点击声音语音和音频设备 点击声音和音频设备 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order 在声音和音频设备属性选项卡中,选择音频,将默认设备调整为NVIDIA HDMI audio即可, 注意:HDMI未连接时NVIDIA HDMI audio不会出现。 from oil conservator rated. 4.1.12.10.3 oil is finished, should be set aside for 24 hours. 4.1.12.10.4 can be replaced after the transformer, cooling unit, gas relays and pressure release valve devices, exhaust gas related sites multiple times. 4.1.13 electric overall construction process chart, see next page. Turn off the security system, access to the site had to wear a helmet, aerial work have to fasten your seat belt. Using power tools, the shell shall be reliable grounding to prevent electric shock, do the construction site security, preventing mounted electrical components and material damage, such as lost, electrical simulation test and operation of the transmission, and carry out the operation and the tone system; ongoing safety and quality education, improving safety awareness to ensure smooth and safe, high quality finish. 4.3 projects 4.3.1 quality assurance measures preparation of construction organization design and construction program. Careful review of the drawings, in-depth understanding of site, construction workers doing construction gives the low-down, prior to construction as far as possible the problems right. 4.3.2 compliance with specifications, in accordance with the drawings, encountered in the process of unclear are not free to change, must inform the unilateral changes by the design department to modify. 4.3.3 site full-time quality inspector and team part-time Inspector on construction quality of electrical installation check, nonconforming areas for corrective actions in a timely manner until it reaches the required. 4.3.4 installed in well construction record, done self-inspection, mutual, total work quality appraisal work, improve the quality of workers and ensure the project progress in order
/
本文档为【NVIDIA独立显卡机型外接HDMI显示设备(XP)】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索