实物黄金图片展示
黄 金 介 绍
1. 黄金被成为“没有国界的货币”,以其独有的特性(不变质、易流通、保值、投资、储值)作为人们资产保值的工具之一。黄金是唯一的非信用货币,从古至今,深受全世界人民喜爱,具备货币和商品的双重属性。
2. 黄金是财富的象征。社会变迁、国家更迭、货币币种更换、黄金的价值是永恒的 。
3. 有效抵御通货膨胀。
4. 黄金是财富转移的有效方式。
附:我行黄金库存图片介绍:
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
1. 投资金条 规格:50克、100克、200克、500克 成色 99.99
此品种可代保管、回购。适合投资 收藏 馈赠。
2. 感恩金条(推荐婚庆)我行现有30克、50克。
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
3. 十二生肖金章套装 :10克 一套12枚 投资 收藏
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
十二生肖套装金章之一
生肖纪念金章(圆形)生肖纪念金章(圆形)
12生肖金章,每套12枚,可单独购买,每枚重量10克
4. 成长岁月(挂坠)我行现有规格:5克
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
5(连年有余金钱 我行现有规格:5克
6( 好运兔 我行现有规格:2克、5克
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
7. 龙钱 我行现有规格:2克、5克、10克。
8. 平安观音挂坠20g 有挂坠,可佩带。形状为方形。
9. 弥勒福佛挂坠18g 有挂坠,可佩带。形状为椭圆形。
这两款新品的图样省行未下发,但是图形为上面所展示的,实物有
挂坠、可佩带。
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive
temperature piping and equipment, avoid oil pipeline, avoiding vibration equipment, principles of construction of beautiful and neat easy to install. 5.1.5.2 from field instrumentation and valves field junction boxes to the single line slot cable using pipe, 220VAC power cord shall be full pipe laying, indoor coaxial cables concealed and outdoor wear buried. 5.1.5.3 bending cold bending method should be used to protect pipe, bending angle should not be less than 900, when wearing non-armoured cable and laid, bend radius should not be less than 6 times the pipe diameter, when while wearing armored cable and concealed, bend radius should not be less than 10 times the pipe diameter. Bend protection tube there should be no dents, cracks, single right-angled bend protection tube should not be more than two. 5.1.5.4 between protective tube and between protective tube and connector, threaded connections should be used, it tube end screw thread length should not be less than 1/2 of the fitting, and ensures the electrical connection. 5.1.5.5 protection tube should line up, ... 5.1.7 5.1.7.1 check tubing for pressure piping laying pipe, components, materials and specifications meet the design requirements, and have quality certificates, before laying should be cleared by welding and bending the welding slag, rust, chip or a foreign body, and preservative treatments. 5.1.7.2 in pressure piping welding welder must have a valid welder certificate. 5.1.7.3 tubing under the conditions to meet measurement requirements should be as short as possible, General length should not be more than 15m, pipe bending cold bending, cutting machine, minimizing bending and cross, and there shall be no sharp and complex bending, bending radius of not less than 3 times the pipe diameter. 5.1.7.4 pipe and process equipment, piping, or building surface distance is greater than 50mm, not be laid parallel to the oil, combustible, explosive