怪物猎人P3全装备(女战)是位76件套
上位4级套装【共15套】
结云?天套装~~~~~~~~~
轻皮S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
锁链S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
猎人S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
洛克拉克S套装(身、腰、腿3件套)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
骨制S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
合金S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
草食龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
垂皮S套装(头、身2件套)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
飞虫S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
狗龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
毒狗龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
白兔S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
钢铁S套装(身、腕、腰3件套)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
青熊S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
上位5级套装【共28套】
三眼套装(无外观显示)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
高级温泉套装(头、身、腕、腿4件套)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
南瓜S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
彩鸟S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
水兽S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
维金S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
抚子套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
土砂龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
眠狗龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
赤甲兽S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
雌火龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
店员S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
毒怪龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
飞虫S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
潜口龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
团栗S套装(头、身2件套)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
城塞游击队套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
神秘S套装(身、腕、腿3件套)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
高合金S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
迅龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
冰牙龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
雄火龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
爆锤龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
轰龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
角龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
雷狼龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
炎戈龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
尾槌龙S套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
,
上位6级套装【共12套】
彩鸟U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
水兽U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
冰碎龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
电怪龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
远古龙套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
绿迅龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
风牙龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
钢锤龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
黑轰龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
黑角龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
冻戈龙U套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
金属镶嵌套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
上位7级套装【共12套】
大海盗J套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
坊屋套装(身、腰、腿3件套)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
THE BOSS套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
优衣库套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
金火龙套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
银火龙套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
恐暴龙套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
日向?霸套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
霸龙套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
崩龙套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
煌黑龙套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
荒天套装
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
上位单件防具【共9件】
丸鸟面具S
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
大野猪面具S
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
狗龙面具S
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
骷髅面具S
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
龙王的独眼
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
黑暗之眼
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
狩猎战线夹克
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
漆黑轻皮具足
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
怪物猎人部大衣
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
剑士隐藏头部防具
7级装备剑圣耳环(无展示外观)
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
,
spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld