为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

怪物猎人P3全装备(女战)是位76件套

2017-08-30 50页 doc 1MB 45阅读

用户头像

is_842972

暂无简介

举报
怪物猎人P3全装备(女战)是位76件套怪物猎人P3全装备(女战)是位76件套 上位4级套装【共15套】 结云?天套装~~~~~~~~~ 轻皮S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process s...
怪物猎人P3全装备(女战)是位76件套
怪物猎人P3全装备(女战)是位76件套 上位4级套装【共15套】 结云?天套装~~~~~~~~~ 轻皮S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 锁链S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 猎人S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 洛克拉克S套装(身、腰、腿3件套) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 骨制S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 合金S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 草食龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 垂皮S套装(头、身2件套) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 飞虫S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 狗龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 毒狗龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 白兔S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 钢铁S套装(身、腕、腰3件套) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 青熊S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 上位5级套装【共28套】 三眼套装(无外观显示) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 高级温泉套装(头、身、腕、腿4件套) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 南瓜S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 彩鸟S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 水兽S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 维金S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 抚子套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 土砂龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 眠狗龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 赤甲兽S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 雌火龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 店员S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 毒怪龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 飞虫S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 潜口龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 团栗S套装(头、身2件套) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 城塞游击队套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 神秘S套装(身、腕、腿3件套) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 高合金S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 迅龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 冰牙龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 雄火龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 爆锤龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 轰龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 角龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 雷狼龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 炎戈龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 尾槌龙S套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld , 上位6级套装【共12套】 彩鸟U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 水兽U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 冰碎龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 电怪龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 远古龙套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 绿迅龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 风牙龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 钢锤龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 黑轰龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 黑角龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 冻戈龙U套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 金属镶嵌套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 上位7级套装【共12套】 大海盗J套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 坊屋套装(身、腰、腿3件套) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld THE BOSS套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 优衣库套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 金火龙套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 银火龙套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 恐暴龙套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 日向?霸套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 霸龙套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 崩龙套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 煌黑龙套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 荒天套装 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 上位单件防具【共9件】 丸鸟面具S spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 大野猪面具S spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 狗龙面具S spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 骷髅面具S spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 龙王的独眼 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 黑暗之眼 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 狩猎战线夹克 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 漆黑轻皮具足 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 怪物猎人部大衣 spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld 剑士隐藏头部防具 7级装备剑圣耳环(无展示外观) spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld , spot welding, spot welding fittings mat must be placed firmly before, to avoid forced groups to arise, additional stress caused by crack. (5) the Groove position welds and welding the same welding process should be adopted, by qualified Welders and welding. Tack weld should be evenly distributed, there is generally no less than 2-3, length should be to 10-15mm, uniform distribution, wall thickness of no more than 2/3. (6) the tack should ensure good penetration and fusion, and free of porosity, slag and other defects. (7) to ensure the bottom bead molding well to reduce stress concentration, tack should be a smooth transition to the base metal and welds polished at both ends should be generated. (8) unless the process or inspection required-welded, but each seam continuous welding finish, otherwise again before welding, to preheat the weld. (9) the welding arc scraped surface is strictly prohibited, without any introduction arc welding on the surface. (10) should ensure that the arc and arc welding of quality, arc should fill crater, multi-pass welding joint should be staggered. (11) Tig welding should be ventilated in advance, expired after welding should be delayed, and should ensure that the welding in the welding process melts to get effective protection of argon gas. (12) when using the multi-pass welding, weld before should be cleaned, after making sure that no defects, and again the next. (13) the weld should be a smooth transition to the base metal and weld both ends ground into slope. (14) card with the welding, the material should be identical to the base metal, and at the time of demolition cards should not damage materials and residues in the welding scar on the base metal polished fixed flush to the base metal. (15) the finished weld, weld
/
本文档为【怪物猎人P3全装备(女战)是位76件套】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索