西南证券股票账户手机网上开户
1.下载手机开户软件并安装
2.输入您的手机号码并点击【获取验证码】按钮:
3.拍摄身份证,上传身份证照片
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
4.选择营业部:客户可手动点击“附近”来查看附近的营业部进行选择;也可以
在营业部列表中选择需要开户的营业部,或者通过关键字查找营业部。
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
5.填写基本资料
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
6.视频实名验证:点击【人工见证】,进入视频验证界面
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
7.视频验证通过后,视频验证页面提示“视频验证通过请进行下一步”
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
8.继续完成开户操作,进入设置数字证
密码页面
9.安装数字证书:设置完数字证书密码之后进入数字证书安装页面。
10.证书安装完成后,点击【下一步】,跳到设置账户+签署
页面,
新开户,支持股股票帐户和基金帐户的选择
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
11.设置交易密码
12.选择签约银行
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
13.选择快捷签约
14完成风险测评
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
15.查询开户状态
提交开户申请后,可查看用户的开户状态以及用户提交的开户申请信息
16.后台对开户申请审核复核通过,完成开户
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run
pump running States real-time automatic monitoring and advanced system of energy-saving control, distributed computer control system the system, consists of field sensors and actuators, direct digital control (DDC), communication network, the Central operator station consists of four parts. Building control room located in the medical synthesis building first floor, combined with the fire services communication centre, which consists of Central station, devices such as printers, UPS power. Clean air conditioning for the normal operation of the unit in order to ensure that the operating room, surgical equipment in four layers laminated construction equipment management system monitoring station. Building equipment monitoring system (BAS) of main monitoring content frozen water system monitoring: refrigerator of Kai stopped control; steam pressure detection; according to buildings by needed cold load automatically adjustment cold water unit of run Taiwan number; electric butterfly valve, and cooling pump, and cooling tower, and frozen pump and the cold water unit of order Kai stopped control; according to cooling water of temperature automatically Kai stopped cooling tower fan and the control cooling water for backwater duct bypass valve of open degrees; frozen water of load regulation; expansion tank level control; cooling water frequency fill pump monitored,. (This system by frozen station manufacturers completed frozen water system of monitoring, set a frozen station points station, points station host through communications conversion unit put about data to building equipment management system host) clean air conditioning unit monitoring (four control): Unit sent wind machine of Kai/stopped control, and monitored fault, and run