为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

茅盾文学奖作品

2018-01-17 16页 doc 252KB 19阅读

用户头像

is_079973

暂无简介

举报
茅盾文学奖作品茅盾文学奖作品 茅盾文学奖 第一届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems insta...
茅盾文学奖作品
茅盾文学奖作品 茅盾文学奖 第一届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic 第二届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic 第三届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic 第四届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic 第五届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic 第六届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic 第七届茅盾文学奖获奖作品 as corrosion, damp; information, instructions, drawings are complete. 5.1.3.2.2 install (1) civil engineering construction is completed, cabinet base, bracket installed, meets the design requirements; (2) air conditioning systems installation finished, under normal operating conditions, indoor temperature and humidity reach system requirements; (3) power and interior lighting is put into normal operation of the system; (4) finished construction of the grounding system, grounding resistance meets the design requirements (less than 4 ohms). 5.1.3.2.3 instrument enclosure using bolts based on the weld is strictly prohibited. Instrument disc cabinet installation of allows deviation see Xia table: instrument disc cabinet installation of allows deviation project allows deviation (mm) vertical degrees <1.5 level deviation adjacent two disc top Department < 20% column disc top Department <5 disc surface deviation adjacent two disc side < 10% column disc surface < 5 disc indirect sewing <2 5.1.3.2.4 internal cable laying wiring (1) control room internal cable including grounding line, and signal line, and power line and dedicated cable, wiring requirements neatly beautiful, and line standard specifications consistent, wiring right firm; (2) check the intrinsically safe circuit, confirm with the system cable and terminal block of the color (usually blue) meet the requirements, connection of intrinsically safe circuits shall ensure that safe areas isolated from the danger zone; (3) safety grounding, earthing according to design drawings and system technical requirements for construction, equipment grounding ... Hardware checks at the factory set DIP switch position should be recorded and the hardware address switch, swap cards must not directly touch the electronic
/
本文档为【茅盾文学奖作品】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索