为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

韩语专业术语金融化妆品

2017-10-17 27页 doc 86KB 25阅读

用户头像

is_737352

暂无简介

举报
韩语专业术语金融化妆品韩语专业术语金融化妆品 04:33韩国语单词分类:(1)金融 [??] 银行?? 1. 提款机????? 2. 服务台??? 3. 柜台??? 4. 开户??? ??? 5. 存钱?? 6. 领钱?? 7. 缴钱?? 8. 转账?? 9. 借贷?? 10. 抵押?? 11. 利息?? 12. 定期存款???? 13. 兑换外币?? 14. 美元???? 15. 汇率?? 16. 手续费??? 17. 护照?? 18. 身份证????? 19. 印章?? 20. 驾驶执照????? 21. 存折?? 22. 信用卡???? 2...
韩语专业术语金融化妆品
韩语专业术语金融化妆品 04:33韩国语单词分类:(1)金融 [??] 银行?? 1. 提款机????? 2. 服务台??? 3. 柜台??? 4. 开户??? ??? 5. 存钱?? 6. 领钱?? 7. 缴钱?? 8. 转账?? 9. 借贷?? 10. 抵押?? 11. 利息?? 12. 定期存款???? 13. 兑换外币?? 14. 美元???? 15. 汇率?? 16. 手续费??? 17. 护照?? 18. 身份证????? 19. 印章?? 20. 驾驶执照????? 21. 存折?? 22. 信用卡???? 23. 金融卡???? 24. 汇票??? 25. 支票?? 26. 旅行支票????? 27. 新钞? ?? 28. 旧钞? ?? 29. 硬币?? 30. 面值??? 31. 到银行取款 ??? ?? ?? ?? 32. 把钱存在银行 ??? ?? ??? ........................ 1. ?? ??; 活期存款 =往来存款 2. ?? ?? ??; 个人存款 3. ?? ?? ??; 小额活期存款 4. ???; 存款户 5. ?? ??; 存款 6. ?? ??; 定期存款 7. ?? ??; 储蓄存款 8. ?? ??; 账款 9. ?? ??; 存款利息 10. ?? ??; 提取存款 11. ?? ?? 存折 =存款单 =存款本子 12. ?? ?? 存款总额 13. ?? ??; 预算总额 14. ?? ??; 工资 1. ?????? ?? ?. ???? ?? 汇兑清算表 : ?????(exchange table, conversion table) 汇价(汇,) : ??(exchange rate) 法定汇, : ????(official exchange rate) 现行汇, : ????(current exchange rate) 固定汇, : ????(fixed flat rate) 银行买价 : ????(buying rate) 银行卖价 : ????(selling rate) 浮动汇, : ????(floating rate) 中心汇, : ????(central rate) 开盘汇, : ????(opening rate) 收盘汇, : ????(closing rate) 中间汇, : ????(mid-point rate, middling rate) 名义汇, : ????(nominal rate) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 外汇期货交易 : ??????(forward exchange transaction) 升 水 : ????(premium) 外汇折算, : ?????(foreign exchange coefficient, conversion rate) 贴现(贴水) : ??(discount) 再 贴 现 : ???(rediscounting(bills of exchange) 涕泫经纪人 : ?????(discount broker) 银行贴现 : ????(bank discount) 贴现,市 : ????(discount market) 套 汇 : ????(arbitration of exchange, cross exchange) 套汇汇, : ??????(cross rate, arbitrage rate) 外汇储备 : ?????(foreign currency (exchange) reserve) 结 汇 : ????(settlement of exchange) 外汇收支 : ????(balance of exchange) 浮 动 : ??(float) 2. ??? ?? ?? (1) ? ? 汇 款 : ??(remittance) 邮政汇款 : ??? ??(postal remittance) 电 汇 : ???(telegraphic transfer, T/T) 外单电汇 : ????? ??? ??? 外单押汇 : ?????? ?? ???? 委托付款书 : ?? ????(authority to pay) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 委托购买证 : ?? ????(authority to purchase, A/P) 银行信用保证书(保函) : ???(letter of guarante, L/G) 信 用 卡 : ????(credit card) 信 用 证 : ???(Letter of credit, L/C) 开 证 : ??? ??(establishment of L/C, opening of L/C) 审 证 : ??? ??(examination of L/c) 信用证有效期 : ??? ????(expiry date of L/C) 让 与 书 : ????(letter of assignment) 转让手续费 : ?????(transfer commission) 租 船 人 : ?????(charterer) 租船 : ??????(charter party) 交 货 单 : ???????(delivery order, D/O) 海运保险单 : ??????(marine insurance policy : MIP) 打 : ??(dozen) 正 本 : ??(original) 复 样 : ??(copy) ,可抗力 : ????(force of majeure) (2) ???? ?? 外单信用证 : ?????(documentary L/C) 可撤销外单信用证 : ???? ?????(revocable documentary L/C) ?,可撤销外单信用证(irrevocable documentary L/C) 偿付信用证 : ?????(reimbursement L/C) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 保兑信用证 : ?????(confirmed L/C) ?,保兑信用证(unconfirmed L/C 指定议付信用证 : ?? ???(restricted negotiable L/C) 可转让信用证 : ???? ???(transferable L/C) ?,可转让信用证(non-transferable L/C) 无限制转让信用证 : ??? ???? ???(without restriction L/C) 可分割信用证 : ???? ???(devisible L/C) ?,可分割信用证(non-divisible L/C) 对背(从属)信用证 : ??(??)???(back to back L/C, subsidiary L/C) 即期信用证 : ??? ???(sight L/C) 迟付即期信用证 : ?? ?? ??? ???(deferred sight L/C) 远期信用证 : ??? ???(usance L/C) 预支信用证 : ??????(anticipatory L/C) 红条款信用证 : ?? ?? ???(red clause L/C) ,条款信用证 : ?? ?? ???(green clause L/C) 循环信用证 : ?????(revolving L/C) ?,循环信用,(fixed L/C) 议付信用证 : ???? ???(notiable L/C) 带电汇条款信用证 : ??? ?? ?? ??? ?? ???(with T/T reimbursement clause L/C) (3) ???? (?) ????? ????(E, F?) (出口国)仓库交货 : (???)????????(ex warehouse : EXW) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain (装运港)船边交货 : ??????(free alongside ship : FAX) (出口国)工厂交货 : (???)????????(free at factory : FAF) 离 岸 价 : ??????(free on board : FOB) (目的港)码头交货 : (???)????????(free of charge : FOC) 火 车 边 交 货 : ??? ??????(free on rail : FOR) 船 边 交 货 : ?? ??????(free on stramer : FOS) (?) ???? ????(C?) 成本加保险费和运费价(到岸价) : ?????? ????(cost, insurance, freight : CIF) 到岸价加汮, : ?????????? ????(cost, insurance, freight and commission : CIF & C) ?. ?? ?? ?? 1. ? ? 人寿保险(人险) : ????(life insurance) 物产保险(产险) : ????(property insurance) 养老保险 : ????(endowment insurance) 火灾保险(火险) : ????(fire insurance) 全 损 险 : ????((insurance against) total loss only(TLO)) 一般保险 : ????(general insurance) 商业保险(实业保险) : ????(business insurance) 渔业保险 : ????(fishery insurance) 飞机, 船舶保险 : ???, ????(hull insurance) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 航空保险 : ????(aviation insurance) 再 保 险 : ???(re-insurance) 随意保险 : ????(facultative reinsurance) 超损失分保 : ????(excess-loss reinsurance) 双重(重复)保险 : ????(double insurance) 草果货値的保险 : ??? ??? ???? ??(over insurance) 限额以下,赔保险 : ????? ???? ?? ??(excess insurance) 汽车保险 : ?????(auto insurance) 意外事故保险 : ????(accident insurance) 邮包运输保险 : ????????(parcel post) 窃盗保险 : ????(burglary insurance) 雇用债务保险 : ????(employer's liability insurance) 因公伤亡保险 : ??????(worker's compensation insurance) 失业保险 : ????(unemployment insurance) 水险(海运货物保险) : ??????(marine insurance, ocean marine cargo insurance) 对货物(合同,顶单等)的保险 : ??(??,???)??(insurance on goods(contract, order, etc.) 2. ???? ??? 保险公司 : ????(insurance company) 投 保 人 : ?????(insurance applicant) 保险经纪人 : ?????(insurance broker) 保险推销员 : ?????(insurance canvasser) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 保险索赔 : ????(insurance claim) 进口货物豫约保险公司 : ????????(general open insurance treaty for import cargo) ? 出口货物豫约保险公司 3. ???? ?? 保险批单 : ?????(insurance endorsement) 保 险 单(保险执据, 保险单据) : ????, ????(insurance policy) 可转让的保单 : ????????(transferable policy) 保险单据 : ????(insurance document) 保险凭证 : ?????(certificate of insurance) 概保单(总括保险单) : ??????(blanket policy) 保险,额未定保单(,定値保单) : ???? ???? ?? ????(unvalued policy) 4. ? ? 赔保险,的最高限额 : ?? ?? ?? ???(limit of indemnity) 保 险 期 : ????(insurance period) 保险合同 : ????(insurance treaty) 保险条款 : ????(insurance clause) 保险单的修改 : ????? ??(recertification of policy) ?. ?? ?? ?? 1. ??? ?? 往来银行 : ?????(corresponding bank) 承兑银行 : ????(accepting bank) 进出口银行 : ?????(import and export bank(EXIMBANK)) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 贴现银行 : ????(discount bank) 汇兑银行 : ????(exchange bank) 开证银行 : ????(issuing bank) 分期信贷公司 : ??????(finance house, finance company) 银行分行 : ?? ??(branch of bank) 银行支行 : ???(subbranch bank) 议付银行 : ????(negotiation bank) 保兑银行 : ????(confirming bank) 付款银行 : ????(paying bank) 票据交换所 : ?????(clearing house) 2. ?? ?? ?? 开 帐 户 : ??? ????(opening an account) 政府帐户 : ????(government account) 淸算帐户 : ????(clearance account) 存款人与银行的往来帐 : ???? ??? ???? 居民帐户 : ?????(resident account) ?非居民帐户 : ??????(non-resident account) 帐目编号 : ????(account number) 开支票帐户 : ???? ??(opening a checking account) 接收储蓄 : ??? ??(taking money on deposit) 定期存款 : ????(time deposit, savings account, deposit account) 定期存款单 : ??????(saving certificate) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 储蓄存款 : ????(savings deposit) 活期储蓄存款 : ????(current savings account) 小额活期存款 : ??????(petty current account) ,生利存款 : ?????(non-interest-bearing deposit) 提取存款 : ?? ??(making a withdrawal of a deposit) 取 款 单 : ?????(withdrawal order) 银行借贷余额 : ?? ??????(bank balance) 电脑控制的结帐系统 : ??(Giro) 支 票 簿 : ???(cheque book) 空白支票 : ????(blank cheque) 旅行支票 : ?????(traveller's cheque) 存 折 : ??(passbook, bankbook) ?. ?? ?? ?? 信贷市场 : ??????(credit market) 分期付款信贷 : ????????(installment credit) (消费者购物)短期信贷 : ??? ????? ?? ?? ????(consumer credit) 冻结信贷 : ???? ??(frozen credit) 款项转户 : ???? ????(credit transfer) 贷款最高限额 : ???????(credit line) 收紧信贷 : ???? ??(tightening credit) 信托帐户 : ????(trust account) 信托文件 : ????(trust instrument) ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 受托人(单位) : ???(??)(trustee) 成立信托 : ???? ??(setting up a trust, creating a trust) 到期的年, : ???? ??(annuity) 年,受惠人 : ?? ???(annuitant) 借贷来的资, : ??? ??(loan capital) 商业贷款 : ????(business loan) 抵押贷款 : ????(mortgage loan) 可偿还贷款 : ??????(redeemable loan) 一夜(卽还)贷款 : 1? ?? ?? ??(overnight loan) 应召即还的短期贷款 : ?? ??? ???? ?? ????(money at call and short notice 无息贷款 : ?????(interest-free loan) 无息或低息贷款 : ??? ??? ?? ??? ???? ??(soft loan) 逾期未偿债款 : ???? ?? ????(overdue loan) ,息(息,) : ??(interest) 法定,息 : ????(legal interest) 存款,, : ????(savings account rate) 贷款,息 : ????(interest on a loan) 应付,息 : ????(payable interest) 本 , : ??(principal) 信托抵押 : ????(trust mortgage) 担 保 品 : ???(security, cover) 韩国语单词分类:(2)外貌 [??] 1. 长头发? ?? 2. 短头发?? ?? 3. 卷头发?? ?? 4. 光头? ?? 5. 染发?? ?? 6. 身高? 7. 高?? ?? 8. 矮?? ?? 9. ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 体重??? 10. 胖???? 11. 瘦??? 12. 健壮???? 13 韩国语单词分类:(3),化妆品[???] 1. ??? 粉盒 2. ?? 粉扑 3. ??? 粉刷 4. ???? 粉饼 5. ??? 蜜粉 6. ????? 粉底液 7. ??? 盖斑膏 8. ???? 眉形 9. ?? 眉毛 10. ??? 眼睫毛 11. ?? ??? 加睫毛 12. ??? ? 睫毛刷 13. ?? ?? 眉毛夹子 14. ????? 眼线笔 15. ????? 眼影 16. ??? 腮红 17. ???? 护唇膏 18. ???口红 19. ????? 卸装霜 20. ???? 指甲油 21. ??? 去光水 22. ?? ?? 假指甲 23. ?? 香水 24. ?? 香精 25. ???? 古龙水 26. ?? 发雕 27. ?? 摩丝 28. ?????? 定型水 29. ?? 泡沫试 30. ???? 喷雾试 31. ?? 胶状 32. ??? 染发液护肤品 1. ??? ? 面膜 2. ?? ? 增白面膜 3. ???? ?? 保湿碧凝露、滋润霜 4. ??? ?? 洁面霜/奶 5. ?? ?? 爽肤水 乳液 6. ?? ?? 营养霜 7. ??? 防晒霜 8. ?? ??? 沐浴露 9. ????? 粉底液 10. ??? 口红 11. ???? 唇线笔 12. ?? ??? 眼影 13. ?? ??? 眼线笔 14. ???? 睫毛膏 15. ??? 粉饼 16. ?? ????? 湿粉饼 17. ??? 化妆水 18. ??? 精华素 19. ??? 洗甲水 20. ?? 棉花棒 21. ????? 指甲挫 22. ???? 指甲油 23. ??? (???? ????) 护肤乳(美白保湿) 24. ????? 抗紫外线 25. ????? 柔肤水 26. ???? ??? ?? 润面霜 27. ???? ?? 泡沫洁面乳 28. ??? 蜜粉 29. ??? 粉盒 30. ???? 白粉底 31. ?????? ? 毛孔收缩面膜 32. ?? ??? 护发素 33. ??????? 粉底 34. ?? 香粉 35. ??? 胭脂 36. ?????? 眉粉、眼形粉 37. ???? ? 眼线液 38. ????? 眉毛 39. ???? 立体绣眉 40. ? ?? 睫毛 41. ??? ?? 烫睫毛 42. ??? 化妆棉 43. ??? 腮红刷 44. ?? ?? 粉扑儿 45. ???? 睫毛夹 46. ??? ??? 化妆刷 47. ?? ? 修眉刀 48. ?? ???(????) 粉刺露 49. ???? 唇蜜 50. ? ?? 润唇膏 51. ?? ???? ?? ?? ???? 持久亮泽唇彩 52. ?? 摩丝 53. ??? ?? ?? 染发同时护发 54. ?? ????? 粉底霜 55. ???? 护手霜 56. ????? 眼影笔 57. ???? 眉线眼线两用笔 58. ??? 染发霜 59. ?? 面霜 60. ??????(????) 保湿爽肤水 61. ??? ?? ?? ??? 保湿型液体粉底 ???????? 62. ?? ???? 护肤水 ........... 1. ?? ?? 化妆水 2. ????? 收敛化妆水 3. ????? 保湿化妆水 4. ?? ?? 乳液 5. ?? ?? 防晒乳液 6. ?? ?? 身体乳液 7. ??? 防水性 8. ??? 亲水性 9. ?? ?? 护手霜 10. ????? 婴儿油 11. ?? ?? 眼霜 12. ?? ?? 日霜 13. ??? ?? 晚霜 14. ????? ??隔离霜 15. ?? ?? 防晒油 16. ?? ? 面膜 17. ?? ??? 敷脸 18. ??? ?? 隔离紫外线 19. ?? 美白 20. ???? 去角质 21. ???? 去油 22. ??? ?? 抗豆 23. ?? ?? 抗老化 24. ?? ?? 紧肤 25. ?? 保湿 26. ??? 青春痘 27. ??? 雀斑 28. ?? 黑斑 29. ?? 疤痕 30. ??? 皱纹 31. ? 痣 32. ?? 毛孔 33. ??? 油性皮肤 34. ???? 干性皮肤 35. ????? 混合性皮肤 36. ????? 过敏性皮肤 37. ??? 化妆棉 韩国语单词分类:(4)疾病 [??] 1. 发烧??? 2. 头痛?? 3. 咳嗽?? 4. 流鼻涕?? 5. 感冒?? 6. 呕吐?? 7. 便秘?? 8. 腹泻?? 9. 肚子痛? ??? 10. 食物中毒??? 11. 心脏病??? 12. 高血压??? 13. 糖尿病??? 14. 气喘?? 15. 扭伤?? 16. 骨折?? 17. 跌倒???? 18. 车祸???? 19. 牙齿痛?? 20. ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain 蛀牙?? 21. 烫伤?? 22. 流血?? ??? 23. 近视?? 24. 远视?? 韩国语单词分类:(5)?? 1. 宇宙 ?? 2. 地球 ?? 3. 月球 ? 4. 太阳 ?? 5. 银河 ??? 6. 行星 ?? 7. 星星 ? 8. 流星 ?? 9. 彗星 ?? 10. 日蚀 ?? 11. 月蚀 ?? 12. 大气层 ??? 13. 赤道 ?? 14. 北极 ?? 15. 南极 ?? 16. 太空船 ??? 17. 卫星 ?? 18. 水瓶座 ???? 19. 牧羊座 ???? 20. 巨蟹座 ??? 21. 双鱼座 ????? 22. 双子座 ????? 23. 金牛座 ???? 24. 狮子座 ???? 25. 天秤座 ???? 26. 处女座 ???? 27. 射手座 ???? 28. 天蝎座???? 29. 魔蝎座???? 韩国语单词分类:(6),情绪 [??] 1. 爱???? 2. 喜欢???? 3. 高兴??? 4. 兴奋???? 5. 幸福???? 6. 期待???? 7. 想念??? 8. 生气??? 9. 愤怒???? 10. 恨???? 11. 讨厌??/?? 12. 嫉妒???? 13. 羡慕??? 14. 紧张???? 15. 悲伤??? 16. 难过??? 17. 忧郁???? 18. 烦恼???? 19. 害怕??? 20. 担心???? 21. 压力???? 22. 害羞??? 23. 快乐??? 24. 大笑???? 25. 微笑???? 26. 欢笑?? 韩国语单词分类:(7)电影 [??] 1. ?? 电影院 2. ?? 电影 3. ??? 古装片 4. ??? 时装片 5. ??? 喜剧片 6. ???? 恐怖片 7. ???? 战争片 8. ???? 武打片 9. ????文艺爱情片 10. ???? 卡通片 11. ???? 政治片 12. ????? 科技片 13. ??悲剧 14. ??? 默剧 15. ??? 推理片 16. ????? 校园片 17. ???? 得奖片 18. ??????? 片 19. ????坎城影展 20. ?????????? 奥斯卡金像奖 21. ????宣导片 韩国语单词分类:(8)时间、方位 1. ?? 今天 2. ?? 明天 3. ?? 昨天 4. ?? 夏天 5. ?? 秋天 6. ?? 下午 7. ?? 夜间 8. ?? 从前 9. ?? 最近 10. ?? 这里 11. ?? 那里 12. ? 后边 13. ?? 位置 ,月 ?? ,月 ?? ,月 ?? ,月 ?? ,月 ?? ,月 ?? ,月 ?? ,月 ?? 9 月 ?? 10月 ?? 11月 ??? 12月 ??? 韩国语单词分类:(9)代词, 疑问词,形容词及副词 ---代词 1. 我 ?,? 2. 我们 ??,???,??,??? 3. 我们的 ??? 4. 你(您) ?,??,??,??,?? 5. 你们 ?,??,???,???,???,???,??? 6. 它 ?? 7. 她 ??,??,?? 8. 他 ?,??,?? 9. 他的 ?? ---疑问词 1. ?? 哪里 2. ? 为什么 3. ?? 谁 4. ?? 什么 5. ?? 什么时候 ---形容词及副词 1. ?? 辛苦 2. ?? 愉快 3. ??? 悲伤 4. ?? 痛 5. ??? 冷 6. ??? 热 7. ?? 坚固 8. ? 好 9. ? 长 10. ? 短 11. ????? 健康 12. ?? 真的 13. ??? 瘦 14. ?? 容易 15. ?? 赶快 16. ?? 再,又 17. ?? 太 18. ?? 渐渐 19. ??? 清楚地 20. ?? 很,非常 21. ?? 非常 ----常用动词 ?/? 来/去 ?/? 有/没有 ?? , ??? , ?? , ?? 听/说/读/写 ??? / ?? 问/回答 ? / ? /?? 吃/住/走 ?? 见 ?? 买 ? 笑 ?/? 打(球)/打(电话) ? 成了,当了 ?? 学习(learn) ?? 学习(study ith. 3, fill embankment before base and completed the inspection and acceptance of works. 4, before the requirement level elevation sign layout according to the drawing, every nail on the level of a certain distance, elevation of forklift parts according to the design requirements set. 5, according to the site conditions determine the routes of earth-moving machinery, vehicles, and prior checks, reinforce and widen if necessary and other preparatory work. (B) construction processes and methods; 1, process: before filling, and statistics to the existing buildings and trees, the soil on the cave or on the surface of roots, trash and other debris to be cleared. 2, have the soil inspection work. Species of fill, size, check there is no debris, and soil moisture content control within the design range. Tier 3, fill casting: each layer thickness according to soil, density to determine requirements and equipment performance. 4, as needed when rolling, wheel (RAM) track lapping each other, prevent leaks RAM leakage. Aspect is high, filling segments. Each layer into slope-shaped seams, ground track about overlapping 0.5-1.0M, is less than the distance from the upper and lower joints 1M. 5, fill out the base surface, we will do the edge compaction quality assurance work. After the earth-moving, does not require trimming of the slope would be preferable to filling edge fill 0.5 m wide called slope rides on and shoot, wide filling 0.2m. 6, in machinery construction not rolling the filling position, manual blade filled with frog-type ramming machine or diesel hierarchical dynamic compaction-compacting. 9, rain during construction: (1) in the rain during embankment construction, we will be completed as soon as possible a continuous; face do not seek too large, hierarchical segment-by-film basis, important or special backfill, as completed by the rain. (2) in the rain at the time of construction, check all the rain
/
本文档为【韩语专业术语金融化妆品】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索