为了正常的体验网站,请在浏览器设置里面开启Javascript功能!

AMOLED屏幕和SLCD屏幕显示性能测试

2017-09-21 24页 doc 393KB 22阅读

用户头像

is_597436

暂无简介

举报
AMOLED屏幕和SLCD屏幕显示性能测试AMOLED屏幕和SLCD屏幕显示性能测试 2010-09-15 08:14:03 来源: TOMPDA智能手机网(北京) 跟贴 6 条 手机看新闻 7月份,HTC曾经宣布从今年夏末开始,将在旗下生产的一些手机上使用索尼制造的SLCD(Super LCD)液晶屏幕,替代之前使用的三星AMOLED,因为三星供应不足的问题实在让HTC受不了了。而在介绍索尼SLCD屏幕时,HTC只介绍了其省电的优势,而诸如色彩还原、显示效果等等一概没谈,这对于想要购买HTC Desire的朋友们就非常为难了,因为8月以前生产的HTC Desir...
AMOLED屏幕和SLCD屏幕显示性能测试
AMOLED屏幕和SLCD屏幕显示性能测试 2010-09-15 08:14:03 来源: TOMPDA智能手机网(北京) 跟贴 6 条 手机看新闻 7月份,HTC曾经宣布从今年夏末开始,将在旗下生产的一些手机上使用索尼制造的SLCD(Super LCD)液晶屏幕,替代之前使用的三星AMOLED,因为三星供应不足的问实在让HTC受不了了。而在介绍索尼SLCD屏幕时,HTC只介绍了其省电的优势,而诸如色彩还原、显示效果等等一概没谈,这对于想要购买HTC Desire的朋友们就非常为难了,因为8月以前生产的HTC Desire采用的是三星AMOLED屏,而8月之后生产的HTC Desire则采用的是索尼SLCD屏幕,到底哪个更好呢,日前Engadget网站用分别采用SLCD和AMOLED显示屏的HTC Desire进行了对比。 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 在亮度和饱和度方面,三星的AMOLED屏幕确实领先。 色调方面,索尼SLCD屏幕较暖,而三星AMOLED屏幕较冷。 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 对比度方面,索尼SLCD屏幕对比度比较高,在深黑色显示下可以看得比较清楚。 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 视角测试方面,三星AMOLED屏幕和索尼SLCD屏幕并没有什么差别,在纵向显示 下,索尼SLCD屏幕比三星AMOLED效果好,不过在横屏模式下,三星AMOLED又比索 尼SLCD屏幕现好。 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 很多朋友都知道在强光下,手机屏幕通常是看不清楚的,在将使用AMOLED和SLCD 屏幕的两款HTC Desire手机设置到最大屏幕背光亮度后,用强光照射,结果是三星AMOLED 屏幕要比索尼SLCD屏幕显示的清晰的多。当然,大家还是避免在户外强光下查看手机屏 幕,因为这势必将消耗掉更多的电量。 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 在电池续航能力测试上,我们将采用SLCD和AMOLED显示屏的两款HTC Desire手 机都打开飞行模式,禁用自动关闭屏幕并设置亮度至中等,关闭后台运行程序,然后同时循 环播放一部电影,直到有其中一部手机自动关机,最后的结果仍然是三星AMOLED屏幕更 加省电,在坚持了5个小时后,使用索尼SLCD屏幕的HTC Desire手机就没电自动关机了, 而这时使用三星AMOLED屏幕的HTC Desire手机尚有30%的电量,在交换两部手机的电 池之后测试的结果仍然如此,所以可以确定确实三星的AMOLED屏幕更加省电。 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 综合来看,其实在显示效果上两款屏幕差距并不是很大,三星AMOLED的色彩还原 确实更加清晰真实,强光模式下表现也很出现,不过索尼SLCD的显示效果更加明亮,色 彩更加丰富,不过要真选择一款屏幕的话,无疑还是三星AMOLED屏幕更好,无论是它的 显示能力还是节电性能都更加适合手机使用。 (本文来源:TOMPDA智能手机网 ) be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly
/
本文档为【AMOLED屏幕和SLCD屏幕显示性能测试】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索