为了正常的体验网站,请在浏览器设置里面开启Javascript功能!
首页 > 联想一键恢复7

联想一键恢复7

2018-03-22 27页 doc 136KB 9阅读

用户头像

is_841159

暂无简介

举报
联想一键恢复7联想一键恢复7 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button s...
联想一键恢复7
联想一键恢复7 security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 联想一键恢复7.0工程师版的安装方法 一、安装OKR7的过程: 打开计算机调出启动菜单~选择光盘或USB设备启动。按照程序提示进行安装模式选 择后进行安装全过程,包括:ASD模块安装、磁盘分区、复制OKR7的PE模块、设置语言、隐藏O盘,~并在安装完成后关机: 使用全新安装模式安装OKR7时~磁盘分区脚本对硬盘进行分区的模式为: C盘:根据手动输入的分区大小划分~ NTFS~主分区~卷标为默认。 D盘:根据脚本定义自动划分~容量为磁盘总容量,15G,C盘容量~文件为NTFS, 扩展+逻辑分区~卷标为默认。 O盘:约15G~NTFS~主分区~卷标为LENOVO_PART 安装OKR7的过程包括两种模式:全新安装、修复安装 1,全新安装: WIN PE启动过程中~调用STARTNET.CMD查找OKR7系统安装文件路径并调用SETUP.CMD启用OKR7的安装进程:此时系统会弹出如下图的选择框来进行安装模式选择。 安装方式选择,选择1为全新安装~2为修复安装,. security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) “1”:全新安装。此模式会清空硬盘上原有的所有分区~并根据脚本定义对硬盘重新分区、 格式化等操作。 “2”、修复模式。此模式要求硬盘末端有约15G未划分空间,安装程序会对这部分未划分 空间重新划分、指驱动器号及卷标。 “3”、修复ASD模块。 在进行全新安装时~安装程序会弹出对话框,如下图,~要求输入C盘大小~单位以MB计算,并根据所输入的C盘容量及整个硬盘的容量来自动进行D盘和O盘的建立。需要注意的是安装程序此时会清除原硬盘上的所有数据~其中包括全部的系统数据及用户数据~并会按照预定参数在硬盘上建立分区。,C、D、O, C:盘容量设置,填入C盘容量~以MB为单位,. open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 2,修复安装: 在程序弹出安装模式选择对话框时~如果选择“2”~安装程序会调用SETUP2.CMD 进行修复安装~修复安装时硬盘分区应满足以下条件: 硬盘末端预留约15G的未划分空间。,此容量可根据实际需求做小幅修改, 此时安装程序不会弹出输入C盘大小的对话框。其它步骤同全新安装: 语言设置: 在OKR7的安装过程中~安装程序会弹出下图所示的对话框来选择安装后 OKR7系统所使用的语言。 安装语言选择,选择21是简体中文,. security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) ?、调用OKR7系统进行工厂备份 调用OKR7进行工厂备份前~我们就该先做一些小的检查。 A、查看O盘目录下是否有”SYSMODE.INI”~此文件是OKR7系统判定是否需要进行工厂 备份的标识文件,如果没有请从O:NBFPRO_BK拷贝此文件到O盘根目录下。 B、查看O:ONEKEYMAIN下是否有”CALLFACTORY.CMD”~此文件是进行工厂备份批处 理文件,如果没有请从O:NBFPRO_BK拷贝此文件到O:ONEKEYMAIN目录下。 如查以上条件满足~那么OKR7会在安装后首次调用时自动进行系统盘的工厂备份。 那么是不是OKR7系统进行了首次的工厂备份后~我们就不能再进行工厂备份了呢,其实不是这样的~我们可以通过手动执行OSIMAGE.EXE的方法重新进行工厂备份,方法如下: 首先按 调用OKR7系统~然后进入“一键恢复”模块~按CTRL+LIFT SHIFT+O调用命令行模式~找到OKR7所在分区,此时虽然OKR7所在分区为隐藏属性~查仍能看到里面的。盘符一般为硬盘现有分区+,或+,.如:硬盘上open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) 有C盘、D盘~那么OKR7所在盘符就应为E或F,~进入{drv}:onekeyosimage 目录~执行OSIMAGE.EXE /FB进行工厂备份。请注意~此方法不面向客户: 注意事项: 上文中所提到的“OKR7全新安装”会清除原硬盘上的所有分区及数据~其中会包括所有系统数据及用户数据~所以使用时请确认硬盘上的所有数据是否可以全部删除。 另外~在进行OKR7的全新安装后~OS安装需要单独进行: 二、OKR7.0安装盘制作:下载OKR.ISO文件后~选择使用UltraISO写入U盘或刻录成光盘使用。 三、FAQ: • Q:OKR 7.0系统不能进行工厂备份~提示”No service partiton”, • A:遇到此情况时~请检查O盘是否已做隐藏处理: • Q:OKR 7.0系统不能进行工厂备份~提示”Find os partiton fail”, • A:遇到此情况时~请检查C是否已完成OS安装:如OS已成功安装~可尝试运行以下命令行:BCDBOOT C:WINDOWS /L {language},language:当前系统所使 用的语言~如:zh-cn,后重新进行工厂备份: • Q:按 进入OKR 7.0系统时不能调用OKR 7.0主界面~而直接进入WIN PE命令行模式, • A:遇到此情况时~请检查O盘卷标是否为”LENOVO_PART”: • Q: 部分机型出厂仅安装了FREEDOS~用户会自行安装或选择委托维修站安装其 它操作系统~这时还可以将安装好的操作系统进行工厂备份吗,A:根据工厂定义~预装FREEDOS的机型~OKR7所在分区仅为1G左右。这样不能满足WINDOWS系统的备份要求~所以如果想要备份就必须重新划分隐藏空间。建议与确认数据不重要后~选择全新安装OKR7~并重新安装或布署操作系统并备份: security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1) security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt ... (2) power cord into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the "power", "illumination", "welding". 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the "black" or "green/Huang Shuang-color" line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)这是工程师版的~需要从光驱或优盘启动进行安装~不可以在windows环境下安 装。 open pit operation should be set up-and rain-proof body combat operations, and positive security rope fence. (2) must be equipped with the such as open storage should be tightly covered, transportation and shipment to prevent the impurity of flying in order to reduce dust. 4.4 measures to prevent water pollution: 4.4.1 mixing wastewater discharge control: emissions of wastewater discharged into the sedimentation tank in the second ... BA, labor scheduling and measure 1, labour demand: calculated according to the schedule of the project, preparation takes about 2,400 labor days, said today it will mop up to 2,100. About the project, total said today it will need 92,600. According to the construction schedule, peaked on the 15th day of labour to the 45th day. This phase focuses on engineering subgrade earthwork, drainage, manhole in construction labor demand up to 880 days/day, need to focus on labor guarantee. We arrange production on this issue that, wherever possible, machinery in order to reduce the amount of labor needed, restrict contracts through legal procedures, and measures to improve the treatment, ensure the necessary labor to maintain normal production. In order to ensure the quality of the workforce must have a certain number of technical workers. 2 2.1 establishment of workers ' wages, labor organizations and arrangements to ensure system: Project Manager and construction team, the teams and personal signature guarantee timely and full payment of wages of migrant workers undertaking signed on the protection of workers ' wages with the owners responsibility, establishing guarantee system from top to bottom. Financial guarantee: to establish a special fund for workers ' wages, project workers ' wages may not be appropriated for its use, according to report project progress allow workers ' wages per month and on time, never in arrears. And laborers team leaders, workers ' wages have signed terms of reward and punishment, each migrant worker payment salary cards, payment of wages by the laborers team leaders sign, discovery team leader was not issued in full and on time wages of migrant workers, fined them 10 times. Establish oversight bodies: the monthly salary payments issued, so that every migrant worker can understand and monitor salary payments. 2.2 Summary of project construction, project manager and department managers are chosen and construction management experience, strong expertise, extensive construction experience with similar projects personnel. 2.3 15 days before the start of the project to the corporate services sector provides detailed workforce planning, corporate services sector according to the project plan to ensure. 2.4 resolutely implement State Council issued on effectively solving the problem of default on construction project cost notification file indicates the spirit of, strictly implement the longest [document 2004]54 on the issuance of the notice, commitment not to workers
/
本文档为【联想一键恢复7】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。 本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。 网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。

历史搜索

    清空历史搜索